Loading...
HomeMy WebLinkAboutOrdinances Book 9, Page 443, No Ordinance NumberPage 443 AN ORDINANCE ASSESSING THE ABUTTING PROPERTY ON BOTH SIDES OF 19TH STREET, FROM, THE NORTH PROPFRTY LINE OF BROe.DV:fAY TO THE, SOUTH PROPEETY LINE OF JEFFERSON STREET; 20TH. STREET, FROM THE NORTH PPOPrRTY LINF OIB BROAD'NAY TO THE SOUTH PROPPRTY LIPIE OF JEFFERSON STREET; 21ST 39'RFFT, FROM THE NORTH PROPERTY I.INF OF BPOAD11AY TO THF SOUTH PFOPPPTY LINE OF JFFFFFFON STRFFT; 22ND STREET, FROM TRF NORTH PROPIFTY LINF OF BFOAD!"AY TO THF 'OUTF PROPT'FTY LINE OF JFFFFFFON �TRIFT; 23RD .STRFFT, IFFOM THF. WORTH PFOPT'RTY T -INF OF BROFD"!AY TO THF SOUTH PPOPTFTY LITIT OF JEFFERSON STRFFT; 24TH STREET, FROM 9.7t NOR' -H PPOPFRTY LINE OF BPOADWAY TO TIE SOUTH PFOPFFTY LINE OF JFFFFRFON "RFFT, IPI 'THF CISY 07 PADUCAH, MCCRACKFN COUNTY, KENTUCKY, FOR THF COST OF CONSTFUCTION OF PAVED STRFFT '.,'IITH ALL NECESSARY CURB, GUTTER, DRIVE!"AYS, MANHOLFF, INTAKE,-, CATCH BASINS, DRA N TILE AND SE9FR PIPE, A117D AIL NECESSArY ENGINEERING, ADVEFTIFING AND LEGAL AND CLEPICAL FFRVICE IN CONNFCTION THL•RE',ITH AS FOLLOWS: COST OF PAVING AND EXCAVATION - 19TH ST. "' $3.449138667 PER ABUTTING FT. COST OF PAVING AND EXCAVATION - 20TH ST.,..$4.700333839 PER ABUTITNG FT. COST OF PAVING AND EXCAVATION 8 21ST ST., 22ND ST., 23RD ST., 24TH STREET ............�4.536938543 PER ABUTTING FT. COST OF INTFFEST...........................80.01570837024 PER DOLLAR CONSTRUCTION COST. COST OF FNGINEFRING AND INSPECTION ......... 0.03469665903 PER DOLLAR CONSTRUCTION COST COST OP CONCRFTE GUT"_'FR....................$0.30 PER LIN. FT. COST OF CONCRETE DRIVFTAY.................. 0.25 PER SO. FT. COST OF CONCPFTE CURB CURVFD...............0.60 PFR LIN. FT. COST OF CONCRETE CURB STRAIGFFP.............1,'O.50 PER LIN. FT. COST OF CONCRETE GU7TFR REBUILT ............ $0.50 PER LIN. FT. AND PROVIDING THAT TRF COST OF SU'H COPIFT'PUCiIOPJ, INTETFST, EXTRA 'fJORK, AND ALL NECESSARY FNGINFFRING, ADVFRTISING AND LEGAL AND CLFRICAL SERVICE IN CONNECTION THFFE1.7ITR BE CHARGEABLE TO AND ASSESSED AGAINST THE PROPF:RT'Y RECEIVING THE BENFFIT OP SA?JF AND ABUTTING UPON SAID IMPROVEI,,F:N^l, AS FROI,IN BY THE ENGINEFRIS ESTIMATES ON FILE IN THE OFFICE OF THE C014MUSSIONFR OF PUBLIC WORKS, AND PROVIDING THAT SAID ASSESSMENT MAY BE PAID IN TEN EQUAL INSTALLMENTS, BEING ONE EACH YEAR FOR. A PERIOD OF TEN YEARS. WHEREAS, the Board of Commissioners of the City of Paducah, Kentucky has heretofore on the 8th day of April, 1929 adopted an ordinance entitled, "AN ORDINANCE FROVIDING FOR THE CONSTRUCTION AND RFCONSTFUCTION OF THF DRIVEfAY ON 19TH STRFFT, FROM THF NORTH PF.OPFRTY LINE OF BROADTAY TO THE SOUTH PROPFFTY LINT OF JFFF'FRFON STREET; AND ON 20TH STRFFT, FROM THE NORTH PFOPI'R'.lY LINE OF BROAD'FAY TO THE SOUTH PFOPERTY LINF OF JFFFFRFON STRFFT; AND ON 21ST STRFFT, FROM THE NORTH PROPERTY LINE OF BROAD!'lAY TO THF FOU'iH PFOPFFTY LINF OF JEFFERSON FT'RFFT; AND ON 22ND STRFFT, FROM 9'RF NORTH PFOFFRTY LIPTF OF BFOAD9;AY TO THE SOUTH PFOPFRT'Y LINF OF' JEFFERSON ETFFFT; AND ON 23RD STP,FFT, FRO14 THE NORTH PROPERTY LINE OF BROADUJAY TO TRF SOUTH PROR RTY LINE OF JFFFFRSON STPFF•T; AND ON 24TH STRFFT, FROM TNF NORTH PFOPRTY EINE OF BROADWAY TO THE SOUTH PROPFRTY LINF OF JFFFFRSON STREET, IN THE CITY OF PADUCAH, 1i Page 444 MCCRACKEN COUNTY, KENTUCKY, WITH ALL NF.CFSFARY CURBS, GU"TFRS, J ' DRIVE71AYS, VANHOLFS, INTAKES, CATCH BASING, SEWER AND DRAIN PIPE, AND ALL NECESSARY ENGINEFRING, ADVFRTIFING AND LEGAL AND CLERICAL SERVICE IN CONNECTION THFRF17ITH AT TIE COST OF THE ABUTTING PROPTRTY MINERS AND PROVIDING THAT SAME TfAY BE C CNSTFUCTED UPON THE TEN YEAR PAYMENT PLAN," and 'ifflFREAS, in accordance with said ordinance it is provided that the cost of construction of said driveway, together rith all necessary curb, gutter, driveways, manholes, intakes, catch basins, drain tile and sewer pipe, and a17 necessary engineering, advertising and legal and clerical service in connection therewith and sail other work done thereunder be paid for by the abutting property owners on both sides thereof., except that portion to be paid by the City of Paducah as required by law, and `.'lHEREAS, pursuant to said ordinance, a contract was entered into on the day of _1929 between the Southern Foads Company, contractors, and the City of Paducah, Kentucky for the construction thereof, and WHEREAS, said contract has in all respects been completed and the work thereunder fihnished and accepted by the Board of Commissioners of the City of Paducah pn the 27th day of November, 1929, pursuant to notice duly given and inspection of said work and the recommendation of acceptance made therefor by the Commission- er of Public "'orks of the City of Paducah, Kentucky, and pursuant to a motion made by SW Commissioner, which motion was duly adopted by the Board of Commissioners, NU.", THFRFFOFF, BE IT OFDAINED BY TIT BOARD OF CO!IPrISFIONFRS OF THF CITY Or PADUCAH, KENTUCKY; SECTION 1. That all of the property on both sides of 19th Street, from the North property line of Broadway to the South property line of Jefferson Street; and on 20th Street, from the north property line of Broadway to the south property line of Jefferson Street; and on 21st Street, from the north property line of Broadway to the south property line of Jefferson Street; and on 22nd Street, from the north property line of Broadway to the south property line of Jefferson Street; and on 23rd Street, from the north property line of Broadway to the south Droperty line of Jefferson Street; . and on 24th Street, from the north property line of Broadway to the south property line of Jefferson Street, in the City of Paducah, McCracken County, Kentucky, as shown by the Engineer`s Estimates, be, and the same is hereby assessed for the cost of construction of an improved, or asphalt street with alt necessary curb, gutter, Page 445 L!- :I driveways, manholes, intat-es, catch basins, drain tile and sewer pipe, andj i all necessary engineering:, advertisinfr and legal and clerical service in connection therewith. All of said work has been done under the ordinance and contract aforesaid and said assessment is as follows, to -wit: Cost of paving and excavation - 19th St...3.449138667 per abutting ft. Cost of paving and excavation - 20th St.:. 4.700333839 per abutting ft. Cost of paving and excavation - 21st St.,. 22nd St., 23rd St., and 24th St.,......... 4.536938543 per abutting ft. Cost of interest..........................0.01570837024 per dollar construction cost Cost of Engineering and inspection ........ $0.03469667903 per dollar construction cost Cost of concrete gutter...................$0.30 per lin. ft. Cost of concrete driveway .................�0.25 per sq. ft. Cost of concrete curb straight.............RO.50 per lin. ft. Cost of concrete curb curved..............60.60 per lin. ft. Cost of concrete gutter rebuilt ........... $0.50 per lin. ft. As shown by the Engineers Estimates on file in the office of the ICommissicner of Public Works, which estimates are adopted and made part I hereof . SECTION 2. That all of the funds derived from the assessment of said property aforesaid shall be used for the purpose of paying off the tax bills issued against said property, or such bonds as may be issued by the City of Paducah pursuant to Section 3101 of the Kentucky Statutes. SFCTION 3. That pursuant to Section 3101 of the Kentucky Statutes, as amended and re-enacted and now in force, said assessments may be, at the option of the property owners, payable in cash within thirty days from the date of the passing and recording of this ordinance, or in ten annu@Ll installments, pursuant to the provisions of said statutes. SECTION 4. In order to provide a fund for the immediate payment of the cost of that portion of the special assessments herein provided for, and which may be paid on the ten year installment plan, as hereinbefore provided for, the City of Paducah may issue and sell improvement bonds, and to secure the payment of which bonds there is hereby pledged such taxes and liens upon the property assessed herein for the payment of the principal and interest on such bonds, but said bonds shall not be sold for less than par, and the proceeds thereof applied exclusively to payment for the improvement of said street as hereinbefore mentioned, and such bonds, if issued, shall bear interest and shall be payable in accordance with the provisions of Section 3101 of the Kentucky Statutes, as amended and re-enabted by the General Assembly of the Commonwealth of Kentucky and now in force and effect. SECTION 5. This ordinance shall take effect and be in force from a after its passage, record and publication. Signed �- Passed by the Board of Commissioners November 27, 1929 Recorded by Hunt Crossland, Clerk, November 28, 1929