Loading...
HomeMy WebLinkAboutMO #3166MUNICIPAL ORDER NO. 3166 A MUNICIPAL ORDER AUTHORIZING AND APPROVING A CONTRACT FOR SERVICES BETWEEN THE CITY OF PADUCAH AND BACON, FARMER WORKMAN ENGINEERING & TESTING, INC., FOR A NOT TO EXCEED AMOUNT OF $153,000 FOR THE DESIGN AND ENGINEERING SERVICES FOR THE GREENWAY TRAIL PHASE 7 — SOUTHSIDE EXPANSION PROJECT, AND AUTHORIZING THE MAYOR TO EXECUTE ALL DOCUMENTS RELATED TO SAME WHEREAS, on Friday, September 26, 2025, the City of Paducah Engineering Department opened sealed Requests For Qualification for the Greenway Trail Phase 7 — Southside Expansion Project— Design, Engineering and Construction Inspection; and WHERAS, the City received two submittals, one from Bacon Farmer Workman Engineering and Testing, Inc., and one from GAI Consultants. After careful consideration, the Review Team selected Bacon Farmer Workman Engineering and Testing, Inc. (BFW) as the most qualified, responsive, and responsible firm. BE IT ORDERED BY THE BOARD OF COMMISSIONERS OF THE CITY OF PADUCAH, KENTUCKY, AS FOLLOWS: SECTIONI . The City hereby authorizes and approves a Professional Service Contract with Bacon, Farmer Workman Engineering & Testing, Inc., in an amount not to exceed $153,000, for the design, engineering and construction inspection of the Greenway Trail Phase 7 — Southside Expansion Project, and authorizes the Mayor to execute all documents related to same. SECTION 2. The expenditure shall be charged to GWT7 Southside Expansion, Account Number PAO 13 8. SECTION 3. This order shall be in full force and effect from and after the date of its adoption. George Bray, AT EST: ` �I �- �- indsay ParisA, City Clerk Adopted by the Board of Commissioners, December 9, 2025 Recorded by Lindsay Parish, City Clerk, December 9, 2025 1M0lcontract-BFW Greenway Trail Phase 7