HomeMy WebLinkAboutMO #3304MUNICIPAL ORDER NO. 3304
APPROVING AGREEMENTS RELATED TO THE FIRE DEPARTMENT TRAINING
FACILITY WATER MAIN PROJECT AND AUTHORIZING THE MAYOR TO
EXECUTE ALL DOCUMENTS RELATED THERETO
WHEREAS, the City of Paducah and Paducah Water desire to replace
aging water infrastructure serving the Fire Department Training Facility with a new
eight -inch water main; and
WHEREAS, Paducah Water will contribute the first $280,000 of
construction costs, with the City responsible for costs exceeding that amount; and
WHEREAS, the City desires to retain Bacon Farmer Workman
Engineering & Testing, Inc. to provide engineering services for the project for $24,500.
NOW, THEREFORE, BE IT ORDERED BY THE CITY OF PADUCAH,
KENTUCKY:
SECTION 1. The Board of Commissioners hereby approves the
Memorandum of Understanding between the City of Paducah and Paducah Water
concerning the Fire Department Training Facility Water Main Project, substantially in the
form attached hereto as Exhibit "A," and authorizes the Mayor to execute said
Memorandum of Understanding on behalf of the City.
SECTION 2. The Board of Commissioners hereby approves the
Reimbursement Agreement between the City of Paducah and Paducah Water,
substantially in the form attached hereto as Exhibit `B," pursuant to which Paducah
Water shall contribute the first $280,000.00 toward construction of the water main
improvements and the City shall reimburse Paducah Water for construction costs
exceeding $280,000.00. The Mayor is hereby authorized to execute said Reimbursement
Agreement on behalf of the City.
SECTION 3. The Board of Commissioners hereby approves a
Professional Services Agreement with Bacon Farmer Workman Engineering & Testing,
Inc. for engineering services associated with the Fire Department Training Facility Water
Main Project in the lump -sum amount of $24,500.00, substantially in the form attached
hereto as Exhibit "C," and authorizes the Mayor to execute said Agreement and all
related documents on behalf of the City.
SECTION 4. Expenditures authorized herein shall be charged to the Fire
Training Field Account, Account No. 10001801-523070, Project No. FI0032.
SECTION 5. This Order shall be in full force and effect from and after
the date of its adoption.
Mayor George Bray
ATTEST:
u
L indsay P ris , City Clerk
Adopted by the Board of Commissioners, September 8, 2026
Recorded by Lindsay Parish, City Clerk, September 8, 2026
\mo\MOU —Paducah Water— Fire Department Training Facility Water Main
Paducah Fire Department Training Facility
Memorandum of Understanding
J u Ly 2, 2026
Representatives from BFW, the City of Paducah Fire Department (City) and Paducah Water (PW)
met on June 23, 2026 to discuss water supply for the proposed training facility located at 1400
Tennessee Street. Following this discussion, PW reviewed the information provided by BFW and
met internally to evaluate the needs of the project as well as the mutual benefit to both the City and
PW.
PW proposes the following items for the City's consideration to move the project forward:
1. PW is aggregable to the project scope as proposed by BFW. A new 8" PVC main will be
installed along 12`h and Tennessee Streets from Caldwell Street to the site and the existing 6"
cast iron mains along this corridor will be abandoned in place in accordance with PW's
standard specifications.
2. BFW will design and permit the water main project incoordination with PW and procure a
construction contract. For this project, PW will be considered the Owner and will enter
directly into an Agreement with a Contractor for this project.
PW will administer the construction contract and provide construction inspection as with
any other water main project. PW will perform testing and as -built documentation of the
project in its entirety. PW will coordinate with BFW for any construction -related involvement
on an as -needed basis. PW's involvement with construction inspection, testing and
contract administration will be provided at no cost to the City. Upon completion of the
project, BFW will deliver a set of as -built drawings to PW.
4. All costs associated with BFW's involvement will be paid by the City.
5. PW will contribute $280,000 toward the construction of this project. The City will be
responsible for all costs in excess of this amount. This arrangement will be established
through a Reimbursement Agreement that will be prepared by PW and reviewed and
approved by both the City and PW governing bodies. PW will require this Reimbursement
Agreement to be fully executed before PW will award a construction contract or enter into an
Agreement with a Contractor for this project.
6. PW will pay the Contractor (utilizing PW capital funds) based on approved invoices
submitted to PW. Once the project has been completed, PW will submit an invoice to the
Cityfor reimbursement of construction costs in excess of $280,000 as stipulated in the
Reimbursement Agreement.
7. Anew 6" water meter, set at the gate to the facility, will delineate the point of metering and
ownership once the project has been constructed. The Citywill own all infrastructure on the
customer -side of the meter. PW will own the meter setting.
8. Due to the unique nature of this facility, PW will work with BFW to design and construct the
6" meter in-line as part of the water main project rather than constructing a traditional meter
settingto help control costs. There will be no separate meter setting fee, as this will be
incorporated into the cost of the project.
1 of 2
EXHIBIT "A"
9. 1SA is agreeable with the sewer service to the fire training center being billed at a 1SA's flat
monthly rate rather than based on metered consumption. With this approach, it will not be
necessary to install a water meter for the purposes of billing sanitary sewer. PW is agreeable
with the concept of the fire training center being served from the customer-side of the 6"
meter.
10. Billing for water meter(s) will be consistent with current practice for the City.
11. The City will notify PW's Treatment Plant Superintendent of any planned training events
where it is anticipated that more than 500 gpm will be utilized.
End
2 of 2
REIMBURSEMENT AGREEMENT
FIRE TRAINING CENTER PROJECT
1400 Tennessee Street
THIS REIMBURSEMENT AGREEMENT is made and executed on this day of
, 2026, by and between CITY OF PADUCAH, KENTUCKY, a Municipal
Corporation of the Second Class, with a mailing address of P.O. Box 2267, Paducah,
Kentucky 42002-2267, hereinafter referred to as "City," and PADUCAH WATER, with a
mailing address of 1800 North 8th Street, Paducah, Kentucky 42001, hereinafter referred to
as "PW;"
WITNESSETH:
WHEREAS, the City desires to construct a new Fire Training Center located at 1400
Tennessee Street, hereinafter referred to as "Training Center Project,"; and
WHEREAS, the Training Center Project requires a supply of water that exceeds the
existing capacity available at the proposed location; and
pplies
WHEREA'S\oi
ao
rater main "fn t
I.d;and
WHERE,p,`the
to replace and
WHEREAS, improvements to the water infrastructure aligns with the City's
Southside Revitalization Initiative; and
WHEREAS, the City and PW agree to enter into an agreementforthe replacement
and betterment arrangement to replace existingwater infrastructure, hereinafter referred
to as "Water Construction", generally consisting of the construction of a new 8 -inch water
main from Caldwell Street along South 12th Street to the Training Center Project that will
replace existing 6 -inch water mains along this corridor.
NOW, THEREFORE, in consideration of the foregoing, the legal adequacy and
sufficiency of which is hereby acknowledged by both parties hereto, the parties do
covenant and agree as follows:
1. Design and Procurement. The City's engineer, BFW, will design, permit and
procure a construction contract for the Water Construction project.
Contractually, PW will be considered the Owner and will enter directly into
an Agreement with the selected Contractor.
2. Construction. PW will administer the construction contract and provide
construction inspection services, testing and as -built documentation for the
Water Construction project in its entirety. PW will coordinate with BFW for
any construction -related involvement on an as -needed basis.
1 of 3
EXHIBIT "B"
3. Allocation of Cost. PW will contribute the first $280,000 toward the Water
Construction project. The City will be responsible for all costs in excess of
this amount as well as all costs associated with BFW's involvement. PW's
involvement with construction inspection, testing and contract
administration will be provided at no cost to the City.
4. Reimbursement PW will pay the Contractor based on invoices submitted to
and approved by PW's Director of Field Operations. At the completion of
construction, PW will submit an invoice to the City for reimbursement of
construction costs in excess of $280,000. The City agrees to reimburse PW
within sixty (60) consecutive calendar days upon receiving an itemized
invoice.
5. Memorandum of Understandine. All items contained in a Memorandum of
Understanding dated July 2, 2026 that are not specifically addressed in this
Agreement are incorporated herein by reference.
ion fina
ng any
2 of 3
Miscellaneous Provisions. This Agreement represents the entire
understanding by and between the parties regarding the reimbursement of
the costs and expenses incurred by PW and all prior statements, promises,
and agreements are merged herein by reference. This Agreement shall be
binding upon the parties hereto, their heirs, successors, and assigns.
PADUCAH WATER
0
Title:
CITY OF PADUCAH, KENTUCKY
By:
3of3
July 22, 2026
Mr. Stephen Kyle
Fire Chief
Paducah Fire Department
301 Washington Street
Paducah, KY 42003
RE: Proposal for Paducah Fire Training Facility Water Main Extension
Dear Chief Kyle:
Bacon Farmer Workman Engineering & Testing, Inc. is pleased to provide you with a proposal for civil
engineering services as requested:
&TEN9:4:Air�/_1h1*4114 &1101
• Provide Water Main Extension Design Plans for permitting and construction by Paducah Water.
• Design Plans will include water main plan and profiles and details designed to Paducah Water
standards and specifications.
• Work will include coordination with Paducah Water for permitting and construction contract
procurement according to the Paducah Fire Department Training Facility Memorandum of
Understanding (MOU) provided by Paducah Water.
• Work will include limited construction administration on an "as needed" basis (Paducah Water
committed to construction administration in the MOU, with BFW's construction -related
involvement on an as -needed basis),
• Work will include as -built plans provided to Paducah Water.
• Work will include using Kentucky LiDAR data for topography and published Kentucky aerial
mapping for drawing base, with limited surveying on an as needed basis.
• Work will include limited system modeling in KY Pipe to assure flows and pressures are achieved
with the final design.
ASSUMPTIONS AND EXCLUSIONS
• Full Topographic and Boundary Survey is not included
• BFW will show existing utilities on the drawings according to published GIS information and
surface features on site. Subsurface utilities that are not shown on published GIS mapping or
marked by KY 811 will not be shown.
• Flow test data will be provided by Paducah Water for the water system modeling.
• Easement acquisition is not included. It is assumed that all water main will be approved in utility
corridors on City right-of-way.
BFW proposes to perform the above defined scope of work for a cost of $24,500.00. The design and
engineering proposal is based on a lump -sum cost for the services listed in the scope. Reimbursable
expenses such as permit fees will be billed directly to the owner or client. Additional work not listed in the
scope above will be billed on a time and material basis.
2301 McCracken Boulevard, Paducah, KY 42001 / bfwengineers.com / 270-443-1995
EXHIBIT "C"
Proposal for Paducah Fire Training Facility Water Main Extension
BFW proposed to complete the work according to the following projected schedule:
The schedule is approximate based on normal timeframes to complete a project of this magnitude. Every
effort will be made to meet or exceed the schedule expectations.
If you agree with these costs and project details, please return the executed contract for BFW's
authorization to proceed. We look forward to working with you in the future and should you have any
questions or need further information, please contact our office at (270) 443-1995.
Sincerely,
Bacon Farmer Workman Engineering & Testing, Inc.
Joseph E. Matesevac, P.E.,
V.P., Water Resources Division Lead
Page 2
iv,.-
1
Obtain necessary field information, online LiDAR data and
1 week
preliminary design coordination with Paducah Water
2
Preparation of design drawings and contract documents for
3 weeks
submittal to Paducah Water for permit approval
3
Paducah Water review and approval
3 weeks
4
Advertise for bid
2 weeks
5
Bid Opening and Contract Approval
2 weeks
6
Construction
12 weeks
The schedule is approximate based on normal timeframes to complete a project of this magnitude. Every
effort will be made to meet or exceed the schedule expectations.
If you agree with these costs and project details, please return the executed contract for BFW's
authorization to proceed. We look forward to working with you in the future and should you have any
questions or need further information, please contact our office at (270) 443-1995.
Sincerely,
Bacon Farmer Workman Engineering & Testing, Inc.
Joseph E. Matesevac, P.E.,
V.P., Water Resources Division Lead
Page 2