HomeMy WebLinkAboutMO #2668MUNICIPAL ORDER NO. 2668 A MUNICIPAL ORDER AUTHORIZING AND APPROVING A CONSTRUCTION CONTRACT BETWEEN THE CITY OF PADUCAH AND DREDGE AMERICA, INC., FOR HYDRAULIC DREDGING OF APPROXIMATELY 60,000 CUBIC YARDS IN A BASE AMOUNT OF $995,000, FOR THE PADUCAH TRANSIENT DOCK DREDGING PROJECT, AUTHORIZING THE CITY ENGINEER TO EXERCISE OPTIONS FOR DREDGING IN YEARS TWO AND THREE AS CONTAINED IN THE BID OF DREDGE AMERICA, INC., AND AUTHORIZING THE MAYOR TO EXECUTE ALL DOCUMENTS RELATED TO SAME WHEREAS, on April 24, 2020, a major disaster declaration, FEMA -4540 -DR - KY, was signed by the President for the 2020 Flooding and Severe Weather events occurring from February 2, 2020, through February 29, 2020; and WHEREAS, as a result, the City of Paducah applied for and received Disaster Relief Funding for the removal of sediment accumulation impeding access to the Transient Dock under Event 4540DR-KY; and WHEREAS, on September 3, 2022, the Engineering Department published in the Paducah Sun a Request for Bids for the Paducah Riverfront Transient Boat Dock Dredging Project; and WHEREAS, bids on the project were opened on September 28, 2022, with Dredge America, Inc. submitting a responsive and responsible base bid of $995,000.00 with Option 1 at $1,044,750.00 for 2nd year dredging and Option 2 at $1,096,837.50 for 3rd year dredging for a project total of $3,136,587.50; and WHEREAS, the City received a permit from The Kentucky Division of Water with US Army Corps of Engineers concurrence to perform a maximum of 60,000 cubic yards of dredging per year; and WHEREAS, the City has received a recommendation from HDR, Inc., that the bid from Dredge America, Inc., is a responsive bid and should be accepted as such. NOW, THEREFORE, BE IT ORDERED BY THE BOARD OF COMMISSIONERS OF THE CITY OF PADUCAH, KENTUCKY, AS FOLLOWS: SECTION 1. The City hereby authorizes and approves an Agreement with Dredge America, Inc., in the amount of $995,000 for the Paducah Transient Dock Dredging Project. Further, the City hereby authorizes and empowers the City Engineer to accept Option 1 at $1,044,750.00 for 2nd year dredging and Option 2 at $1,096,837.50 for 3rd year dredging, as necessary and as contained in the bid of Dredge America, Inc., said bid being in substantial compliance with bid specifications, and as contained in the bid of Dredge America, Inc. of September 28, 2022. SECTION 2. The Federal Emergency Management Agency (FEMA) has estimated $4,422,158.10 total project cost with 90% Federal Share and 10% Non -Federal Share. FEMA has obligated $3,979,942.29 in Federal funds for the Paducah Transient Dock Dredging Project. The Non -Federal Share of $442,215.81 is split between State 4.8% ($212,263.59) and Local 5.2% ($229,952.22) cost shares. SECTION 3. The local match in the amount of $229,952.22 e shall be charged to Project DT0047. SECTION 4. This order shall be ivIloll force and effect from and after the date of its adoption. George Bray, Mayor 41 ATTEST: L Lindsay ParisWtity Clerk Adopted by the Board of Commissioners, October 25, 2022 Recorded by Lindsay Parish, City Clerk, October 25, 2022 \MO\agree-Dredge America, Inc. — Paducah Transient Dock Dredging Project