Loading...
HomeMy WebLinkAboutMO # 1192243 MUNICIPAL ORDER NO. 1192 A MUNICIPAL ORDER ADOPTING A REVISED SCHEDULE OF FEES AND CHARGES FOR SOLID WASTE PICK UP PURSUANT TO THE SOLID WASTE ORDINANCE, CHAPTER 94, SOLID WASTE, OF THE CODE OF ORDINANCES OF THE CITY OF PADUCAH, KENTUCKY BE IT ORDERED BY THE CITY OF PADUCAH, KENTUCKY: SECTION 1. By Municipal Order the Board of Commissioners of the City of Paducah hereby establishes a revised schedule of fees and charges attached hereto for solid waste pick up, pursuant to the Code of Ordinances of the City of Paducah, Kentucky, Chapter 94, Solid Waste Ordinance. SECTION 2. The rates adopted herein shall be effective on bills rendered on or after March 20, 2006. SECTION 3. This Order shall be in full force and effect from and after the date of its adoption. ATTEST: JWMX&..,O Tammara S. Brock, City Clerk Adopted by the Board of Commissioners, February 14, 2006 Recorded by Tammara S. Brock, February 14, 2006 \,no\solid waste fees 2006 Solid Waste Fees Pursuant to Ordinance 94-31 Residential and Commercial Residential Collection Rates Effective January 01, 2003 Number of Fees Number of Collections per Week 1 2 3 4 5 6 Containers 1 2 3 4 5 6 7 8 9 10 Collection 9.96 13.28 16.60 19.92 23.24 26.56 29.88 33.20 36.52 39.84 Disposal 3.89 7.78 11.67 15.56 19.45 23.35 27.24 31.13 35.02 38.91 Total 13.85 21.06 28.27 35.48 42.69 49.91 57.12 64.33 71.54 78.75 Commercial Accounts Utilizing 90 gallon roll-out container Number of Fees Number of Collections per Week 1 2 3 4 5 6 Containers 1 2 3 4 5 6 7 8 9 10 Collection 19.96 23.28 26.60 29.92 33.24 36.56 39.88 43.20 46.52 49.84 Disposal 3.89 7.78 11.67 15.56 19.45 23.35 27.24 31.13 35.02 38.91 Total 23.85 31.06 38.27 45.48 52.69 59.91 67.12 74.33 81.54 88.75 Commercial Dumpsters Size of Dumpster Fees Number of Collections per Week 1 2 3 4 5 6 7 2 Collection 34.50 69.00 103.50 138.00 172.50 207.00 241.50 Cubic Yards Disposal 15.56 31.13 46.69 62.25 77.82 93.38 108.94 50.06 100.13 150.19 200.25 250.32 300.38 350.44 Total 4 Collection 38.50 77.00 115.50 154.00 192.50 231.00 269.50 Cubic Yards Disposal 31.20 62.41 93.61 124.81 156.01 187.22 218.42 69.70 139.41 209.11 278.81 348.51 418.22 487.92 Total 6 Collection 42.50 85.00 127.50 170.00 212.50 255.00 297.50 Cubic Yards Disposal 46.69 93.38 140.07 186.76 233.45 280.14 326.83 89.19 178.38 267.57 356.76 445.95 535.14 624.33 Total 8 Collection 46.50 93.00 139.50 186.00 232.50 279.00 325.50 Cubic Yards Disposal 62.25 124.51 186.76 249.01 311.27 373.52 435.77 Totall 108.75 1 217.51 326.26 435.01 543.77 652.52 761.27 Cardboard Dumpsters - $46.50/mts Charges for Additional Pickup: 2 Cubic Yard - $35.00 per pick up 4 Cubic Yard - $40.00 per pick up 6 Cubic Yard - $45.00 per pick up 8 Cubic Yard - $55.00 per pick up Charge for Initiation and Reactivation of Commercial Accounts: $50.00 245 Pursuant to Ordinance 94-31 Charge for rollouts provided to private parties and for-pofit events. There will be no charge to neighborhood associations or churches that provide a seven-day notice request. The fees are as follows: $20.00 for 1 to 6 rollouts for an overnight or weekend event. This includes delivery, pickup, and one time dump. $35.00 for 7 to 10 rollouts for an overnight or weekend event. This includes delivery, pickup, and on time dump. $5.00 per dumpster charge for each additional dump. Increase the back door pickup service fee for non -handicap residents to $35.00 plus the cost of the rollout(s). The fee for handicap resident back door pickup service will remain the same. Pursuant to Ordinance 94-31 & 94-32 Charge for residential and commercial "call-back" services. The rate for returning to a residential customer will be $15 and $25 for commercial establishments. Pursuant to Ordinance 94-31 Compost Dumping Fee Regular Vehicles Dump Trucks Compost Fee - 21/2 yard bucket Now Increase Wood Chis $5.00 Single Wood Chip Compost Pick-up Truck $5.00 Axel $10.00 Small Trailer Premium Compost Double $15.00 (under 18') $5.00 Axel $15.00 Large Trailer (over 18') $10.00 Triple Axel $20.00 Semi Leaf Box $10.00 Truck $35.00 Compost Fee - 21/2 yard bucket Now Increase Wood Chis $5.00 N/A Wood Chip Compost $5.00 N/A Leaf Compost $10.00 $15.00 Premium Compost $10.00 $15.00 Pursuant to Ordinance 94-33 Increase construction dumpster fee to $75 for delivery. The dump fee will be based on the current CWI tipping fee and dependent on the type(s) and weight of material weight based on the following chart. Staff will provide basic weigh calculation information prior to delivery; final charges will be determined when the dumpster is emptied. `�� Light Loose Lumber 1 Cubic Yard 150 lbs) Sheetrock 1 Cubic Yard (394 lbs) Medium Asphalt Shingle Roofing 1 Cubic Yard 419 lbs) 246 Wood Shake Shingle Roofing 1 Cubic Yard (435 lbs) Mixed Structural 1 Cubic Yard 1 ton Construction 1 Cubic Yard (1.5 tons) Materials 1 Cubic Yard (500 lbs Metals 1 Cubic Yard 906 lbs) Heavv Mixed Inerts (dirt, bricks, concrete, asphalt, shingles, structural materials) 1 Cubic Yard 1 ton Dirt, Brick, Concrete, Asphalt (separated from other mat.) 1 Cubic Yard 1 ton Asphalt/Tar Roofing 1 Cubic Yard (1.5 tons)