Loading...
HomeMy WebLinkAbout12-05-2024Paducah Fire Department Fire Prevention Division Office of the Fire Marshal 300 South 5th Street Stephen D. Kyle, Fire Chief P.O. Box 2267 skyle@paducahky.gov/270-444-8521 Paducah KY 42002-2267 J. Greg Cherry, Deputy Chief/Fire Marshal geherry@paducahky.gov/270-444-8522 Building and Electrical Codes Appeals Board Special Called Meeting Minutes The Building and Electrical Codes Appeals Board was held on Thursday, December 5, 2024, in the Commission Chambers in City Hall. In attendance were Paul King, Rick Windhorst, Greg Croft, Chad Beyer, Kerry Fulcher, Jason Hickey, Chris Black with Ray Black and Son, Patrick Carver and Hector Rojas with Beltline Electric, Ryan Samsil with Crown Electric, Jarrad Shadowan and Beau Barrett with LB.E.W., Kip Denkins and Tracy Kenson with Story Electric, Josh Kowalczik with A & K, Mike Lawson with M. P. Lawson, Tony Bevil with D. C. Electric, Cory Riley with Jay's Electric, Brad Story with GCC Engineering, Baccus Oliver Marcum Engineering and B.F.W.,Vaughn Hugen, Jeff Prescott, Greg Cherry, Steve Kyle, April Tinsman, Kristen Krueger, and Janet Dicke. L The meeting was called to Order by Paul King, Chairman. II. Roll Call Paul King Rick Windhorst Greg Croft Chad Beyer Kerry Fulcher Jason Hickey Absent: Jimmy Evans III. Approve Minutes The minutes were read and approved. Motion made by Chad Beyer and seconded by Jason Hickey. Motion carried. Update: Mora Mi Apartments — Electrical Upgrades Tony Gray, Electrical Design Manager with Marcum Engineering — "we are complete with the design and awaiting payment from Raphy before we issue stamped and signed documents. I'll copy you on the documents when we send them out and return the existing drawings we borrowed." Per email dated December 5, 2024 attached. IV. Discussion of Reviewing Electrical Plans This was a very lengthy, in depth conversation regarding electrical plan review for commercial buildings. It was the consensus by the attending contractors the City should offer the volunteer electrical plan review. Upon submission of construction documents the electrical inspector will review the documents for NEC compliance. If any discrepancy with the code is observed the by electrical inspector he will prepare a question or correction list for the designer of the plans for a rebuttal and/or to resubmit plans with corrections. The purpose of the plan review would be to advert or reduce the changes of code violations being performed in the field. Which would reduce the cost to the owner for the stoppage to the project and to reconfigure the design for the project. The Board stated they would like more information from the City Attorney, Kristen Krueger on the legal aspects of electrical plan review then return in January. V. Brief discussion on raising permit fees. VI. Jason Hickey made the motion to adjourn, Chad Beyer seconded. Motion carried.