HomeMy WebLinkAboutMO #3166MUNICIPAL ORDER NO. 3166
A MUNICIPAL ORDER AUTHORIZING AND APPROVING A CONTRACT FOR
SERVICES BETWEEN THE CITY OF PADUCAH AND BACON, FARMER WORKMAN
ENGINEERING & TESTING, INC., FOR A NOT TO EXCEED AMOUNT OF $153,000 FOR
THE DESIGN AND ENGINEERING SERVICES FOR THE GREENWAY TRAIL PHASE 7 —
SOUTHSIDE EXPANSION PROJECT, AND AUTHORIZING THE MAYOR TO EXECUTE
ALL DOCUMENTS RELATED TO SAME
WHEREAS, on Friday, September 26, 2025, the City of Paducah Engineering
Department opened sealed Requests For Qualification for the Greenway Trail Phase 7 —
Southside Expansion Project— Design, Engineering and Construction Inspection; and
WHERAS, the City received two submittals, one from Bacon Farmer Workman
Engineering and Testing, Inc., and one from GAI Consultants. After careful consideration, the
Review Team selected Bacon Farmer Workman Engineering and Testing, Inc. (BFW) as the
most qualified, responsive, and responsible firm.
BE IT ORDERED BY THE BOARD OF COMMISSIONERS OF THE CITY OF
PADUCAH, KENTUCKY, AS FOLLOWS:
SECTIONI . The City hereby authorizes and approves a Professional Service
Contract with Bacon, Farmer Workman Engineering & Testing, Inc., in an amount not to exceed
$153,000, for the design, engineering and construction inspection of the Greenway Trail Phase 7
— Southside Expansion Project, and authorizes the Mayor to execute all documents related to
same.
SECTION 2. The expenditure shall be charged to GWT7 Southside Expansion,
Account Number PAO 13 8.
SECTION 3. This order shall be in full force and effect from and after the date of
its adoption.
George Bray,
AT EST: ` �I
�-
�- indsay ParisA, City Clerk
Adopted by the Board of Commissioners, December 9, 2025
Recorded by Lindsay Parish, City Clerk, December 9, 2025
1M0lcontract-BFW Greenway Trail Phase 7