HomeMy WebLinkAbout2022-04-8730ORDINANCE NO. 2022-04-8730
AN ORDINANCE ACCEPTING THE BID OF JIM SMITH CONTRACTING,
LLC, IN THE AMOUNT OF $1,985,514.37 FOR THE CONSTRUCTION OF A
REPLACEMENT STRUCTURE FOR THE BUCKNER LANE BRIDGE OVER CROOKED
CREEK, THE INSTALLATION OF A NEW CULVERT UNDER OAKCREST DRIVE, AND
ASSOCIATED ASPHALT ROADWAY WIDENING AND UTILITY RELOCATIONS,
AUTHORIZING THE MAYOR TO EXECUTE A CONTRACT FOR SAME, AND
AUTHORIZING THE FINANCE DIRECTOR TO TRANSFER $1.7 MILLION FROM ARPA
PROJECT ACCOUNT INTO THE BUCKNER LANE BRIDGE REPLACEMENT PROJECT
ACCOUNT
BE IT ORDAINED BY THE CITY OF PADUCAH, KENTUCKY:
SECTION 1. That the City of Paducah accepts the bid of Jim Smith Contracting,
LLC in the amount of $1,985,514.37 for the Buckner Lane Bridge Replacement Project. BFW
Engineering & Testing performed bid evaluation and recommended Jim Smith Contracting, LLC
as submitting the lowest responsive bid, said bid being in substantial compliance with bid
specifications, and advertisement for bids, as contained in the bid of Jim Smith Contracting,
LLC, of March 23, 2022.
SECTION 2. That the Mayor is hereby authorized to execute a contract with Jim
Smith Contracting, LLC for the Buckner Lane Bridge Replacement Project, authorized in
Section 1 above, according to the specifications, bid proposal and all contract documents
heretofore approved and incorporated in the bid.
SECTION 3. That the Finance Director is hereby authorized and instructed to
transfer $1.7 Million from the ARPA Project Fund into the Buckner Lane Bridge Replacement
Project Account (PF0078). The expenditure, authorized by Section 1 above, shall be charged to
the Buckner Lane Bridge Replacement Project Account (PF0078).
SECTION 4. This Ordinance shall be read on two separate days and will become
effective upon summary publication pursuant to KRS Chapter 42
George Bray, May
ATTEST:
� _ 1
Lindsay Paris , City Clerk
Introduced by the Board of Commissioners, April 12, 2022
Adopted by the Board of Commissioners, April 26, 2022
Recorded by Lindsay Parish, City Clerk, April 26, 2022
Published by The Paducah Sun, April 29, 2022
\ord\eng\agree- Jim Smith Contracting Buckner Lane Bridge Project - 2022