Loading...
HomeMy WebLinkAboutOrdinances Book 14, Page 573, No Ordinance Number57 AN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH WEST KENTUCKY ASPHALT PAVING COMPANY FOR THE RESURFACING OF VARIOUS STREETS IN THE CITY OF PADUCAH, KENTUCKY, INCLUDING THE RAISING AND RESETTING OF MANHOLES, CATCH BASINS AND MONUMENTS, AND PRESCRIBING THE TERMS AND CONDITIONS OF SAID CONTRACT BE IT ORDAINED BY THE BOARD OF COMtIISSIONERS OF THE CITY OF PADUCAH, KENTUCKY: SECTION 1. That the City Manager be, and he is hereby, authorized to contract with West Kentucky Asphalt Paving Company (hereinafter referred to as the Contractor) for the resurfacing of various streets in the City of Paducah, Kentucky, said work shall be done on the following terms, conditions and specifications: The surfacing of the present pavement shall be leveled where necessary and resurfaced with 12—inch application of Kentucky State Highway Class I, Type B Bituminous concrete surfacing, Class I Bituminous leveling course, said work to include Bituminous prime coat RS -1 complying with Kentucky State Highway specifications, and the raising and resetting to grade of manholes, catch basins and monuments located in the areas to be resurfaced. The surfacina shall consist of limestone aggregate complying with Kentucky State Highway specifications. Said work of resurfacing shall be paid for by the City to the Contractor on the following basis: Class I, Type B Bituminous concrete surface mixture using all limestone aggregate for the sum of $7.60 per ton. Bituminous prime coat RS -1 complying with Highway specifica- tions for the sum of 20¢ per gallon. Raising and resetting manholes, catch basins and monuments for the sum of $40.00 each. The Conttactor shall resurface only such blocks of streets as may be authorized in writing by the City Manager, and it is anticipated that approximately 4,000 tons, more or less, of sur- facing will be required. All work shall be performed under the direction of the City of Paducah Engineering Department and such work shall be paid for upon certification of the completion thereof and when approved and accepted by the City Engineer. The Contractor is to execute a performance bond or bonds in an amount not less than the estimated cost of the work authorized by the City Manager to insure the proper performance and completion of said work, and in addition will be required to keep in full force and effect liability insurance to protect the city from any claim of persons or property of persons in the following amounts: 574 $50,000 for personal injury or death to any one person $100,000 for personal injury or death to more than one person resulting from the same accident, and $10,000 for damage to property in any one accident. SECTION 3. This ordinance shall be introduced and remain on file for public inspection for at least one (1) week in... -the completed form in which it shall be put upon its final passage, and if adopted shall be in full force and effect ten (10) days thereafter. Gly - mayor U Introduced by the Board of Commissioners June 27, 1961 Adopted by the Board of Commissioners July 11, 1961 Recorded by Sarah Thurman, City Clerk, July 11, 1961.