Loading...
HomeMy WebLinkAbout2022-04-8730ORDINANCE NO. 2022-04-8730 AN ORDINANCE ACCEPTING THE BID OF JIM SMITH CONTRACTING, LLC, IN THE AMOUNT OF $1,985,514.37 FOR THE CONSTRUCTION OF A REPLACEMENT STRUCTURE FOR THE BUCKNER LANE BRIDGE OVER CROOKED CREEK, THE INSTALLATION OF A NEW CULVERT UNDER OAKCREST DRIVE, AND ASSOCIATED ASPHALT ROADWAY WIDENING AND UTILITY RELOCATIONS, AUTHORIZING THE MAYOR TO EXECUTE A CONTRACT FOR SAME, AND AUTHORIZING THE FINANCE DIRECTOR TO TRANSFER $1.7 MILLION FROM ARPA PROJECT ACCOUNT INTO THE BUCKNER LANE BRIDGE REPLACEMENT PROJECT ACCOUNT BE IT ORDAINED BY THE CITY OF PADUCAH, KENTUCKY: SECTION 1. That the City of Paducah accepts the bid of Jim Smith Contracting, LLC in the amount of $1,985,514.37 for the Buckner Lane Bridge Replacement Project. BFW Engineering & Testing performed bid evaluation and recommended Jim Smith Contracting, LLC as submitting the lowest responsive bid, said bid being in substantial compliance with bid specifications, and advertisement for bids, as contained in the bid of Jim Smith Contracting, LLC, of March 23, 2022. SECTION 2. That the Mayor is hereby authorized to execute a contract with Jim Smith Contracting, LLC for the Buckner Lane Bridge Replacement Project, authorized in Section 1 above, according to the specifications, bid proposal and all contract documents heretofore approved and incorporated in the bid. SECTION 3. That the Finance Director is hereby authorized and instructed to transfer $1.7 Million from the ARPA Project Fund into the Buckner Lane Bridge Replacement Project Account (PF0078). The expenditure, authorized by Section 1 above, shall be charged to the Buckner Lane Bridge Replacement Project Account (PF0078). SECTION 4. This Ordinance shall be read on two separate days and will become effective upon summary publication pursuant to KRS Chapter 42 George Bray, May ATTEST: � _ 1 Lindsay Paris , City Clerk Introduced by the Board of Commissioners, April 12, 2022 Adopted by the Board of Commissioners, April 26, 2022 Recorded by Lindsay Parish, City Clerk, April 26, 2022 Published by The Paducah Sun, April 29, 2022 \ord\eng\agree- Jim Smith Contracting Buckner Lane Bridge Project - 2022