HomeMy WebLinkAboutCCMPacket2021-07-13CITY COMMISSION MEETING
AGENDA FOR JULY 13, 2021
5:00 PM
CITY HALL COMMISSION CHAMBERS
300 SOUTH FIFTH STREET
Any member of the public who wishes to make comments to the Board of Commissioners is asked to fill out a Public
Comment Sheet and place it in the box located at the end of the Commissioner’s desk on the left side of the Commission
Chambers. The Mayor will call on you to speak during the Public Comments section of the Agenda.
ROLL CALL
INVOCATION
PLEDGE OF ALLEGIANCE
ADDITIONS/DELETIONS
EMPLOYEE INTRODUCTION Introduction of Greg Guebert, Assistant City Engineer
MAYOR'S REMARKS
Items on the Consent Agenda are considered to be routine by the Board of Commissioners and will be enacted by one
motion and one vote. There will be no separate discussion of these items unless a Board member so requests, in which
event the item will be removed from the Consent Agenda and considered separately. The City Clerk will read the items
recommended for approval.
I. CONSENT AGENDA
A.Approve Minutes for June 22, 24 & 25, 2021
B.Receive & File Documents
C.Tree Advisory Board - Reappointment of Chris Dye and Jonathan
Perkins
D.Personnel Actions
E.Approve Contract with Dallmann Systems, Inc. to provide a Security
Camera Network and Video Management System to be used by Barkley
Regional Airport for $70,114.71 (Grant Funded) - T WILSON
F.Authorize Application for a FY 2021 Edward Byrne Memorial Justice
Assistance Grant (JAG) in the amount of $12,325.00 - B LAIRD
G.Fleet Maintenance Service Agreement between City of Paducah Fleet
Department and Paducah McCracken County Joint Sewer Agency - C
YARBER
H.Fleet Maintenance Service Agreement between City of Paducah Fleet
Department and Kevil City Fire Department - C YARBER
I.Fleet Maintenance Service Agreement between City of Paducah Fleet
Department and Kevil Rural Fire Department - C YARBER
J.Authorize Contract with Aramark for Uniform Services for use by the
Public Works Department, Engineering Department, and Parks
Department - C YARBER
K.Declaration of Trust and Trust Partnership Agreement for the Kentucky
League of Cities Workers' Compensation Trust - S SUAZO
L.Trust Participation Agreement - Kentucky League of Cities Insurance
Services - General Insurance Trust - S SUAZO
II. MUNICIPAL ORDER(S)
A.Declaration and Transfer of Surplus Property to Habitat for Humanity
(2011 Guthrie Avenue) - N HUTCHISON
B.Declaration and Transfer of Surplus Property to Midtown Alliance of
Neighbors (513 North 14th Street) - N HUTCHISON
C.Approve the allocation of American Rescue Plan Act Funds in the
amount of $4 million toward specific Stormwater Infrastructure Projects
- J ARNDT
D.Acquisition of Permanent Public Utility and Drainage Easements from
Gill Family Properties, LLC located at 701 & 702 Oakcrest Drive for
the Buckner Lane Bridge Replacement Project - R MURPHY
E.Approval of Purchase of Property at 2416, 2420 & 2540 Barnett Street
and 2364 South 24th Street from Hawker Holdings, LLC for $34,500 -
R MURPHY
F.Accept proposed premiums from the Kentucky League of Cities for
Workers’ Compensation, Liability Insurance and Property Insurance
Coverage in a total amount of $1,188,408.13 - S SUAZO
G.Authorization for Mayor to execute an Employment Agreement with
Daron Jordan for the City Manager position - S SUAZO
H.Approve Professional Consulting Services Agreement with Arndt
Municipal Support in an amount of $7,844.00 plus actual expenses -
MAYOR BRAY
III. ORDINANCE(S) - INTRODUCTION
A.Amend Section 78-31 of the Paducah Code of Ordinances to Designate
Juneteenth National Independence Day as a Holiday for City Employees
- M SMOLEN
B.Change Order for Pump Station #2 Construction Contract with Pace
Contracting, LLC in the amount of $121,733.29. - R MURPHY
C.Approval of Contract for Floodwall Seal Closures Project with Jim
Smith Contracting, LLC in the amount of $577,763.16 - R MURPHY
D.Approval of Contract for Floodwall Flapgate Replacement Project with
Jim Smith Contracting, LLC in the amount of $ 2,152,000.00- R
MURPHY
IV. DISCUSSION
A.Paving Update: Historical & Upcoming - R MURPHY
V. COMMENTS
A.Comments from the City Manager
B.Comments from the Board of Commissioners
C.Comments from the Audience
VI. EXECUTIVE SESSION
June 22, 2021
At a Regular Meeting of the Paducah Board of Commissioners held on Tuesday, June 22, 2021, at
5:00 p.m., in the Commission Chambers of City Hall located at 300 South 5th Street, Mayor Bray
presided. Upon call of the roll by the City Clerk, the following answered to their names:
Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray (5).
INVOCATION:
Commissioner Wilson led the invocation.
PLEDGE OF ALLEGIANCE
Mayor Bray led the pledge.
MAYOR ’S REMARKS
There will be a joint meeting with the County Fiscal Court to discuss the Sports Park and
911. This meeting will be held on Thursday, June 24, at 5:00 p.m. at the Convention Center.
The City Manager search is ongoing.
CONSENT AGENDA
Mayor Bray asked if the Board wanted any items on the Consent Agenda removed for separate
consideration. Mayor Bray asked that Items I(F) and I(G) be removed for separate discussion.
Mayor Bray asked the City Clerk to read the remaining items on the Consent Agenda.
I(A) Approve Minutes for June 8, 2021, Paducah Board of Commissioners Meetings
I(B) Receive and File Documents:
Deed File:
1. Deed of Conveyance – City of Paducah to Maria Angelique Korte – 2028 Clay
Street – MO #2427
Contract File:
1. Legal Binding Agreement and Commonwealth of Kentucky Contract –
Community Block Grant Program – Paducah Center Point and Four Rivers
Behavioral Health, LLC. – MO #2377
2. Emergency Solutions Grant (ESG-CV) for Emergency Shelter in the amount of
$31,500 through the Kentucky Housing Corporation – MO #2452
3. Addendum to Agreement For Employment – City Manager James Arndt – MO
#2463
4. Entertainment Destination Center Agreements: ORD 2021-04-8685
Tribeca Inc. (d/b/a 1857 Hotel)
Barrel and Bond, LLC
Broussard’s Cajun Cuisine
The Bully Gorilla
Cynthia’s
Foxbriar Bar
June 22, 2021
The Freight House
The Johnson Bar
Max’s Brick Oven Café
The Old-Fashioned Cigar Bar
Over/Under
Paducah Axe
Paducah Beer Werks
I(C) Reappointment of Vickie Brantley and Appointment of Mary “Mag” Wells-Vallejo to
replace Linnea Baumgardner, whose term has expired, to the Paducah-McCracken
County Senior Citizens, Inc. Said terms shall expire June 30, 2024.
I(D)
Reappointment of William Cox, Mark Davis and Bryan Carner to the Paducah Area
Transit System . Said terms shall expire June 30, 2025.
I(E) Personnel Actions
I(F) A MUNICIPAL ORDER ADOPTING THE FY2021-2022 POSITION AND PAY
SCHEDULE FOR THE FULL-TIME EMPLOYEES OF THE CITY OF PADUCAH,
KENTUCKY (Removed for separate discussion)
I(G) A MUNICIPAL ORDER ADOPTING THE FY2021-2022 JOB GRADE SCHEDULE
FOR THE EMPLOYEES OF THE CITY OF PADUCAH, KENTUCKY (Removed for
separate discussion)
I(H) A MUNICIPAL ORDER ACCEPTING A 2020 COMMUNITY DEVELOPMENT
BLOCK GRANT IN THE AMOUNT OF $200,000 THROUGH THE DEPARTMENT
FOR LOCAL GOVERNMENT FOR THE FOUR RIVERS RECOVERY CENTER AND
AUTHORIZING THE MAYOR TO EXECUTE ALL REQUIRED GRANT AWARD
DOCUMENTS (MO #2467; BK 12)
I(I) A MUNICIPAL ORDER AUTHORIZING AN APPLICATION FOR A 2021
COMMUNITY DEVELOPMENT BLOCK GRANT IN THE AMOUNT OF $200,000
THROUGH THE DEPARTMENT FOR LOCAL GOVERNMENT FOR THE FOUR
RIVERS RECOVERY CENTER FOR PERSONNEL EXPENSES (MO #2468; BK 12)
Commissioner Gault offered motion, seconded by Commissioner Guess, that the items on the
consent agenda be adopted as presented.
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5).
June 22, 2021
MUNICIPAL ORDERS
APPROVE PAY AND POSITION SCHEDULE FY 2021-2022
Commissioner Guess offered motion, seconded by Commissioner Gault, that the Board of
Commissioners adopt a Municipal Order entitled, “A MUNICIPAL ORDER ADOPTING THE
FY2021-2022 POSITION AND PAY SCHEDULE FOR THE FULL-TIME EMPLOYEES OF THE
CITY OF PADUCAH, KENTUCKY”
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5). (MO #2465; BK 12)
APPROVE JOB GRADE SCHEDULE FOR NON-UNION CITY EMPLOYEES
FY 2021-2022
Commissioner Henderson offered motion, seconded by Commissioner Wilson, that the Board of
Commissioners adopt a Municipal Order entitled, “A MUNICIPAL ORDER ADOPTING THE
FY2021-2022 JOB GRADE SCHEDULE FOR THE EMPLOYEES OF THE CITY OF
PADUCAH, KENTUCKY”
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5). (MO #2466; BK 12)
RESOLUTION
DECLARING INTENT OF REIMBURSEMENT FOR CAPITAL EXPENDITURES
FROM THE PROCEEDS OF TAX-EXEMPT OBLIGATIONS
Commissioner Wilson offered motion, seconded by Commissioner Henderson, that the
Board of Commissioners adopt a Resolution entitled, “A RESOLUTION OF THE BOARD
OF COMMISSIONERS OF THE CITY OF PADUCAH, KENTUCKY DECLARING THE
CITY ’S INTENT TO REIMBURSE ITSELF FOR THE COST OF CAPITAL
EXPENDITURES FROM THE PROCEEDS OF TAX-EXEMPT OBLIGATIONS.”
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5). (MO BK 12)
MUNICIPAL ORDERS
PAYMENT TO CLEAN EARTH, INC. IN THE AMOUNT OF $46,795.70 FOR THE
2021 CLEAN-UP DAY
Commissioner Gault offered motion, seconded by Commissioner Guess, that the Board of
Commissioners adopt a Municipal Ordered entitled, “A MUNICIPAL ORDER
AUTHORIZING THE FINANCE DIRECTOR TO PAY CLEAN EARTH, INC., IN AN
AMOUNT OF $46,795.70 FOR THE DISPOSAL OF HOUSEHOLD HAZARDOUS
WASTE AND ELECTRONIC WASTE COLLECTED DURING THE CITY/COUNTY
2021 CLEAN-UP DAY.”
June 22, 2021
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5). (MO #2469; BK 12)
AUTHORIZE CITY MANAGER TO ENACT TEMPORARY DOWNTOWN STREET
CLOSURES
Commissioner Guess offered Motion, seconded by Commissioner Gault, that the Board of
Commissioners adopt a Municipal Order entitled, “A MUNICIPAL ORDER OF THE CITY OF
PADUCAH, KENTUCKY, AUTHORIZING THE CITY MANAGER TO ENACT CERTAIN
TEMPORARY STREET CLOSURES AND PARKING SPACE VACATIONS IN THE
DOWNTOWN AREA FOR THE PURPOSES OF ASSISTING LOCAL BUSINESSES TO
EXPAND THEIR OUTSIDE DINING AREA FOOTPRINT.”
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5). (MO #2470; BK 12)
ORDINANCE ADOPTION
SECOND AMENDMENT – LEASE AGREEMENT – CREMATION SOCIETY OF
PADUCAH, LLC
Commissioner Henderson offered Motion, seconded by Commissioner Wilson, that the Board of
Commissioners adopt an Ordinance entitled, AN ORDINANCE AUTHORIZING THE MAYOR
TO EXECUTE A SECOND AMENDMENT TO LEASE AGREEMENT WITH CREMATION
SOCIETY OF PADUCAH, LLC.” This Ordinance is summarized as follows: This ordinance
approves the Second Amendment to Lease Agreement between the City of Paducah, Kentucky and
Cremation Society of Paducah, LLC to allow the Cremation Society of Paducah, LLC to operate as
a crematory, visitation and ceremonial funeral service establishment, and cremation garden.
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5). (ORD 2021-06-8690; BK 36)
FY21 BUDGET AMENDMENT IN THE AMOUNT OF $2.9 MILLION – MATCH
FUNDS - US AMY CORPS OF ENGINEERS FLOODWALL PROJECT
Commissioner Wilson offered motion, seconded by Commissioner Henderson, that the Board of
Commissioners adopt an Ordinance entitled, “AN ORDINANCE AMENDING ORDINANCE NO.
2020-6-8641, ENTITLED, “AN ORDINANCE ADOPTING THE CITY OF PADUCAH,
KENTUCKY, ANNUAL OPERATING BUDGET FOR THE FISCAL YEAR JULY 1, 2020,
THROUGH JUNE 30, 2021, BY ESTIMATING REVENUES AND RESOURCES AND
APPROPRIATING FUNDS FOR THE OPERATION OF CITY GOVERNMENT.” This Ordinance
is summarized as follows: That the annual budget for the fiscal year beginning July 1, 2020, and
ending June 30, 2021, as adopted by Ordinance No. 2020-6-8641, be amended by the following re-
appropriations: Transfer $2,900,000 from the FY2021 General Fund Reserve to the Floodwall Cash
Match (FW0016) Project Account.
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5). (ORD 2021-06-8691; BK 36)
June 22, 2021
APPROVE FY 2022 BUDGET
Commissioner Henderson offered Motion, seconded by Commissioner Wilson, that the Board of
Commissioners adopt an Ordinance entitled, “AN ORDINANCE ADOPTING THE CITY OF
PADUCAH, KENTUCKY, ANNUAL OPERATING BUDGET FOR THE FISCAL YEAR JULY 1,
2021, THROUGH JUNE 30, 2022, BY ESTIMATING REVENUES AND RESOURCES AND
APPROPRIATING FUNDS FOR THE OPERATION OF CITY GOVERNMENT.” This Ordinance
is summarized as follows: Adopting the City of Paducah annual budget for Fiscal Year July 1,
2021, through June 30, 2022, by estimating revenues and resources and appropriating funds for the
operation of City Government at $72,124,075, and summarized by fund as follows:
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5). (ORD 2021-06-8692; BK 36)
June 22, 2021
DISCUSSION
Communications Manager Pam Spencer provided the following summary:
Remote Workers Incentive Program
One of the Paducah Board of Commissioners’ priority action items is the development of a
remote workers incentive program. Business Development Specialist Kathryn Byers provided
an overview of a proposed program with a goal of attracting to Paducah approximately 40
full-time remote workers from 100 miles or more outside Paducah by offering the following
incentives:
Relocation expenses
Internet access
Community connections through tickets to cultural amenities, memberships to professional
networks, a membership at Sprocket, and classes at local higher education institutes
City of Paducah payroll tax waiver for a 12-month period
The City has allocated $100,000 for the incentives and marketing with the goal to reach
workers in the following cities: Atlanta, Georgia; Austin, Texas; Charlotte, North Carolina;
Chicago, Illinois; Houston, Texas; and Louisville, Kentucky. The plan is to present a final
draft of the proposed incentives in July and implement the program in August.
Plan to Repurpose Robert Cherry Civic Center
The Paducah Board of Commissioners discussed the future of the Robert Cherry Civic
Center located at 2701 Park Avenue. Due to the COVID-19 pandemic, the City closed the
facility more than a year ago. Since that time, Mayor Bray says the City has been looking at
repurposing the Civic Center since the facility operates at an annual loss of more than
$35,000. On a related note, the Parks and Recreation Department and the Senior Center are
in a building on H.C. Mathis Drive that is expensive to maintain with utility costs around
$100,000 per year. As a solution, the City is looking at renovating the Civic Center to
provide office space for the Parks Department and a banquet hall for the public. Mayor Bray
emphasized that this is a decision of economics. The next step is to receive a cost estimate
for proposed Civic Center renovations. The Senior Center is also reviewing other buildings
that would be more economical for its operations.
COMMENTS
Assistant City Manager, Michelle Smolen
Noble Park Pool is now open, and will be open through August 8, 2021. Session 1 will be from
Noon to 2:00 p.m. and Session 2 will be from 3:00 to 5:00 p.m.
June 22, 2021
Entertainment Destination Center – Commissioners Henderson and Wilson both inquired about
the status of the EDC. Katie Axt reports that there is a delay in the shipment of cups due to supply
shortages. But the restaurants that have signed up to participate are ready to go when the cups do
come in.
EXECUTIVE SESSION
Commissioner Gault offered motion, seconded by Commissioner Guess that the Board of
Commissioners go into closed session for discussion of matters pertaining to the following topic:
Issues which might lead to the appointment, dismissal or disciplining of an employee, as
permitted by KRS 61.810(1)(f)
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5).
RECONVENE IN OPEN SESSION
Commissioner Gault offered motion, seconded by Commissioner Guess, that the Paducah Board of
Commissioners reconvene in open session.
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5)
ADJOURN
Commissioner Henderson offered motion, seconded by Commissioner Wilson, to adjourn the
meeting of the Paducah Board of Commissioners.
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5)
TIME ADJOURNED: 6:52 p.m.
ADOPTED: July 13, 2021
______________________________
George Bray, Mayor
ATTEST:
________________________________
Lindsay Parish, City Clerk
June 24, 2021
At a Joint Called Meeting of the Paducah Board of Commissioners and McCracken County Fiscal
Court, held on Thursday, June 24, 2021, at 5:00 p.m., in the Cumberland Room at the Convention
Center located at 415 Park Street, Paducah, Kentucky, Mayor Bray and Judge Executive Clymer
presided.
Upon call of the roll by the County Clerk, the following answered to their names: County
Commissioners Bartleman, Jones, Parker and Judge Executive Clymer (4). Upon call of the roll by
the City Clerk, the following answered to their names: Commissioners Gault, Guess, Henderson,
Wilson and Mayor Bray (5).
DISCUSSION
E911 & SPORTS COMPLEX
After a discussion regarding E911 & the Sports Complex, County Commissioner Eddie Jones offered
motion, seconded by County Commissioner Jeff Parker that “The County Judge and Mayor will draw
a Memorandum of Opinion setting forth our joint intent to agree on a 50/50 partnership in establishing
a 911 system and sports park in Paducah-McCracken County.”
Adopted by the Fiscal Court unanimously.
Commissioner Wilson offered motion, seconded by Commissioner Henderson that “The County
Judge and Mayor will draw a Memorandum of Opinion setting forth our joint intent to agree on a
50/50 partnership in establishing a 911 system and sports park in Paducah-McCracken County.”
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5).
ADJOURN
County Commissioner Parker offered motion, seconded by County Commissioner Jones to adjourn
the meeting of the Fiscal Court. All voted Aye.
Commissioner Gault offered motion, seconded by Commissioner Guess, to adjourn the meeting of
the Paducah Board of Commissioners. Adopted on call of the roll yeas, Commissioners Gault,
Guess, Henderson, Wilson and Mayor Bray (5)
Meeting ended at approximately 5:45 p.m.
ADOPTED: July 13, 2021.
______________________________
George Bray, Mayor
June 24, 2021
ATTEST:
________________________________
Lindsay Parish, City Clerk
June 25, 2021
At a Called Meeting of the Paducah Board of Commissioners held on Thursday, June 25, 2021, at
9:00 a.m., in the Commission Chambers of City Hall located at 300 South Fifth Street, Paducah,
Kentucky. Mayor Bray presided. Upon call of the roll by the City Clerk, the following answered to
their names: Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray (5).
EXECUTIVE SESSION
Commissioner Gault offered motion, seconded by Commissioner Guess, that the Board of
Commissioners go into closed session for discussion of matters pertaining to the following topic:
Issues which might lead to the appointment, dismissal or disciplining of an employee, as
permitted by KRS 61.810(1)(f)
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5)
RECONVENE IN OPEN SESSION
Commissioner Henderson offered motion, seconded by Commissioner Wilson, that the Paducah
Board of Commissioners reconvene in open session.
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5)
ADJOURN
Commissioner Gault offered motion, seconded by Commissioner Guess, to adjourn the meeting of
the Paducah Board of Commissioners.
Adopted on call of the roll yeas, Commissioners Gault, Guess, Henderson, Wilson and Mayor Bray
(5)
Meeting ended at approximately 1:20 p.m.
ADOPTED: July 13, 2021
______________________________
George Bray, Mayor
ATTEST:
________________________________
Lindsay Parish, City Clerk
July 13, 2021
RECEIVE AND FILE DOCUMENTS:
Minute File:
1. Notice of Called Meeting of the Board of Commissioners - June 17, 2021
2. Notice of Called Meeting of the Board of Commissioners - June 18, 2021
3. Notice of Called Joint meeting of the Board of Commissioners and the McCracken
County Fiscal Court – June 24, 2021
4. Notice of Called Meeting of the Board of Commissioners – June 25, 2021
5. Letter from Paducah Power System dated June 17, 2021 – with enclosure regarding
July 2021 Paducah Power System Electric Rates
Deed File:
1. Deed of Conveyance – Computer Services, Inc. to City of Paducah – MO #2409
2. Commissioner’s Deed – 1024 South 5th Street
Contract File:
1. Contract with Peck Flannery Gream Warren Inc. (PFGW), for Robert Cherry Civic
Center Feasibility Study from PFGW Architects dated July 1, 2021 (CM Signed)
2. Contract For Services – between Paducah Parks and Recreation and Atlas Cube –
portable restrooms and hand washing stations with Certificate of Liability Insurance
(CM Signed)
3. June 23, 2021 – Letter of Commitment for City Block Facilities – Weyland Ventures –
ORD 2020-08-8650
4. Entertainment Destination Center Agreement with Big Blue Bar2, Inc. –
ORD 2021-04-8685
5. Second Amendment to Lease Agreement between the City of Paducah and Cremation
Society of Paducah, LLC – ORD 2021-06-8690
6. Contract Between The Kentucky Department For Libraries and Archives and Paducah
Police Department – MO #2437
Financials File:
1. Paducah Water Works – Month ended May 31, 2021
2. Transit Authority of the City of Paducah – Financial Statement – year ended 6/30/202
Bids File:
1. Bids for PPD Scanning Project (MO #2437)
a. DRMS * (Chosen Bid)
b. US Imaging, Inc.
c. Doc Scan
d. Info+
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Approve Contract with Dallmann Systems, Inc. to provide a Security Camera Network and Video
Management System to be used by Barkley Regional Airport for $70,114.71 (Grant Funded) - T WILSON
Category: Municipal Order
Staff Work By: Ty Wilson
Presentation By: Ty Wilson
Background Information: This project is funded by a grant through the Kentucky Office of Homeland
Security and the U.S. Department of Homeland Security. Municipal Order 2239 allowed the City to apply for
this grant on behalf of Barkley Regional Airport. This grant was applied for to replace the out-of-date security
camera system that is currently in use. This grant was accepted by Municipal Order 2328. Per procurement
guidelines, the City of Paducah entered a competitive process for the purchase and installment for the security
camera network and video management system. The bid opening was held in the Commission Chambers in
City Hall on May 12, 2021. Five bids were received. The bid from Dallmann Systems, Inc. was deemed the
lowest responsive bid. The amount bid was $70,114.71.
The contract lines out the agreement between the City of Paducah and Dallmann Systems, Inc. It is understood that
all equipment used for the project will become property of Barkley Regional Airport upon completion. All attached
documents are a part of the contract.
Does this Agenda Action Item align with a Commission Priority? No
If yes, please list the Commission Priority:
Communications Plan: There are no communication plans at this time.
Funds Available:Account Name:
Account Number:
Staff Recommendation: Authorize the Mayor to execute Contract documents.
Attachments:
1.MO - purchase of Security Camera Network – Barkley Airport – July 2021
2.Full Dallmann Systems Bid Proposal
3.Contract for Barkley Airport Project_Update 2
MUNICIPAL ORDER NO. ________
A MUNICIPAL ORDER AUTHORIZING THE PURCHASE OF A
SECURITY CAMERA NETWORK AND VIDEO MANAGEMENT SYSTEM
FOR USE BY BARKLEY REGIONAL AIRPORT FROM DALLMANN
SYSTEMS, INC., IN THE AMOUNT OF $70,114.71 AND AUTHORIZING
THE MAYOR TO EXECUTE ALL DOCUMENTS RELATED TO SAME
WHEREAS, Municipal Order 2239 and Municipal Order 2328 allowed the
City to apply for and accept a grant through the Kentucky Office of Homeland Security and
the U.S. Department of Homeland Security to replace the out-of-date security camera system
that is currently in use at Barkley Regional Airport; and
WHEREAS, a bid opening was held in the Commissioner Chambers of City
Hall on May 12, 2021 for the security camera network and video management system; and
WHEREAS, the bid from Dallmann Systems, Inc., in the amount of
$70,114.71, was deemed the lowest responsive bid; and
WHEREAS, the City of Paducah now wishes to enter into an agreement with
Dallmann Systems, Inc.
BE IT ORDERED BY THE CITY OF PADUCAH, KENTUCKY:
SECTION 1. That the Mayor is hereby authorized to execute a contract with
Dallmann Systems, Inc., for purchase and installation of a Security Camera Network and
Video Management System to be used by Barkley Regional Airport in the amount of
$70,114.71, according to the specifications, bid proposal and all contract documents
heretofore approved and incorporated in the bid.
SECTION 2. This expenditure shall be funded by a grant through the
Kentucky Office of Homeland Security and the U.S. Department of Homeland Security
SECTION 3. This Order will be in full force and effect from and after the
date of its adoption.
______________________________
Mayor
ATTEST:
_____________________________
Lindsay Parish, City Clerk
Adopted by the Board of Commissioners, July 13, 2021
Recorded by Lindsay Parish, City Clerk, July 13, 2021
MO\purchase of Security Camera Network – Barkley Airport – July 2021
PROPOSAL
Barkley Reginal Airport Security System Upgrade
Barkley Reginal Airport
2901 Fisher Rd
Paducah, Kentucky 40286
Presented By:
Dallmann Systems, Inc.
Revision:
5/24/2021
0
www.dallmannsystems.com
1247 Bridgeport Drive
Jeffersonville, Indiana 47130 United States
812-283-7255
www.dallmannsystems.com
Modified:
Surveillance System
ARXYS VXV2-R12E-144
VideoX V2 R12E 144TB Enterprise NVR Server - 200Cameras w/ VMD (12 Bay 2U
Rack - 112TB R6 Usable)( Windows Server 2019)
1
Avigilon 12.0W-H5A-FE-DO1-IR
12MP H5A Fisheye IR Dome Camera
12
Avigilon 8.0C-H5A-BO1-IR
8MP H5A Bullet Camera with 4.9-8mm Lens
14
Avigilon 8.0C-H5A-D1-IR
8MP H5A Indoor IR Dome Camera with 4.9-8mm Lens
5
Avigilon ACC7-ENT
ACC 7 Enterprise camera channel
31
Avigilon H4-BO-JBOX1
Bullet Junction Box for H5A / H4A Bullet Cameras
12
Avigilon RM5-WKS-4MN-NA
Remote Monitoring Workstation; 4 monitors; NA
2
Cisco WS-C2960XR-48FPD-I
Catalyst 2960 Xr Gige PoE Networking Switch with Dual Power Supply
1
Comcables CN-C6A-GN-C
RJ45 Performance Jack, CAT6A, Green
31
Comcables FP-1BK
Faceplate, 1 Port, Black
12
Comcables N-11111-1M-GN-C
CAT 6 Patch Cable 1M
31
Cyberview RKP117
U 17" Rack Mount Monitor Keyboard Drawer with Samsung TFT LCD
1
Middle Atlantic R412-3824B
38SP 4-POST FRM RK 12/24
1
Minuteman UPS PRO2000RT2U
(6) 5-15R / (1) L5-20R
1
Rev.0
Barkley Reginal Airport Security System Upgrade
Project No : DALLM-0045 5/24/2021
Page 2 of 4
* Price Includes Accessories
Platinum Tools 106178J
RJ45 Connector (8P8C) CAT6 High Performance Round Solid 3 Prong, 100/Jar
1
RACO 8660
4 in. x 2 in. Drawn Handy Electrical Box, Raised Ground
12
RATEL Wireless Keyboard Mouse Combo
Wireless Keyboard Mouse Combo
2
Samsung UN50TU7000FXZA
50" Class 7 Series LED 4K UHD Monitor
1
Sanus VLL5-B1
Wall Mount For Flat Panel Display
1
Vigitron Vi2001
Single-port MaxiiGuard ethernet surge protector
12
W Box Technologies 0E-C6PP48
Cat 6 Patch Panel 48 Port
1
Windy City Wire 5566060
Cable, Cat6, 23-4P, CMP, Green, 1000 Feet Installed J-Hook
5
Project Subtotal:$61,767.32
Rev.0
Barkley Reginal Airport Security System Upgrade
Project No : DALLM-0045 5/24/2021
Page 3 of 4
* Price Includes Accessories
PROJECT SUMMARY
$61,767.32Equipment:
$8,347.39Labor:
Grand Total: $70,114.71
Date
Ty Wilson Date
Dallmann Systems, Inc.
Client:
Contractor:
Rev.0
Barkley Reginal Airport Security System Upgrade
Project No : DALLM-0045 5/24/2021
Page 4 of 4
* Price Includes Accessories
2901 Fisher Rd
Paducah, Kentucky 40286
Barkley Reginal Airport Security System Upgrade
Barkley Reginal Airport
CONTRACT
Revision:
5/24/2021
0
Modified:
Presented By:
Dallmann Systems, Inc.
1247 Bridgeport Drive
Jeffersonville, Indiana 47130 United States
812-283-7255
www.dallmannsystems.com
A.The general project description is contained in the attached document and related documents from herein referred to as the
“Proposal”.
B.The specific work to be performed by Contractor is the installation of the specified system as outlined in the Proposal.
C.The total amount to be paid by the owner for the performance (subject to additions and deductions by written change order)
shall not exceed the total specified in the Proposal.
D.Progress payments will be made according to the payment schedule. Equipment will not be ordered until the equipment
deposit has been submitted. These times are subject to the timing of the construction and the lead times required for the
ordered equipment to be delivered.
E.Payment is due immediately after invoicing. Unpaid balance beyond 30 days after invoicing of completed tasks as outlined in
item D shall bear interest payable to Contractor at a rate of 1.5% per month simple interest.
F.This Proposal expires 30 days following the date stated on the top of this agreement. No work will be scheduled without a
deposit plus a signed copy of this agreement. All drawings and specifications contingent on agreement and retainer.
G.If job is of a retro-fit/remodel nature on an existing structure, and scope of work exceeds time estimated to complete because
of unforeseen circumstances, owner agrees that he/she will be back-charged at a rate of $65 per man, per hour for all extra
labor involved in completing the job.
H.Contractor reserves the right to replace proposed models in the case of obsolescence, discontinuation or unavailability with a
comparable model of equal or greater value upon customer approval. Contractor will not be held responsible or liable in any
way for any said product's obsolescence, discontinuation or unavailability.
Payment Schedule Amount Due Date
Payment Due on Completion of Project $70,114.71
Rev.0
Barkley Reginal Airport Security System Upgrade
Project No : DALLM-0045 5/24/2021
Page 1 of 2
This proposal is valid for 30 days.
Invoicing:
• Dallmann Systems, Inc will submit a mobilization invoice upon contract award for 25% of the total contract amount.
Mobilization includes (but is not limited to) all preparatory work necessary for the coordination and organization of
personnel, procurement of materials, equipment, supplies, and incidentals required to begin the project; for the
establishment of all necessary storage and facilities to facilitate the work; for premiums on bond and insurance (as
applicable); and for all procedures/actions performed or costs incurred before the beginning of work.
• Customer expressly allows Dallmann Systems, Inc to invoice for stored materials. Dallmann Systems, Inc will store
materials at the customer location or in the Dallmann Systems, Inc bonded and insured warehouse and provide backup
documentation with inventories by part number, pictures, etc., as requested by the Customer.
• Customer expressly allows Dallmann Systems, Inc to submit progressive invoices based upon completed work
percentage or other production milestone, unless otherwise written on contract as different payment terms.
All Invoices due in receipt
Dallmann Systems, Inc may elect to preserve our right to perfect a bond or lien by sending notices in accordance with
statutory requirements.
Any change to the scope of work or materials described in this proposal involving extra cost will only be effective upon the
execution of a written change order by involved parties.
Pricing is conditional upon unrestricted access to all applicable areas where work is to be performed or access to and from
areas where work is to be performed. Unless otherwise noted, the scope of work shown in this proposal is to be performed
without delays. Additional trip charges may apply if delays caused by reasons outside of Dallmann Systems, Inc’s control.
Dallmann Systems, Inc will guarantee all material and workmanship for a period of one year from the completion of the
work included in this proposal. The warranty will commence upon final project acceptance and will terminate the 365th day
beyond the date of final acceptance, regardless of warranty work conducted during the warranty period. The Owner is
responsible for troubleshooting and identifying faults covered under this warranty. Additional fees may apply if Dallmann
Systems, Inc must troubleshoot issues for the Owner and/or if, during the course acting on a warranty request, Dallmann
Systems, Inc determines that the issue was not generated by failures in material or workmanship. Except for the foregoing
warranty, Dallmann Systems, Inc specifically disclaims all other warranties, express or implied, including but not limited to
the warranties of merchantability and of fitness for a particular purpose.
Dallmann Systems, Inc shall not be liable for any special, consequential, incidental or exemplary damages or loss. Dallmann
Systems, Inc will not be responsible for equipment or parts which are in disrepair due to misuse, accident or mishandled by
others not authorized to service this equipment during our agreement time. Dallmann Systems, Inc will not be responsible
for damages caused by fire, the elements, civil commotion, and malicious mischief, negligence of the customer, its agents or
acts of God.
This proposal is the property of Dallmann Systems, Inc. It is not for publication and is issued expressly on the condition that
it is not to be copied, reprinted, or reproduced in any manner; nor is it to be disclosed to any third party, either wholly or in
part without the express written consent of Dallmann Systems, Inc.
Date:
Date:
Client: Ty Wilson
Contractor:Dallmann Systems, Inc.
Rev.0
Barkley Reginal Airport Security System Upgrade
Project No : DALLM-0045 5/24/2021
Page 2 of 2
4.2 UNIT PRICE FORM
Provide installed price for each of the following elements of the project:
Description Price (each)
Exterior Fixed Camera, Mount and License
Interior Fixed Camera, Mount and License
Interior 360-Degree Fisheye Camera, Mount and
License
100’ CAT-6 Plenum Rated Ethernet Cable Tested and
Terminated
Uninterruptible Power Supply
Small Form Factor PC, Wireless Keyboard and
Wireless Mouse
Rack Mount KVM
49” Digital Display and Wall Mount Bracket
$553.33
$1,071.00
$195.00
$1,630.00
$1,227.00
$1,336.00
$973.75
$767.50
AGREEMENT FOR THE PURCHASE AND INSTALLATION OF
A SECURITY CAMERA NETWORK AND VIDEO MANAGEMENT SYSTEM
FOR THE BARKLEY REGIONAL AIRPORT
THIS AGREEMENT, made this day of , 2021 by and between the CITY OF
PADUCAH, hereinafter called the CITY, and DALLMANN SYSTEMS, INC. hereinafter called the
VENDOR, for the consideration hereinafter named, agree as follows:
ARTICLE 1. SCOPE OF WORK
The Vendor shall provide a Security Camera Network and Video Management System to be
used by Barkley Regional Airport in full compliance with the Bid Proposal Dated May 12, 2021 and with
this Agreement, the Specifications, Terms and Conditions, and Addendum(s) issued, attached hereto as
“Exhibit A.”
ARTICLE 2. OWNERSHIP OF THE AIRPORT
Although the City applied for a Kentucky Office of Homeland Security Grant to fund the purchase
on behalf of the Barkley Regional Airport, a City partner and economic driver for the community, all
equipment, licensing, and software provided by the Vendor to Barkley Regional Airport as a result of this
project shall become the property of the airport upon completion.
ARTICLE 3. TIME FOR COMPLETION AND LIQUIDATED DAMAGES
The Vendor hereby agrees to commence work under this Contract and to fully complete the
delivery of the Security Camera Network and Video Management System within 60 consecutive
calendar days thereafter from the date of this Agreement.
ARTICLE 4. THE CONTRACT SUM
The City agrees to pay the Vendor the following, subject to additions and deductions provided
therein: Seventy thousand one hundred fourteen dollars and seventy-one cents ($70,114.71) as
quoted in the aforementioned Vendor’s Bid Proposal (Exhibit A) and as approved by the Board of
Commissioners on ___________ by Municipal Order #____________.
ARTICLE 5. PAYMENTS
The City will make Payment in accordance with Exhibit A. The Payment shall constitute full
compensation for the work and services authorized herein.
ARTICLE 6. GOVERNING LAW
The Parties agree that this Agreement and any legal actions concerning its validity, interpretation
and performance shall be governed by the laws of the Commonwealth of Kentucky. The parties further
agree that the venue for any legal proceeding relating to this Agreement shall exclusively be in
McCracken County, Kentucky.
ARTICLE 7. THE CONTRACT DOCUMENTS
The Specifications, terms and conditions, and any addendum that may have been issued are fully
a part of this Contract as if thereto attached or herein repeated.
IN WITNESS WHEREOF: The parties hereto have executed this Agreement, the day and year first
above written.
VENDOR CITY OF PADUCAH, KENTUCKY
BY __________________________ BY ____________________________
TITLE ________________________ George Bray, Mayor
ADDRESS: ADDRESS:
Post Office Box 2267
Paducah, Kentucky 42002-2267
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Authorize Application for a FY 2021 Edward Byrne Memorial Justice Assistance Grant (JAG) in
the amount of $12,325.00 - B LAIRD
Category: Municipal Order
Staff Work By: Ty Wilson, Joseph Hayes
Presentation By: Brian Laird
Background Information: The Edward Byrne Memorial Justice Assistance Grant (JAG) is a federal
formula grant funded through the U.S. Department of Justice. The city has received a notice of eligibility for
the amount of $12,325.
The Paducah Police Department proposes to purchase a radar trailer message board. The speed trailer message
board collects speed data for problematic areas. It also provides a visual educational opportunity for motorists
who may be operating a motor vehicle at a high rate of speed or in a dangerous area. The electronic message
board will display their speed and if they are over the speed limit will display "Slow Down". Blue and red LED
lights will also flash if they are over the speed limit. This piece of equipment will be utilized to help reduce the
number of speed related crashes, as well as to determine where and when traffic enforcement should be
conducted.
There is no match requirement for this grant. The estimated cost of this equipment is $12,245.
Does this Agenda Action Item align with a Commission Priority? No
If yes, please list the Commission Priority:
Communications Plan: There are no communication plans at this time.
Funds Available:Account Name:
Account Number:
Staff Recommendation: Authorize and direct the Mayor to execute all required grant application
documents.
Attachments:
1.MO - app – 2021 Justice Assistance Edward Byrne JAG
MUNICIPAL ORDER NO. ______
A MUNICIPAL ORDER APPROVING THE EXECUTION OF A GRANT
APPLICATION TO OBTAIN A 2021 EDWARD BYRNE MEMORIAL JUSTICE
ACCOUNTABILITY GRANT, THROUGH THE U.S. DEPARTMENT OF JUSTICE, IN THE
AMOUNT OF $12,325, TO BE USED BY THE PADUCAH POLICE DEPARTMENT FOR
THE PURCHASE OF A RADAR TRAILER MESSAGE BOARD
BE IT ORDERED BY THE BOARD OF COMMISSIONERS OF THE CITY OF
PADUCAH, KENTUCKY:
SECTION 1. The City of Paducah hereby approves the execution of a grant
application to obtain a 2021 Edward Byrne Memorial Justice Accountability Grant, through the
U.S. Department of Justice, in the amount of $12,325, to be used by the Paducah Police
Department toward the purchase of a radar trailer message board, to be utilized to help reduce
the number of speed related crashes and to determine where and when traffic enforcement should
be conducted. This grant does not require a local cash match.
SECTION 2. This order shall be in full force and effect from and after the date of
its adoption.
_________________________________
George Bray, Mayor
ATTEST:
_______________________________
Lindsay Parish, City Clerk
Adopted by the Board of Commissioners, July 13, 2021
Recorded by Lindsay Parish, City Clerk, July 13, 2021
\mo\grants\app – 2021 Justice Assistance Edward Byrne JAG
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Fleet Maintenance Service Agreement between City of Paducah Fleet Department and Paducah
McCracken County Joint Sewer Agency - C YARBER
Category: Municipal Order
Staff Work By: Debbie Collins, Jim Scutt
Presentation By: Chris Yarber
Background Information: May 10, 2021, a Fleet Maintenance Service Agreement was entered into for City
of Paducah Fleet Department to provide all professional labor, materials, equipment and operations necessary
for scheduled maintenance, upkeep, repair and preventive maintenance, pursuant to the fee schedule for
Paducah McCracken County Joint Sewer Agency.
Does this Agenda Action Item align with a Commission Priority? No
If yes, please list the Commission Priority:
Communications Plan:
Funds Available:Account Name:
Account Number:
Staff Recommendation: Approve a Municipal Order for the Fleet Maintenance Service Agreement for City
of Paducah Fleet Department to provide all professional labor, materials, equipment and operations necessary
for scheduled maintenance, upkeep, repair and preventive maintenance, pursuant to the fee schedule for
Paducah McCracken County Joint Sewer Agency.
Attachments:
1.MO - agree-fleet maintenance services - Paducah-McCracken County JSA
2.JSA - Service Agreement for Fleet Maintenance with labor rates
MUNICIPAL ORDER NO. _____________
A MUNICIPAL ORDER APPROVING A FLEET MAINTENANCE,
MOTORIZED EQUIPMENT, AND EMERGENCY APPARATUS SERVICE
AGREEMENT WITH PADUCAH-McCRACKEN COUNTY JOINT SEWER
AGENCY TO PROVIDE FLEET MAINTENANCE SERVICES AT HOURLY RATES
WHEREAS, The City of Paducah wishes to enter into a Fleet Maintenance
Service Agreement with the Paducah-McCracken County Joint Sewer Agency, for the City of
Paducah Fleet Department to provide fleet services at hourly rates.
NOW, THEREFORE, BE IT ORDERED BY THE CITY OF PADUCAH,
KENTUCKY:
SECTION 1. That the Board of Commissioners hereby approves the City of
Paducah Fleet Maintenance, Motorized Equipment and Emergency Apparatus Service
Agreement (hereinafter the “Agreement”) with the Paducah-McCracken County Joint Sewer
Agency in substantially the form attached hereto and made part hereof (Exhibit A) and ratifies
the Mayor’s signature.
SECTION 2. That the hourly labor rates are as follows:
Shop Hourly Labor Rate
Heavy Truck $95 per hour
Heavy Equipment $95 per hour
Passenger Vehicle $85 per hour
Light Truck $85 per hour
Small Engine $75 per hour
SECTION 3. That the initial term of the Agreement shall be for a period of one
(1) year. Such term shall automatically renew at the end of the Initial Term and any subsequent
terms thereafter for an additional one (1) year unless either party terminates the Agreement upon
60 day’s written notice in accordance with Paragraph 7 of the Agreement. In addition, the City
of Paducah may terminate the Agreement with cause upon thirty days’ written notice for non-
payment of fees.
SECTION 4. This Order shall be in full force and effect from and after the date
of its adoption.
______________________________________
George Bray, Mayor
ATTEST:
__________________________
Lindsay Parish, City Clerk
Introduced by the Board of Commissioners, July 13, 2021
Adopted by the Board of Commissioners, July 13, 2021
mo/agree-fleet maintenance services – Paducah McCracken County JSA
EXHIBIT A
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Fleet Maintenance Service Agreement between City of Paducah Fleet Department and Kevil City
Fire Department - C YARBER
Category: Municipal Order
Staff Work By: Debbie Collins, Jim Scutt
Presentation By: Chris Yarber
Background Information: June 25, 2021, a Fleet Maintenance Service Agreement was entered into for City
of Paducah Fleet Department to provide all professional labor, materials, equipment and operations necessary
for scheduled maintenance, upkeep, repair and preventive maintenance, pursuant to the fee schedule for Kevil
City Fire Department.
Does this Agenda Action Item align with a Commission Priority? No
If yes, please list the Commission Priority:
Communications Plan:
Funds Available:Account Name:
Account Number:
Staff Recommendation: Approve a Municipal Order for the Fleet Maintenance Service Agreement for City
of Paducah Fleet Department to provide all professional labor, materials, equipment and operations necessary
for scheduled maintenance, upkeep, repair and preventive maintenance, pursuant to the fee schedule for Kevil
City Fire Department.
Attachments:
1.MO - agree-fleet maintenance services - Kevil City Fire Department
2.Kevil City Service Agreement
1
MUNICIPAL ORDER NO. _____________
A MUNICIPAL ORDER APPROVING A FLEET MAINTENANCE,
MOTORIZED EQUIPMENT AND EMERGENCY APPARATUS SERVICE
AGREEMENT WITH KEVIL CITY FIRE DEPARTMENT TO PROVIDE FLEET
MAINTENANCE SERVICES AT HOURLY RATES AND AUTHORIZING THE
MAYOR TO EXECUTE SAME
WHEREAS, the City of Paducah wishes to enter into a Fleet Maintenance Service
Agreement with the Kevil City Fire Department for the City of Paducah Fleet Department to
provide fleet services at hourly rates.
NOW, THEREFORE, BE IT ORDERED BY THE CITY OF PADUCAH,
KENTUCKY:
SECTION 1. That the Board of Commissioners hereby authorizes the Mayor to
execute the City of Paducah Fleet Maintenance, Motorized Equipment and Emergency
Apparatus Service Agreement (hereinafter the “Agreement”) with the Kevil City Fire
Department in substantially the form attached hereto and made part hereof (Exhibit A).
SECTION 2. That the hourly labor rates are as follows:
Shop Hourly Labor Rate
Heavy Truck $95 per hour
Heavy Equipment $95 per hour
Passenger Vehicle $85 per hour
Light Truck $85 per hour
Small Engine $75 per hour
SECTION 3. That the initial term of the Agreement shall be for a period of one
(1) year. Such term shall automatically renew at the end of the Initial Term and any subsequent
terms thereafter for an additional one (1) year unless either party terminates the Agreement upon
60 day’s written notice in accordance with Paragraph 7 of the Agreement. In addition, the City
of Paducah may terminate the Agreement with cause upon thirty days’ written notice for non-
payment of fees.
SECTION 4. This Order shall be in full force and effect from and after the date
of its adoption.
2
______________________________________
George Bray, Mayor
ATTEST:
__________________________
Lindsay Parish, City Clerk
Introduced by the Board of Commissioners, July 13, 2021
Adopted by the Board of Commissioners, July 13, 2021
mo/agree-fleet maintenance services – Kevil Rural Fire Department
3
EXHIBIT A
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Fleet Maintenance Service Agreement between City of Paducah Fleet Department and Kevil
Rural Fire Department - C YARBER
Category: Municipal Order
Staff Work By: Debbie Collins, Jim Scutt
Presentation By: Chris Yarber
Background Information: June 28, 2021, a Fleet Maintenance Service Agreement was entered into for City
of Paducah Fleet Department to provide all professional labor, materials, equipment and operations necessary
for scheduled maintenance, upkeep, repair and preventive maintenance, pursuant to the fee schedule for Kevil
Rural Fire Department.
Does this Agenda Action Item align with a Commission Priority? No
If yes, please list the Commission Priority:
Communications Plan:
Funds Available:Account Name:
Account Number:
Staff Recommendation: Approve a Municipal Order for the Fleet Maintenance Service Agreement for City
of Paducah Fleet Department to provide all professional labor, materials, equipment and operations necessary
for scheduled maintenance, upkeep, repair and preventive maintenance, pursuant to the fee schedule for Kevil
Rural Fire Department.
Attachments:
1.MO - agree-fleet maintenance services - Kevil Rural Fire Department
2.Kevil Rural Service Agreement
MUNICIPAL ORDER NO. _____________
A MUNICIPAL ORDER APPROVING A FLEET MAINTENANCE,
MOTORIZED EQUIPMENT AND EMERGENCY APPARATUS SERVICE
AGREEMENT WITH KEVIL RURAL FIRE DEPARTMENT TO PROVIDE FLEET
MAINTENANCE SERVICES AT HOURLY RATES AND AUTHORIZING THE
MAYOR TO EXECUTE SAME
WHEREAS, the City of Paducah wishes to enter into a Fleet Maintenance Service
Agreement with the Kevil Rural Fire Department for the City of Paducah Fleet Department to
provide fleet services at hourly rates.
NOW, THEREFORE, BE IT ORDERED BY THE CITY OF PADUCAH,
KENTUCKY:
SECTION 1. That the Board of Commissioners hereby authorizes the Mayor to
execute the City of Paducah Fleet Maintenance, Motorized Equipment and Emergency
Apparatus Service Agreement (hereinafter the “Agreement”) with the Kevil Rural Fire
Department in substantially the form attached hereto and made part hereof (Exhibit A).
SECTION 2. That the hourly labor rates are as follows:
Shop Hourly Labor Rate
Heavy Truck $95 per hour
Heavy Equipment $95 per hour
Passenger Vehicle $85 per hour
Light Truck $85 per hour
Small Engine $75 per hour
SECTION 3. That the initial term of the Agreement shall be for a period of one
(1) year. Such term shall automatically renew at the end of the Initial Term and any subsequent
terms thereafter for an additional one (1) year unless either party terminates the Agreement upon
60 day’s written notice in accordance with Paragraph 7 of the Agreement. In addition, the City
of Paducah may terminate the Agreement with cause upon thirty days’ written notice for non-
payment of fees.
SECTION 4. This Order shall be in full force and effect from and after the date
of its adoption.
______________________________________
George Bray, Mayor
ATTEST:
__________________________
Lindsay Parish, City Clerk
Introduced by the Board of Commissioners, July 13, 2021
Adopted by the Board of Commissioners, July 13, 2021
mo/agree-fleet maintenance services – Kevil Rural Fire Department
EXHIBIT A
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Authorize Contract with Aramark for Uniform Services for use by the Public Works Department,
Engineering Department, and Parks Department - C YARBER
Category: Municipal Order
Staff Work By: Debbie Collins
Presentation By: Chris Yarber
Background Information: On June 3, 2021, sealed written bids were opened and read aloud for Uniform
Services for use by the Public Works Department, Engineering Department and Parks Department. After
reasonable consideration of the bids received, the bid submitted by Aramark Uniform Services was found to be
the responsive lowest evaluated bid price in accordance with the specifications. Therefore, recommendation is
made to accept the Unit Prices given in the June 3, 2021 bid by Aramark Uniform Services. The contract period
shall be a Two-Year time period beginning upon execution of the Contract Agreement with two one-year
optional renewals upon the mutual agreement of both parties.
Does this Agenda Action Item align with a Commission Priority? No
If yes, please list the Commission Priority: Commission Priorities List
Communications Plan:
Funds Available:Account Name: Various Accounts
Account Number:
Staff Recommendation: Approve a Municipal Order authorizing the Mayor to execute a contract with
Aramark Uniform Services for Uniform Services for use by the Public Works Department, Engineering
Department and Parks Department at the Unit Prices quoted in the Bid Proposal dated June 3, 2021.
Attachments:
1.MO bid- Aramark - Public Works-Eng-Parks 2021
2.Aramark - bid proposal
3.Bid Tab - Uniforms
4.00330 - Evaluation Form Aramark
5.00020 - Invitation to Bid
6.Uniform Contract Quick Sheet
7.Proposed Contract-Agreement
8.UniFirst - bid proposal
MUNICIPAL ORDER NO. _______
A MUNICIPAL ORDER ACCEPTING THE BID OF ARAMARK UNIFORM
SERVICE FOR UNIFORM SERVICES FOR THE PUBLIC WORKS DEPARTMENT,
ENGINEERING DEPARTMENT AND THE PARKS DEPARTMENT AND AUTHORIZING
THE MAYOR TO EXECUTE A CONTRACT FOR SAME
BE IT ORDERED BY THE BOARD OF COMMISSIONERS OF THE CITY OF
PADUCAH, KENTUCKY:
SECTION 1. That the City of Paducah accepts the bid of Aramark Uniform
Services, for uniform services for the Public Works Department, Engineering Department and
Parks Department for the unit prices as shown below for a period of two years, beginning on
execution of the Contract Agreement, said purchase being in substantial compliance with the bid
specifications, advertisement for bid, and as contained in the bid of Aramark Uniform Service,
dated June 3, 2021:
UNIFORM SERVICES UNIT PRICES
ITEM NO. UNIFORM ITEMS UNIT BID PRICE
1 Work Shirts - 65/35 poly/cotton blend - short sleeve - two pocket -
snap and button styles $1.25
2 Work Shirts - 65/35 cotton/ploy blend - long sleeve - two pocket -
snap and button styles $1.25
3 Work Shirts - 100% cotton - short sleeve- two pocket - snap and
button styles $1.45
4 Work Shirts - 100% cotton - long sleeve- two pocket - snap and
button styles $.45
5 Work Pants - 65/35 ploy/cotton blend - flat front style $1.90
6 Work Pants - 65/35 ploy/cotton blend - boot cut flare style $1.90
7 Work Pants - 65/35 ploy/cotton blend - side elastic style $1.90
8 Work Pants - 65/35 ploy/cotton blend - pleated style $1.90
9 Work Pants - 100% cotton - two front pockets $2.25
10 Executive Oxford Shirts - 60/40 cotton/poly short sleeve $2.50
11 Executive Oxford Shirts - 60/40 cotton/poly long sleeve $2.50
12 Executive Polo Knit Shirts - 100% poly short sleeve $1.45
13 Coveralls - 65/35 poly/cotton blend $1.00
14 Coveralls – 100% cotton $1.00
15 Work Jackets - 65/35 poly/cotton blend - long panel front $.25
16 Work Jackets - 65/35 poly/cotton blend - short length $.25
ADDITIONAL ITEMS UNIT PRICES
ITEM NO. ADDITIONAL ITEMS UNIT BID PRICE
17 Shop Towels $.03
18 Fender Covers $.25
19 3’ x 5’ walk-off mats $1.00
20 3’ x 10’ walk-off mats $2.25
21 4’ x 6’ walk-off mats $1.50
22 Dust mops- 24” $.50
23 Dust mops-36” $.75
24 Wet mops $.75
25 Handle for mops $0.00
26 Laundry Bag and stand $0.00
SECTION 2. That the Mayor is hereby authorized to execute a contract with
Aramark Uniform Service, for furnishing the City with uniform services as authorized in
Section 1 above, according to the specifications, bid proposal, and all contract documents
heretofore approved and incorporated in the bid. Said contract is for a two-year time period
beginning upon execution of the Contract, with two one-year optional renewals upon the mutual
agreement of both parties.
SECTION 3. That payment for said uniform services shall be charged to Various
Accounts
SECTION 4. This Order will be in full force and effect from and after the date of its
adoption.
____________________________________
George Bray, Mayor
ATTEST:
________________________________
Lindsay Parish, City Clerk
Adopted by the Board of Commissioners, July 13, 2021
Recorded by Lindsay Parish, City Clerk, July 13, 2021
\mo\bid-Aramark –Public Works- Eng.- Parks - 2021
CITY OF PADUCAH , KENTUCKY
ENGINEERING-PUBLIC WORKS DEPARTMENT
Uniforms for Public Works, Engineering & Parks Department
LOWEST EVALUATED BID
Bid Opening: 2:00 p.m., CST, on Thursday, June 3, 2021
BID RECOMMENDED FOR ACCEPTANCE
OFFICIAL BIDDER OF RECORD:
Contact:
Mailing Address:
ITEM APPROX
NO # OF EMPLOYEES*
1 Work Shirts - Unit Bid Price is for 11 Shirts - 65/35 poly/cotton
blend - short sleeve - two pocket - snap and button styles 50 $1.25 $62.50 $1.24 $62.00
2 Work Shirts - Unit Bid Price is for 11 Shirts- 65/35 cotton/ploy
blend - long sleeve - two pocket - snap and button styles 50 $1.25 $62.50 $1.24 $62.00
3 Work Shirts - Unit Bid Price is for 11 Shirts - 100% cotton -
short sleeve- two pocket - snap and button styles 20 $1.45 $29.00 $1.45 $29.00
4 Work Shirts - Unit Bid Price is for 11 Shirts - 100% cotton - long
sleeve- two pocket - snap and button styles 20 $1.45 $29.00 $1.45 $29.00
5 Work Pants - Unit Bid Price is for 11 Pants - 65/35 ploy/cotton
blend - flat front style 25 $1.90 $47.50 $1.90 $47.50
6 Work Pants - Unit Bid Price is for 11 Pants - 65/35 ploy/cotton
blend - boot cut flare style 20 $1.90 $38.00 $1.90 $38.00
7 Work Pants - Unit Bid Price is for 11 Pants - 65/35 ploy/cotton
blend - side elastic style 5 $1.90 $9.50 $1.90 $9.50
8 Work Pants - Unit Bid Price is for 11 Pants - 65/35 ploy/cotton
blend - pleated style 5 $1.90 $9.50 $1.90 $9.50
9 Work Pants - Unit Bid Price is for 11 Pants - 100% cotton - two
front pockets 20 $2.25 $45.00 $2.25 $45.00
10 Executive Oxford Shirts - Unit Bid Price is for 11 Shirts - 60/40
cotton/poly short sleeve 5 $2.50 $12.50 $2.50 $12.50
11 Executive Oxford Shirts - Unit Bid Price is for 11 Shirts - 60/40
cotton/poly long sleeve 5 $2.50 $12.50 $2.50 $12.50
12 Executive Polo Knit Shirts - Unit Bid Price is for 11 Shirts -
100% poly short sleeve 5 $1.45 $7.25 $1.10 $5.50
13 Coveralls - Unit Bid Price is for 2 Coveralls - 65/35 poly/cotton
blend 20 $1.00 $20.00 $0.70 $14.00
14 Coveralls - Unit Bid Price is for 2 Coveralls – 100% cotton 15 $1.00 $15.00 $0.86 $12.90
15 Work Jackets - Unit Bid Price is for 2 Jackets - 65/35
poly/cotton blend - long panel front 35 $0.25 $8.75 $0.25 $8.75
16 Work Jackets - Unit Bid Price is for 2 Jackets - 65/35
poly/cotton blend - short length 35 $0.25 $8.75 $0.25 $8.75
ITEM APPROX
NO NUMBER*
17 Shop Towels 1,000 $0.03 $30.00 $0.03 $30.00
18 Fender Covers 50 $0.25 $12.50 $0.25 $12.50
19 3’ x 5’ walk-off mats 15 $1.00 $15.00 $1.00 $15.00
20 3’ x 10’ walk-off mats 15 $2.25 $33.75 $2.25 $33.75
21 4’ x 6’ walk-off mats 8 $1.50 $12.00 $1.50 $12.00
22 Dust mops - 24”5 $0.50 $2.50 $0.36 $1.80
23 Dust mops -36”3 $0.75 $2.25 $0.54 $1.62
24 Wet mops 10 $0.75 $7.50 $0.24 $2.40
25 Handle for mops 10 No Charge $0.00 $0.00
26 Laundry Bags and stands 2 No Charge $0.00 $0.00
$532.75 $515.47
The Successful Bidder’s “Unit Bid Prices” will be utilized as the Contract Prices.
ADDITIONAL INFORMATION:
Additional charge for shirts larger than: _____________ size
Additional charge for pants larger than: _____________ size
Insurance Protection - Per employee
Hypoallergenic detergent used in cleaning of uniforms and other supplies?
Additional charge for using Hypoallergenic detergent
PREFERENCE TO KENTUCKY BIDDERS:
State Bidder is Resident
If Not KY Resident - Preference given
Addition Reciprocal Preference for KY Bidders
REQUIRED DOCUMENTS:
1. Bid Bond - $5,000
2. Compliance with Tech Specs form
3. Exceptions of Non-Compliance Attached
4. Certifications Signed and Notarized
5. References
6. Proposed Written Schedule
7. Additonal Information
Facility Location:
RESPONSIVE & RESPONSIBLE BIDDER:
EVALUATION SCORE:
UNIFORM ITEMS
ADDITIONAL ITEMS
No No
UNIT BID PRICE
*** NOTE: The use of the “Approximate Number of Employees” and the “Approximate Number x Unit Bid Price” will be used to assist in determination of
the “Lowest Bid Price” ONLY.
Bidder understands that the City will not guarantee any quantity nor will the City guarantee a total Contract amount.
TOTAL MULTIPLIED AMOUNT
APPROX # X
UNIT BID PRICE UNIT BID PRICE
Yes
No N/A
No No
$0.95 $0.65
APPROX # X
UNIT BID PRICE
270-247-5058
Unifirst Corp
Nathaniel Curtsinger
150 Kraft St
Clarksville, TN 37040
931-645-8323
Aramark Uniform Services
James B. Flowers
210 Tice Road
Mayfield, KY 42066
N/A
APPROX # X
UNIT BID PRICEUNIT BID PRICE
Mayfield, KY
100
Yes
Yes
Yes
No
N/A
Yes
N/A
N/A
N/A
No
N/A
N/A
Yes
Yes
Yes
N/A
Yes
Yes
NO
Branch - Clarksville, TN
UNIT BID PRICE APPROX # X
UNIT BID PRICE
No
Yes
No
No
Uniform Contract
• There is a calculation error on the bid item 6 (Work Pants) which accounts for a small
change between the actual bid and the bid tab total.
• Aramark and UniFirst were the only companies to request bid packets.
• Unifirst was declared non-responsive/responsible bidder due to non-compliance with
bid specifications.
• Aramark was the previous provider and has continued to do so without a contract and
has been doing so since November of 2020.
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Declaration of Trust and Trust Partnership Agreement for the Kentucky League of Cities
Workers' Compensation Trust - S SUAZO
Category: Municipal Order
Staff Work By: Stefanie Suazo
Presentation By: Stefanie Suazo
Background Information: Insurance regulations as they pertain to self-insured associations requires pool
members to execute a participation agreement annually. These agreements were signed when the City first
became a member of the Kentucky League of Cities insurance pool, and the annual re-signing does not change
any of the provisions contained in those original agreements.
Does this Agenda Action Item align with a Commission Priority? No
If yes, please list the Commission Priority:
Communications Plan:
Funds Available:Account Name:
Account Number:
Staff Recommendation: Sign KLC Participation Agreement to remain in self-insured pool.
Attachments:
1.MO agree – Declaration of Trust & Trust Participation WC KLC 2021
2.WC Trust Agreement FY2022
MUNICIPAL ORDER NO. __________
A MUNICIPAL ORDER AUTHORIZING THE MAYOR TO EXECUTE A
DECLARATION OF TRUST AND TRUST PARTICIPATION AGREEMENT WITH THE
KENTUCKY LEAGUE OF CITIES INSURANCE SERVICES FOR THE WORKERS
COMPENSATION TRUST
NOW, THEREFORE, BE IT ORDERED BY THE CITY OF PADUCAH, KENTUCKY
SECTION 1. That the City of Paducah hereby authorizes the Mayor to execute
the Declaration of Trust and Trust Participation Agreement with the Kentucky League of Cities
Insurance Services for the Workers Compensation Trust.
SECTION 2. This Order shall be in full force and effect from and after the date of
its adoption.
______________________________
Mayor
ATTEST:
_____________________________
Lindsay Parish, City Clerk
Adopted by the Board of Commissioners, July 1 3, 2021
Recorded by Lindsay Parish, City Clerk, July 13, 2021
\mo\ agree – Declaration of Trust & Trust Participation WC - KLC 2021
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Trust Participation Agreement - Kentucky League of Cities Insurance Services - General
Insurance Trust - S SUAZO
Category: Municipal Order
Staff Work By: Stefanie Suazo
Presentation By: Stefanie Suazo
Background Information: Insurance regulations as they pertain to self-insured associations requires pool
members to execute a participation agreement annually. These agreements were signed when the City first
became a member of the Kentucky League of Cities insurance pool, and the annual re-signing does not change
any of the provisions contained in those original agreements. This agreement pertains to property, liability, and
auto insurance coverages.
Does this Agenda Action Item align with a Commission Priority? No
If yes, please list the Commission Priority:
Communications Plan:
Funds Available:Account Name:
Account Number:
Staff Recommendation: Sign KLC Participation Agreement to remain in self-insured pool.
Attachments:
1.MO agree – Declaration of Trust & Trust Participation – General Ins. KLC 2021
2.Gen Ins Agreement FY2022
MUNICIPAL ORDER NO. _____
A MUNICIPAL ORDER AUTHORIZING THE MAYOR TO EXECUTE A
DECLARATION OF TRUST AND TRUST PARTICIPATION AGREEMENT WITH THE
KENTUCKY LEAGUE OF CITIES INSURANCE SERVICES FOR THE GENERAL
INSURANCE TRUST
NOW, THEREFORE, BE IT ORDERED BY THE CITY OF PADUCAH, KENTUCKY
SECTION 1. That the City of Paducah hereby authorizes the Mayor to execute
the Declaration of Trust and Trust Participation Agreement with the Kentucky League of Cities
Insurance Services for the General Insurance Trust.
SECTION 2. This Order shall be in full force and effect from and after the date of
its adoption.
______________________________
George Bray, Mayor
ATTEST:
_____________________________
Lindsay Parish, City Clerk
Adopted by the Board of Commissioners, July 1 3, 2021
Recorded by Lindsay Parish, City Clerk, July 13, 2021
\mo\ agree – Declaration of Trust & Trust Participation – General Ins. KLC 2021
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Declaration and Transfer of Surplus Property to Habitat for Humanity (2011 Guthrie Avenue) - N
HUTCHISON
Category: Municipal Order
Staff Work By: Nancy Upchurch
Presentation By: Nicholas Hutchison
Background Information: Paducah McCracken County Habitat for Humanity requests that the property be
donated for the construction of a single-family residence. They will construct a single-family 3-bedroom two
bath home. The home will have a front porch. A family has already been selected for this home. Additional
site improvements also include the planting of at least one tree on the property. The proposed investment is
approximately $95,000.
Does this Agenda Action Item align with a Commission Priority? Yes
If yes, please list the Commission Priority: Housing
Continued investment in the improvement of our housing stock
Communications Plan:
Funds Available:Account Name:
Account Number:
Staff Recommendation:
Transfer of the property to Paducah Habitat for Humanity for the purpose of constructing a single family
residence for a pre-selected family.
Attachments:
1.MO - prop sale– 2011 Guthrie Avenue, Paducah, KY
2.SOA2021-0037 Staff Report 2011 Guthrie Ave
3.Bid 2011 Guthrie Avenue
MUNICIPAL ORDER NO. ______
A MUNICIPAL ORDER DECLARING THE REAL PROPERTY
LOCATED AT 2011 GUTHRIE AVENUE, PADUCAH, KENTUCKY TO BE
SURPLUS PROPERTY, TRANSFERRING THE PROPERTY TO HABITAT FOR
HUMANITY FOR ECONOMIC DEVELOPMENT PURPOSES, AND AUTHORIZING
THE MAYOR TO EXECUTE THE DEED AND ALL DOCUMENTS RELATED TO
SAME
WHEREAS, pursuant to Section 2-668 of the Code of Ordinances of the
City of Paducah, Kentucky, a written determination has been made that the City does not
have any use at this time or in the future for property located at 2011 Guthrie Avenue,
Paducah, KY, which constitutes surplus real estate; and
WHEREAS, it is recommended that the City of Paducah accept the
request of the Habitat for Humanity to donate the property for this project in accordance
with KRS 82.083(4)(b), subject to the standard clause applied in the Fountain Avenue
Revitalization Area, stating that the property would revert back to the City if the owner
fails to comply with the submitted proposal and fails to substantially complete the project
within two years; and
WHEREAS, the City desires to accept the proposal of Paducah-
McCracken County Habitat For Humanity, to make improvements to the property and
build a three-bedroom, two bath home, with a proposed investment in the amount of
$95,000.
NOW THEREFORE, BE IT ORDERED BY THE CITY OF PADUCAH,
KENTUCKY:
SECTION 1. The Board of Commissioners hereby declares the property
located at 2011 Guthrie Avenue, Paducah, Kentucky, to be surplus property as it relates
to the operations of the City and authorizes the transfer of the property to McCracken
County Habitat for Humanity. Further, it is determined that it is necessary and desirable
and in the best interest of the City to execute the consideration certificate contained in
said deed of conveyance.
SECTION 2. The Mayor is hereby authorized to execute the deed of
conveyance and any necessary documents relating to same to complete the transfer of the
real property approved in Section 1 above.
SECTION 3. This Order shall be in full force and effect from and after
the date of its adoption.
______________________________
Mayor
ATTEST:
___________________________
Lindsay Parish, City Clerk
Adopted by the Board of Commissioners, July 13, 2021
Recorded by Lindsay Parish, City Clerk, July 13, 2021
\mo\prop sale– 2011 Guthrie Avenue, Paducah, KY
STAFF REPORT
PADUCAH CITY COMMISSION
SOA
APPLICATION I NFORMATION
GENERAL SITE I NFORMATION
CURRENT ZONING R-3 Medium Density Residential Zone
CURRENT LAND USE Vacant
COMPREHENSIVE PLAN Neighborhood Conservation
CURRENT IMPROVEMENTS None
FLOODPLAIN No
PUBLIC UTILITIES Power, gas, water
PUBLIC SERVICES Paducah Fire, Paducah Police
SURROUNDING AREA I NFORMATION
SURROUNDING ZONING SURROUNDING LAND USE
NORTH R-3 Single-family
SOUTH NSZ Guthrie Avenue/ Single-family
EAST NSZ Single-family
WEST NSZ North 16th Street/ Single-family
GENERAL INFORMATION
The disposition of surplus or excess property is governed by City Code Section 2 -668; which
references KRS 82.083.
KRS 82.083 (4) (b) states real or personal property may be transferred with or without
compensation, for economic development purposes, which shall include, but not limited to;
real property transfers for the elimination of blight. Staff is of the opinion that the Habitat for
Humanity’s mission to assist low to moderate income families achieve the American dream of
affordable, quality home ownership meets the standard of elimination of blight.
ADDRESS 2011 Guthrie Avenue
CASE NO. SOA2021-0037
OWNER City of Paducah
APPLICANT Habitat for Humanity
AGENT ---
REQUEST Sale of Asset
HEARING DATE July 13, 2021
STAFF REPORT (continued) page 2 of 4
Vicinity Map 1:5000
Zone Map 1:2000
STAFF REPORT (continued) page 3 of 4
ACQUISITION OF THE PROPERTY
The Urban Renewal and Community Development Agency acquired this property in July 2020.
The structure on the lot was demolished.
DISPOSITION OF THE PROPERTY
Typically, it is in the best interest of the City to transfer ownership of underutilized parcels to a
responsible citizen, thereby placing the property back on the tax rolls and eliminating the
maintenance and liability costs. This lot is located in an established residential neighborhood.
The Comprehensive Plan recommends Neighborhood Conservation.
BID INFORMATION
Paducah McCracken County Habitat for Humanity requests that the property be donated for
the construction of a single-family residence. They will construct a single-family 3-bedroom two
bath home. The home will have a front porch. A family has already been selected for this home.
Additional site improvements also include the planting of at least one tree on the property. The
attached design plan is a plan used to build the Habitat home at 2114 Jackson Ste The proposed
investment is approximately $95,000.
Paducah McCracken County Habitat for Humanity Bid Amount: $0
Future Land Use Map 1:2000
STAFF REPORT (continued) page 4 of 4
STAFF RECOMMENDATION
It is recommended to determine that the property is surplus and accept the request of the Habitat
for Humanity to donate the property for this project subject to the standard clause applied in
the Fountain Avenue Revitalization Area stating that the property would revert back to the City
if the owner fails to comply with the submitted proposal and fails to substantially complete the
project within two years.
***
BID
#1
The Paducah McCracken County Habitat for Humanity proposes to construct a
single-family (three- bedroom, two-bath) home for qualified buyer. Affordable
Housing Program Funds if awarded later this year).
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Declaration and Transfer of Surplus Property to Midtown Alliance of Neighbors (513 North 14th
Street) - N HUTCHISON
Category: Municipal Order
Staff Work By: Nancy Upchurch
Presentation By: Nicholas Hutchison
Background Information: The Midtown Alliance of Neighbors has submitted a request asking the City
Commission donate the property for the purpose of constructing a single-family residence utilizing a variety of
funding sources making the home affordable for a low to moderate home buyer.
Does this Agenda Action Item align with a Commission Priority? Yes
If yes, please list the Commission Priority: Housing
Continued investment in the improvement of out housing stock.
Communications Plan:
Funds Available:Account Name:
Account Number:
Staff Recommendation:
Transfer of the property at 513 North 14th Street to Midtown Alliance of Neighbors for the purpose of
constructing a single family residence for a pre-selected, qualified family.
Attachments:
1.MO - prop sale– 513 North 14th Street, Paducah, KY
2.SOA2021-0035 Staff Report 513 N 14th St.docx
3.Bid 513 N 14th
MUNICIPAL ORDER NO. ______
A MUNICIPAL ORDER DECLARING THE REAL PROPERTY
LOCATED AT 513 NORTH 14TH STREET PADUCAH, KENTUCKY TO BE
SURPLUS PROPERTY, TRANSFERRING THE PROPERTY WITHOUT
COMPENSATION TO MIDTOWN ALLIANCE OF NEIGHBORS FOR ECONOMIC
DEVELOPMENT PURPOSES, AND AUTHORIZING THE MAYOR TO EXECUTE
THE DEED AND ALL DOCUMENTS RELATED TO SAME
WHEREAS, pursuant to Section 2-668 of the Code of Ordinances of the
City of Paducah, Kentucky, a written determination has been made that the City does not
have any use at this time or in the future for property located at 513 North 14th Street,
Paducah, KY, which constitutes surplus real estate; and
WHEREAS, it is recommended that the City of Paducah accept the
request of the Midtown Alliance of Neighbors to transfer the property in accordance with
KRS 82.083(4)(b), and subject to the standard clause applied in the Fountain Avenue
Revitalization Area, stating that the property would revert back to the City if the owner
fails to comply with the submitted proposal and fails to substantially complete the project
within two years; and
WHEREAS, the City desires to accept the proposal of Midtown Alliance
of Neighbors, to make improvements to the property and build a three-bedroom, two bath
home, with a proposed investment in the amount of $188,000.
NOW THEREFORE, BE IT ORDERED BY THE CITY OF PADUCAH,
KENTUCKY:
SECTION 1. The Board of Commissioners hereby declares the property
located at 513 North 14th Street, Paducah, Kentucky, to be surplus property as it relates
to the operations of the City, and authorizes the transfer of the property to Midtown
Alliance of Neighbors in accordance with the proposal of Midtown Alliance of Neighbors
on June 10, 2021. Further, it is determined that it is necessary and desirable and in the
best interest of the City to execute the consideration certificate contained in said deed of
conveyance.
SECTION 2. The Mayor is hereby authorized to execute the deed of
conveyance and any necessary documents to complete the transfer of the real property
approved in Section 1 above.
SECTION 3. This Order shall be in full force and effect from and after
the date of its adoption.
______________________________
Mayor
ATTEST:
___________________________
Lindsay Parish, City Clerk
Adopted by the Board of Commissioners, July 13, 2021
Recorded by Lindsay Parish, City Clerk, July 13, 2021
\mo\prop sale– 513 North 14th Street, Paducah, KY
STAFF REPORT
PADUCAH CITY COMMISSION
SOA
APPLICATION I NFORMATION
GENERAL SITE I NFORMATION
CURRENT ZONING NSZ Neighborhood Services Zone
CURRENT LAND USE Vacant
COMPREHENSIVE PLAN Neighborhood Plan 1
CURRENT IMPROVEMENTS None
FLOODPLAIN No
PUBLIC UTILITIES Power, gas, water
PUBLIC SERVICES Paducah Fire, Paducah Police
SURROUNDING AREA I NFORMATION
SURROUNDING ZONING SURROUNDING LAND USE
NORTH NSZ Single-family
SOUTH NSZ Single-family
EAST NSZ North 14th Street/ Recreation
WEST NSZ Single-family
GENERAL INFORMATION
The disposition of surplus or excess property is governed by City Code Section 2 -668; which
references KRS 82.083.
KRS 82.083 (4) (b) states real or personal property may be transferred with or without
compensation, for economic development purposes, which shall include, but not limited to;
real property transfers for the elimination of blight. Staff is of the opinion that the Midtown
Alliance of Neighbors’ mission to assist low to moderate income families achieve the American
dream of affordable, quality home ownership meets the standard of elimination of blight.
ADDRESS 513 North 14th Street
CASE NO. SOA2021-0035
OWNER City of Paducah
APPLICANT Midtown Alliance of Neighbors
AGENT ---
REQUEST Sale of Asset
HEARING DATE July 13, 2021
STAFF REPORT (continued) page 2 of 4
Vicinity Map 1:5000
Zone Map 1:2000
STAFF REPORT (continued) page 3 of 4
ACQUISITION OF THE PROPERTY
The Urban Renewal and Community Development Agency acquired this property in May 2012
with the intention of using the lot in the Fountain Avenue Revitalization Program. The building
on the property was demolished several years ago. URCDA has advertised the property in the
past with the hope of finding a person willing to build a single-family residence on the lot.
DISPOSITION OF THE PROPERTY
Typically, it is in the best interest of the City to transfer ownership of underutilized parcels to a
responsible citizen, thereby placing the property back on the tax rolls and eliminating the
maintenance and liability costs. This lot is located in an established, recently revitalized
residential neighborhood. The Comprehensive Plan recommends Neighborhood Plan 1, in
which residential development should be designed and configured to complement the existing
neighborhood.
BID INFORMATION
This property has been advertised several times over the recent past with no responsible bidder
making an offer to construct a home. The Midtown Alliance of Neighbors has submitted a
request asking the City Commission donate the property for the purpose of constructing a
Future Land Use Map 1:2000
STAFF REPORT (continued) page 4 of 4
single-family residence utilizing a variety of funding sources making the home affordable for a
low to moderate home buyer.
STAFF RECOMMENDATION
The lot is located within the Neighborhood Services Zone, which requires Historic Architecture
Review Commission (HARC) review and approval of the plans and design for new construction
or exterior changes in this zone.
Therefore, it is recommended to determine that the property is surplus and accept the request
of the Midtown Alliance of Neighbors to donate the property for this project subject to the
standard clause applied in the Fountain Avenue Revitalization Area stating that the property
would revert back to the City if the owner fails to comply with the submitted proposal and fails
to substantially complete the project within two years.
***
BID
#1
Midtown Alliance of Neighbors Bid Amount: $0
The Midtown Alliance of Neighbors proposes to construct a single-family (three-
bedroom, two-bath) home for qualified buyer Carolyn Webb. Total investment
$188,000 Funding sources include KY Housing Corporation Homebuyer
Development Grant of $55,000; Homeowner Mortgage: $100,000; City of Paducah
Home Owner Incentive: $18,000 and MAN LMI Homebuyer restricted funds,
$15,000 (These funds may be replaced with FHLB Affordable Housing Program
Funds if awarded later this year).
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Approve the allocation of American Rescue Plan Act Funds in the amount of $4 million toward
specific Stormwater Infrastructure Projects - J ARNDT
Category: Municipal Order
Staff Work By: James Arndt
Presentation By: James Arndt
Background Information: This Municipal Order designates $4 million out of the American Rescue Plan
Act grant proceeds to be used for various stormwater capital improvement projects within the City of Paducah.
These projects have been identified by our Engineering Department through consultation with our Stormwater
consultant Strand Associates, Inc. Separate authorizing instruments will come before the Board of
Commissioners for each individual project.
Does this Agenda Action Item align with a Commission Priority? Yes
If yes, please list the Commission Priority: Stormwater.
Communications Plan:
Funds Available:Account Name:
Account Number:
Staff Recommendation: Approval.
Attachments:
1.MO ARPA funding – Stormwater Infrastructure
MUNICIPAL ORDER NO. _____
A MUNICIPAL ORDER FORMALIZING THE PADUCAH CITY
COMMISSION’S INTENTION TO ALLOCATE $4,000,000 OF THE AMERICAN RESCUE
PLAN ACT FUNDS TOWARD STORMWATER CAPITAL IMPROVEMENT PROJECTS IN
THE CITY OF PADUCAH
WHEREAS, on March 11, 2021, the American Rescue Plan Act of 2021
(“ARPA”) was signed into law; and
WHEREAS, the relief package provides funding in several areas such as public
health response, economic impacts of the public health emergency, low-income communities, the
replacement of public sector revenue, essential worker wages, and investments in water, sewer
and broadband infrastructure; and
WHEREAS, the City of Paducah expects to receive an approximate total of
$6,439,016 in American Rescue Plan Act funds in two (2) tranches; and
WHEREAS, the City Commission desires to state its intention to use $4,000,000
of the American Rescue Plan Act funding for stormwater infrastructure projects in the City of
Paducah as identified by the Paducah Engineering Department in consultation with stormwater
consultant Strand Associates, Inc.
NOW, THEREFORE, BE IT ORDERED BY THE CITY OF PADUCAH,
KENTUCKY:
SECTION 1. That the Board of Commissioners of the City of Paducah, Kentucky
hereby formalizes its intention to allocate $4,000,000 of the American Rescue Plan Act funds to
various stormwater capital improvement projects within the City of Paducah.
SECTION 2. This Order shall be in full force and effect from and after the date
of its adoption.
_____________________________
George Bray, Mayor
ATTEST:
________________________
Lindsay Parish, City Clerk
Adopted by the Board of Commissioners, July 13, 2021
Recorded by Lindsay Parish, City Clerk, July 13, 2021
\mo\ARPA funding – Stormwater Infrastructure
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Acquisition of Permanent Public Utility and Drainage Easements from Gill Family Properties,
LLC located at 701 & 702 Oakcrest Drive for the Buckner Lane Bridge Replacement Project - R MURPHY
Category: Municipal Order
Staff Work By: Melanie Townsend
Presentation By: Rick Murphy
Background Information: Summary: Permanent Utility and Drainage Easements for Buckner Lane Bridge
Replacement Project.
Background: During the past several months, negotiations have been conducted in good faith with the property
owners located at 701 & 702 Oakcrest Drive regarding the acquisition of a portion of public utility and
drainage easements (Parcel #6) as required for the Buckner Lane Bridge Replacement Project. Subsequently,
Gill Family Properties, LLC has agreed to grant permanent public utility and drainage easements totaling 0.273
acres (11,889.247 sq. ft.) to the City of Paducah for repaving a portion of the affected parking lot at 701
Oakcrest Dr. and the entire parking lot at 702 Oakcrest Dr. in lieu of financial consideration.
Does this Agenda Action Item align with a Commission Priority? Yes
If yes, please list the Commission Priority: Stormwater
Communications Plan: Negotiations with individual property owners
Coordination with Communications Manager for press releases and social media posts
Funds Available:Account Name: General Stormwater Improvements
Account Number: DR0010
Staff Recommendation: To adopt a Municipal Order authorizing the Mayor to execute a Deed of
Conveyance and all related documents on behalf of the City of Paducah with Gill Family Properties, LLC to
acquire a portion of real property located at 701 & 702 Oakcrest Drive as permanent public utility and drainage
easements in consideration of the City causing a portion of the affected parking lot at 701 Oakcrest Dr. and the
entire parking lot at 702 Oakcrest Dr. to be repaved in lieu of financial consideration for the Buckner Lane
Bridge Replacement Project.
Attachments:
1.MO prop pur – 701 & 702 Oakcrest Drive (Buckner Lane Bridge Project)
MUNICIPAL ORDER NO. _____
A MUNICIPAL ORDER AUTHORIZING THE MAYOR TO EXECUTE A
DEED OF CONVEYANCE AND ALL DOCUMENTS NECESSARY TO ACQUIRE A
PORTION OF REAL PROPERTY LOCATED AT 701 AND 702 OAKCREST DRIVE AS
PUBLIC UTILITY AND DRAINAGE EASEMENTS AS REQUIRED FOR THE BUCKNER
LANE BRIDGE REPLACEMENT PROJECT
BE IT ORDERED BY THE CITY OF PADUCAH, KENTUCKY:
SECTION 1. The Mayor is hereby authorized to execute a Deed of Conveyance
on behalf of the City of Paducah with Gill Family Properties, LLC, to acquire a portion of real
property located at 701 & 702 Oakcrest Drive as permanent public utility and drainage
easements in consideration of the City causing the affected parking lots to be repaved in lieu of
financial consideration for the Buckner Lane Bridge Improvement Project.
SECTION 2. This expenditure shall be charged to the General Stormwater
Improvements Project Account DR0010.
SECTION 3. This Order shall be in full force and effect from and after the date
of its adoption.
_____________________________
George Bray, Mayor
ATTEST:
________________________
Lindsay Parish, City Clerk
Adopted by the Board of Commissioners, July 13, 2021
Recorded by Lindsay Parish, City Clerk, July 13, 2021
\mo\prop pur – 701 & 702 Oakcrest Drive (Buckner Lane Bridge Project)
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Approval of Purchase of Property at 2416, 2420 & 2540 Barnett Street and 2364 South 24th
Street from Hawker Holdings, LLC for $34,500 - R MURPHY
Category: Municipal Order
Staff Work By: Rick Murphy, Melanie Townsend
Presentation By: Rick Murphy
Background Information: Summary: The City has negotiated the purchase of three distressed properties at
2416, 2420 & 2540 Barnett Street and an unimproved property at 2364 South 24th Street to create an overflow
storm water detention area along Cross Creek.
Background: In 2018,the Federal Emergency Management Agency (FEMA) awarded the City public assistance
disaster funding to replace the S. 24th Street Bridge. The City contracted with Jim Smith Contracting and the
bridge replacement was completed in September 2020.
This area is part of a larger project identified in the Comprehensive Stormwater Master Plan. The City also has
plans in design for further improvement of the S 24th St and S. 25th St corridor.
The City plans to create an intermediate upstream detention area measuring approximately 4 acres to help
reduce the occasions of residential flooding created by 25 year frequency rainfall events and/or less.
Does this Agenda Action Item align with a Commission Priority? Yes
If yes, please list the Commission Priority: Stormwater
Communications Plan: Coordination with Communication Manager for news release; social
media posts. Prior to any construction activities the Engineering Department will interact with
the near and adjacent property owners with regard to this pending storm water improvement.
Funds Available:Account Name: General Stormwater Improvements
Account Number: DR0010
Staff Recommendation: Approve the purchase of property at 2416 Barnett Street, 2420 Barnett Street, 2540
Barnett Street and 2364 South 24th St from Hawker Holdings, LLC for $34,500 and authorize the Mayor to
execute all documents associated with the purchase of said properties.
Attachments:
1.MO prop pur – 2416, 2420, 2540 Barnett Street and 2364 South 24th Street
MUNICIPAL ORDER NO. _____
A MUNICIPAL ORDER AUTHORIZING THE MAYOR TO EXECUTE A
DEED OF CONVEYANCE AND ALL DOCUMENTS NECESSARY TO ACQUIRE REAL
PROPERTY LOCATED AT 2416, 2420 AND 2540 BARNETT STREET AND 2364 SOUTH
24TH STREET IN THE AMOUNT OF $34,500, TO CREATE AN OVERFLOW STORM
WATER DETENTION AREA ALONG CROSS CREEK
BE IT ORDERED BY THE CITY OF PADUCAH, KENTUCKY:
SECTION 1. The Mayor is hereby authorized to execute a Deed of Conveyance
on behalf of the City of Paducah with Hawker Holdings, LLC, in the amount of $34,500.00 to
acquire property at 2416 Barnett Street, 2420 Barnett Street, 2540 Barnett Street and 2364 South
24th Street to create an overflow storm water detention area along Cross Creek.
SECTION 2. This expenditure shall be charged to the General Stormwater
Improvements Project Account DR0010.
SECTION 3. This Order shall be in full force and effect from and after the date
of its adoption.
_____________________________
George Bray, Mayor
ATTEST:
________________________
Lindsay Parish, City Clerk
Adopted by the Board of Commissioners, July 13, 2021
Recorded by Lindsay Parish, City Clerk, July 13, 2021
\mo\prop pur – 2416, 2420, 2540 Barnett Street and 2364 South 24th Street
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Accept proposed premiums from the Kentucky League of Cities for Workers’ Compensation,
Liability Insurance and Property Insurance Coverage in a total amount of $1,188,408.13 - S SUAZO
Category: Municipal Order
Staff Work By: Stefanie Suazo
Presentation By: Stefanie Suazo
Background Information: Each year the City of Paducah receives from the Kentucky League of Cities the
invoices for payment of premiums to cover these areas. Total Fiscal Year 2021-2022 (FY 2022) premiums are
for the following: (1) Workers’ Compensation $470,125.59, (2) Liability Insurance $607,745.31, (3) Property
Insurance Coverage $110,537.23. The Health Department to reimburse $3,011.10, for property expenses
associated with coverage of the Health Department. Paxton Park Golf Course to reimburse $5,165 for property
expenses associated with the Golf Park Course.
Does this Agenda Action Item align with a Commission Priority? No
If yes, please list the Commission Priority:
Communications Plan:
Funds Available:Account Name:
Account Number:
Staff Recommendation: Recommend to continue with Kentucky League of Cities Insurance Coverage.
Attachments:
1.MO insurance – klc fy2022
2.FY22 KLC Invoices
MUNICIPAL ORDER NO. _______
A MUNICIPAL ORDER AUTHORIZING THE FINANCE DIRECTOR
TO PAY KENTUCKY LEAGUE OF CITIES FOR WORKERS’ COMPENSATION,
LIABILITY INSURANCE, AND PROPERTY INSURANCE COVERAGE IN A
TOTAL AMOUNT OF $1,188,408.13 FOR THE CITY OF PADUCAH AND
AUTHORIZING THE MAYOR TO EXECUTE ALL DOCUMENTS RELATED TO
SAME
BE IT ORDERED BY THE CITY OF PADUCAH, KENTUCKY:
SECTION 1. That the City of Paducah hereby authorizes the Finance
Director to pay Kentucky League of Cities in the total amount of $1,188,408.13 for
Workers’ Compensation, Liability Insurance, and Property Insurance Coverage for the
City of Paducah for Fiscal Year ending June 30, 2022, for the following policies:
Workers’ Compensation $470,125.59
Liability Insurance $607,745.31
Property Insurance $110,537.23
SECTION 2. This expenditure shall be charged to the Insurance Fund
accounts. The Health Department will reimburse $3,011.10 for property expenses
associated with coverage of the Health Department. Paxton Park Golf Course will
reimburse $5,165.00 for property expenses associated with the Golf Park Course.
SECTION 3. That the City of Paducah hereby authorizes the Mayor to
execute all documents related to the Kentucky League of Cities Worker’s Compensation,
Liability Insurance and Property Insurance Coverage for FY2022 as authorized in Section
1 above.
SECTION 4. This Order shall be in full force and effect from and after
the date of its adoption.
____________________________________
George Bray, Mayor
ATTEST:
_____________________________
Lindsay Parish, City Clerk
Adopted by the Board of Commissioners, July 13, 2021
Recorded by Lindsay Parish, City Clerk, July 13, 2021
\mo\insurance – klc fy2022
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Authorization for Mayor to execute an Employment Agreement with Daron Jordan for the City
Manager position - S SUAZO
Category: Municipal Order
Staff Work By: Stefanie Suazo
Presentation By: Stefanie Suazo
Background Information: After a diligent search lead by the Mayor, Board of Commissioners, and a
recruitment firm; the City is please to bring forward an Employment Agreement to authorize the Mayor to hire
Daron Jordan as the next City Manager of Paducah. Mr. Jordan comes to the City with a wide experience from
other municipalities, most recently noted as the City Manager of Paris, KY.
Does this Agenda Action Item align with a Commission Priority? No
If yes, please list the Commission Priority:
Communications Plan:
Funds Available:Account Name:
Account Number:
Staff Recommendation: It is recommended that the Board of Commissioners approve the municipal order
for the Mayor to execute the employment contract with Daron Jordan for the City Manager position.
Attachments:
1.MO - agree-employment – Daron Jordan, City Manager
2.CITY MANAGER AGREEMENT (00257098) - DARON JODAN June 2021 FINAL
MUNICIPAL ORDER NO. ______
A MUNICIPAL ORDER APPROVING AN EMPLOYMENT AGREEMENT
BETWEEN THE CITY OF PADUCAH AND DARON JORDAN FOR EMPLOYMENT AS
CITY MANAGER, AND AUTHORIZING THE MAYOR TO EXECUTE SAME
WHEREAS, the Paducah City Commission desires to appoint Daron Jordan as
City Manager for the City of Paducah in accordance with KRS 83A.150.
BE IT ORDERED BY THE CITY OF PADUCAH, KENTUCKY:
SECTION 1. Authorization. The Board of Commissioners of the City of
Paducah hereby approves and the Mayor of the City of Paducah, Kentucky, is hereby authorized
to execute an Employment Agreement with Daron Jordan to be employed in the position of City
Manager.
SECTION 2. Effective Date. This Order shall be in full force and effect on and
after the date as approved by the Board of Commissioners of the City of Paducah, Kentucky.
_______________________________
George Bray, Mayor
ATTEST:
__________________________
Lindsay Parish, City Clerk
Adopted by the Board of Commissioners, July 13, 2021
Recorded by Lindsay Parish, City Clerk, July 13, 2021
\mo\agree-employment – Daron Jordan, City Manager
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Approve Professional Consulting Services Agreement with Arndt Municipal Support in an
amount of $7,844.00 plus actual expenses - MAYOR BRAY
Category: Municipal Order
Staff Work By: Lindsay Parish
Presentation By:
Background Information: This Municipal Order approves a consulting agreement between the City of
Paducah and Arndt Municipal Support for executive level management consulting services. The consulting
agreement would provide for up to twenty (20) hours of service per week for the month of August 2021 at a
cost of $7,844.00 plus actual out of pocket expenses (printing, delivery, travel, etc.).
Further, this Municipal Order authorizes a transfer to fund the professional consulting agreement in an amount
of $10,000 from the Administrative Contingency Account No. 10000106 524500 to the City Manager Other
Contractual Services Account No. 10000103 523070.
Does this Agenda Action Item align with a Commission Priority? No
If yes, please list the Commission Priority:
Communications Plan:
Funds Available:Account Name: Other Contractual Services
Account Number: 10000103 523070
Staff Recommendation:
Attachments:
1.agree- Arndt Municipal Support - 2021
MUNICIPAL ORDER NO. ________
A MUNICIPAL ORDER AUTHORIZING AND APPROVING AN
AGREEMENT BETWEEN THE CITY OF PADUCAH AND ARNDT MUNICIPAL
SUPPORT FOR EXECUTIVE LEVEL MANAGEMENT CONSULTING SERVICES IN
AN AMOUNT OF $7,844.00 PLUS ACTUAL OUT-OF-POCKET EXPENSES, AND
AUTHORIZING THE MAYOR TO EXECUTE THE AGREEMENT
BE IT ORDERED BY THE BOARD OF COMMISSIONERS OF THE CITY OF
PADUCAH, KENTUCKY, AS FOLLOWS:
SECTION 1. That the City hereby authorizes and approves an Agreement
with Arndt Municipal Support in substantially the form attached hereto and made part
hereof (Exhibit A), in an amount of $7,844.00 plus actual out-of-pocket expenses, for up to
twenty (20) hours of service per week for the month of August 2021and authorizes the
Mayor to execute said agreement.
SECTION 2. That the City hereby authorizes the transfer of $10,000 from
the Administrative Contingency Account No. 10000106 524500 to the City Manager Other
Contractual Services Account No. 10000103 523070. This agreement shall be funded
through the City Manager Other Contractual Services Account.
SECTION 3. This order shall be in full force and effect from and after the
date of its adoption.
________________________________
George Bray, Mayor
ATTEST:
______________________
Lindsay Parish, City Clerk
Adopted by the Board of Commissioners, July 13, 2021
Recorded by Lindsay Parish, City Clerk, July 13, 2021
\MO\agree- Arndt Municipal Support - 2021
EXHIBIT ‘A’
PROFESSIONAL CONSULTING SERVICES AGREEMENT
This Consulting Agreement (the “Agreement”) is made and entered into and effective
this ___ day of _________, 2021 (the “Effective Date”) by and between The City of Paducah
Kentucky with its principal place of business located at 300 S. 5th Street Paducah, Kentucky 49002
(the “Client”) and Arndt Municipal Support Inc., an Illinois Corporation, with its principal place
of business located at 1542 West Polk Ave Charleston, Illinois 61920 (the “Consultant”) (hereinafter
referred to individually as a “Party” and collectively as “the Parties”).
Recitals
WHEREAS, the Client desires to engage the Consultant to perform services in accordance and
compliance with the “Scope of Services”, attached and incorporated herein as Exhibit A.
WHEREAS, the Consultant desires to perform the Services as hereinafter defined and desires
to be so engaged.
NOW, THEREFORE, in consideration of the foregoing and of the covenants and
agreements herein contained, and other good and valuable consideration, the receipt and
sufficiency of which is hereby acknowledged and approved, the parties, intending to be
legally bound, agree as follows:
Provisions
1. Engagement and Services
(a) Engagement. The Client hereby engages the Consultant to provide and perform the services set
forth in Exhibit A attached hereto (the “Scope of Services”), and the Consultant hereby accepts the
engagement.
(b) Standard of Services. All Services to be provided by Consultant shall be performed with
promptness and diligence in a workmanlike manner and at a level of proficiency to be expected of a
consultant with the background and experience that Consultant has represented it has. The Client shall
provide such access to its information, property and personnel as may be reasonably required in order
to permit the Consultant to perform the Services.
(c) Tools, Instruments and Equipment. Consultant shall provide Consultant’s own tools,
instruments and equipment and place of performing the Services, unless otherwise agreed between
the Parties.
(d) Representation and Warranty. Consultant represents and warrants to the Client that it is under
no contractual or other restrictions or obligations which are inconsistent with the execution of this
Agreement or which will interfere with the performance of the Services.
(e) Legal Compliance. Consultant shall comply with all statutes, ordinances, laws, rules and
regulations which may be applicable to the services provided hereunder.
(f) Client Obligations. Client shall establish a defined point of contact for the duration of the
agreement and shall provide the data necessary to complete the Scope of Services defined herein.
2. Term
(a) Commencement. This Agreement shall commence on August 1, 2021 and shall remain in effect
until the completion of the Scope of Services or the earlier termination of this Agreement as provided
in Article 2 (b) (the “Term”).
(b) Termination. This Agreement may be terminated by either party, without cause and without
liability, by giving thirty (30) calendar days written notice of such termination to the other party. In
the event this Agreement is terminated by the Client, the Consultant shall be paid for all
uncompensated work provided to the Client pursuant to the terms of this agreement.
3. Consultancy Fee and Expenses
(a) Consultancy Fee. In consideration of the Services to be rendered hereunder, the Client shall pay
Consultant a fee payable at the time and pursuant to the procedures set forth in Exhibit B attached
hereto (the “Consultancy Fee").
(b) Out of Pocket Expenses. Consultant shall be entitled to reimbursement for all out of pocket
expenses reasonably incurred in the performance of the Services, as outlined in Exhibit B attached
hereto.
(c) Payment. The Consultant shall submit to the Client a monthly invoice detailing the Services
performed during the preceding month and the amount due. All such invoices shall be due and payable
within fifteen (15) calendar days after receipt thereof by the Client. All invoices submitted pursuant
to this Section shall be sent via email to msmolen@paducahky.gov and said invoices shall be
presumed to be delivered once sent to that email address.
4. Confidentiality and Proprietary Information
Ownership of Data and Documents. All data and information, regardless of its format,
developed or obtained under this Agreement ("Data"), other than the Consultant’s
confidential information, will be and remain the sole property of the Client. The Consultant
must promptly deliver all Data to the Client at the Client’s request. The Consultant is
responsible for the care and protection of the Data until that delivery. The Consultant may
retain one copy of the Data for the Consultant’s records subject to the Consultant’s continued
compliance with the provisions of this Contract.
5. System Access
(a) Grant of License to Access System. Client hereby grants to the Consultant the right to access
and use the System, as defined below, in accordance with the terms of this Agreement.
(b) System. For the purposes of this Agreement “System” means the Client’s information systems,
any information or data in such system and any passwords or other information or devices which are
provided to Consultant to gain access to such system or information therein.
(c) Authorization to Access the System. While this Agreement is in effect, Consultant may access
the System to view and input permitted information. The information which is permitted to be viewed
and input by Consultant shall be limited exclusively to information that is directly pertinent to the
Scope of Services defined herein.
6. Insurance
Proof of Insurance. Consultant shall maintain at its sole expense liability insurance covering the
performance of the Services provided to the Client. Client may require Consultant to provide a
certificate of insurance evidencing such coverage.
7. Independent Contractor
Independent Contractor Services Only. The Consultant agrees that all Services will be rendered by it
as an independent contractor and that this Agreement does not create an employer-employee
relationship between the Consultant and the Client. The Consultant shall have no right to receive any
employee benefits provided by the Client to its employees. Consultant agrees to pay all taxes due in
respect of the Consultancy Fee and to indemnify the Client in respect of any obligation that may be
imposed on the Client to pay any such taxes or resulting from Consultant’s being determined not to
be an independent contractor. This Agreement does not authorize the Consultant to act for the Client
as its agent or to make commitments on behalf of the Client.
8. Indemnification
(a) Professional Liability. With regard to the services to be performed by Consultant pursuant to the
terms of this Agreement, the Consultant shall not be liable to Client, or to anyone who may claim any
right due to his relationship with Client, for any acts or omissions in the performance of said services
on the part of the Consultant or on the part of the agents or employees of the Consultant; except when
said acts or omissions of Consultant are due to its willful misconduct. Client shall hold the Consultant
free and harmless from any obligations, costs, claims, judgments, attorneys’ fees and attachments
arising from or growing out of the services rendered to Client pursuant to the terms of this agreement
or in any way connected with the rendering of said services, except when the same shall arise due to
the willful misconduct as determined by a court of competent jurisdiction.
(b) Limitations on Liability. Client agrees that the liability of Consultant its officers, agents,
employees, and contractors, regardless of the legal theory under which such liability is imposed, shall
not exceed the total fee paid to Consultant for the analysis or recommendations or other associated
services that gave rise to the claim being asserted by Client. In no event shall Consultant its officers,
agents, employees and contractors, be liable for any special, incidental or consequential damages.
9. Force Majeure
Either Party shall be excused from any delay or failure in performance required hereunder if caused
by reason of any occurrence or contingency beyond its reasonable control, including, but not limited
to, acts of God, acts of war, fire, insurrection, strikes, lock-outs or other serious labor disputes, riots,
earthquakes, floods, winter storms, explosions or other acts of nature. The obligations and rights of
the Party so excused shall be extended on a day-to-day basis for the time period equal to the period of
such excusable interruption. When such events have abated, the Parties’ respective obligations
hereunder shall resume.
10. Non-Publicity
Confidentiality. Each of Client and Consultant agree not to disclose the existence or contents of this
Agreement to any third party without the prior written consent of the other Party except: (i) to its
advisors, attorneys or auditors who have a need to know such information, (ii) as required by law or
court order, (iii) as required in connection with the reorganization of a Party, or its merger into any
other corporation, or the sale by a Party of all or substantially all of its properties or assets, or (iv) as
may be required in connection with the enforcement of this Agreement.
11. Assignment
Assignability and Transferability. The Services to be performed by Consultant hereunder are personal
in nature, and Client has engaged Consultant as a result of Consultant’s expertise relating to such
Services. Consultant, therefore, agrees that it will not assign, sell, transfer, delegate or otherwise
dispose of this Agreement or any right, duty or obligation under this Agreement without the Client’s
prior written consent. Nothing in this Agreement shall prevent the assignment by the Client of this
Agreement or any right, duty or obligation hereunder to any third party.
12. Governing Law and Dispute Resolution
(a) Client’s State Law and Venue to Govern. This Agreement shall be governed by and construed in
accordance with the laws of the Commonwealth of Kentucky, without giving effect to any choice of
law or conflict of law provisions. The Parties consent to the jurisdiction and venue in the courts of
McCracken County.
13. General
(a) Entirety. This Agreement constitutes the entire agreement of the Parties on the subject hereof and
supersedes all prior understandings and instruments on such subject. This Agreement may not be
modified other than by a written instrument executed by duly authorized representatives of the Parties.
(b) Waiver of Provisions. No waiver of any provision of this Agreement shall constitute a waiver of
any other provision(s) or of the same provision on another occasion. Failure of either Party to enforce
any provision of this Agreement shall not constitute a waiver of such provision or any other
provision(s) of this Agreement.
(c) Severability. Should any provision of this Agreement be held by a court of competent jurisdiction
to be illegal, invalid or unenforceable, such provision may be modified by such court in compliance
with the law giving effect to the intent of the Parties and enforced as modified. All other terms and
conditions of this Agreement shall remain in full force and effect and shall be construed in accordance
with the modified provision.
14. Taxes
(a) Arndt Municipal Support Inc. FEIN. Consultant has the following identification number for
income tax purposes: 86-1211128
(b) Tax Applicability. Consultant is subject to and responsible for all applicable federal, state, and
local taxes.
(c) Tax Exempt Status. Client represents that it is a tax-exempt entity and evidence of this tax-
exempt stats shall be provided to Consultant at the execution of this agreement.
(signatures appear on following page)
,
IN WITNESS WHEREOF, and intending to be legally bound, the Parties have duly executed this
Agreement by their authorized representatives as of the date first written above.
Signed for and on behalf of Signed for and on behalf of
City of Paducah, Kentucky Arndt Municipal Support Inc.
By: ________________________ By:________________________
Name: Name: James W. Arndt
Title: Title: President/CEO
Exhibit A
Scope of Services
The following list provides a general overview of the work to be done for the City of
Paducah, Kentucky by the Consultant:
Project: Executive Level Management Consulting Services…………………………$7,844.00
Provide miscellaneous local government management consulting services on a retainer basis for up to
twenty (20) hours per week during the month of August 2021. Said services will be provided by phone,
teleconference, Zoom, or in person. Consultant shall perform work as directed by the City Manager’s
Office.
Exhibit B
Consultancy Fee
Consultant shall receive the following compensation for services as defined in this Agreement:
1. Consultancy Fee. The fee for the completion of the Project will be determined based upon the scope
of services identified in “Exhibit A” above plus actual Out of Pocket Expenses incurred by
Consultant as defined below.
2. Payment Timing. Project costs shall be paid out monthly per 3(c) of the Agreement until paid in
full.
3. Out of Pocket Expense. Actual Out of Pocket Expenses will consist of actual costs incurred by
Consultant for printing, delivery, travel, and any other similar expenses required to provide the above
Scope of Services. Such expenses shall be billed monthly to the Client at the direct and actual cost to
Consultant.
4. Additional Requests for Services. Consultant agrees to provide services beyond the Scope of
Services within this Agreement at an hourly rate of $125/Hour plus Out of Pocket Expenses
identified herein.
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Amend Section 78-31 of the Paducah Code of Ordinances to Designate Juneteenth National
Independence Day as a Holiday for City Employees - M SMOLEN
Category: Ordinance
Staff Work By: Michelle Smolen, James Arndt
Presentation By: Michelle Smolen
Background Information:
The City wants to be a community leader in diversity, equity and inclusion. Juneteenth National Independence
Day commemorates the end of slavery in the United States and was designated a federal holiday as of June 17,
2021. The City Manager’s Office is recommending to amend Section 78-31 Holidays to include Juneteenth as a
designated holiday for all City employees to become effective starting on January 1, 2022. This holiday shall also
be available to those employees covered under collective bargaining agreements. This action also aligns with the
City's Minority Inclusion action item in the Commission Priorities.
Does this Agenda Action Item align with a Commission Priority? No
If yes, please list the Commission Priority: Minority Inclusion - Intentional minority inclusions in City
employment, Committees and Boards
Communications Plan:
Funds Available:Account Name:
Account Number:
Staff Recommendation: Amend Section 78-31 of the Paducah Code of Ordinances to Designate Juneteenth
National Independence Day as a holiday for City employees
Attachments:
1.ORD - 78-31 Holidays - Juneteenth
ORDINANCE NO. 2021-____-________
AN ORDINANCE AMENDING CHAPTER 78
OF THE CODE OF ORDINANCES OF THE CITY OF PADUCAH
WHEREAS, the City of Paducah values the employees and staff members of the City of
Paducah; and
WHEREAS, the City of Paducah wishes to recruit and retain quality employees by
offering competitive benefits; and
WHEREAS, Juneteenth was designated a federal holiday as of June 17, 2021; and
WHEREAS, the City of Paducah now wishes to amend Chapter 78 of the Code of
Ordinances of the City of Paducah, to include Juneteenth as a designated holiday for City
employees, effective January 1, 2022.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY OF PADUCAH,
KENTUCKY:
SECTION 1. That the City of Paducah, Kentucky, hereby amends Chapter 78 of the
Paducah Code of Ordinances as follows:
Sec. 78-31. Holidays.
(a) The following days during each calendar year are hereby designated as holidays on which
all City employees will be granted a holiday:
(1) New Year's Eve Day;
(2) New Year's Day (January 1);
(3) Martin Luther King, Jr. Day;
(4) Memorial Day;
(5) Juneteenth National Independence Day
(5)(6) Independence Day (July 4);
(6) (7) Labor Day;
(7) (8) Thanksgiving Day;
(8) (9) The day immediately following Thanksgiving Day;
(9) (10) Christmas Eve (December 24);
(10) (11) Christmas Day (December 25);
(11) (12) One personal day;
and other holidays as may from time to time be designated by motion of the Board of
Commissioners. If any of the days mentioned herein as holidays fall on a Saturday or Sunday, in
such event, such holiday shall be recognized on a day, Monday through Friday, as determined by
the City Commission.
(b) As soon as possible after any holiday, the Police and Fire Department personnel shall be
granted a leave of one (1) day to be selected by the respective head of the Police
Department and Fire Department.
(c) All other employees will be paid for recognized holidays not worked in an amount
equivalent to eight (8) times the employee's regular hourly rate or the equivalent of one (1)
day's pay. Such other employees who are required to work on a recognized holiday shall be
further compensated at one and one-half (1 ½) times their straight time hourly rate.
Members of the Police Department will receive double compensatory time for actual
holidays worked.
(d) Members of the Fire Department working as a member of a platoon performing duty in
shifts of twenty-four (24) hours on duty and forty-eight (48) hours off duty shall be given
holiday time as may be scheduled with the Chief of the Fire Department with a credit of two
(2) holidays per twenty-four (24) hour shift, and they shall be compensated for such holiday
at their average earnings including regular and overtime pay for a fifty-six (56) hour work
week.
(e) Holiday pay for employees of 911 Emergency Communication Service.
(1) For the purpose of this subsection, a qualifying quarter of service shall be a quarter in
which a part-time employee of the Emergency Communication Service is paid for a
minimum average of thirty (30) hours of work per week.
(2) All full-time employees of the 911 Emergency Communication Service shall be
entitled to holiday pay in accordance with this section.
(3) After completion of one (1) year of service with the Emergency Communication
Service, part-time employees shall be granted holiday benefits and pay in accordance
with this section for each qualifying quarter of service. For determining an employee's
eligibility for holiday benefits and pay, reference shall be made to the quarter
preceding the holiday in question. If the employee did not complete a qualifying
quarter of service during the preceding quarter, the employee shall not be eligible for
holiday benefits and pay for which the employee would otherwise be entitled.
(4) Notwithstanding the foregoing provisions of this subsection, no part-time employee of
the Emergency Communication Service shall be entitled to accrue holiday benefits
until such employee has completed one (1) year of service.
SECTION 2. Recognition of Juneteenth as a designated holiday of the City of Paducah
shall become effective January 1, 2022.
SECTION 3. This Ordinance shall be read on two separate days and become effective
upon summary publication pursuant to KRS Chapter 424.
George Bray, Mayor
ATTEST:
Lindsay Parish, City Clerk
Introduced by the Board of Commissioners, July 13, 2021
Adopted by the Board of Commissioners, July 27, 2021
Recorded by Lindsay Parish, City Clerk, July 27, 2021
Published by The Paducah Sun, _________________________
ORD\78-31 – Juneteenth Holiday
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Change Order for Pump Station #2 Construction Contract with Pace Contracting, LLC in the
amount of $121,733.29. - R MURPHY
Category: Ordinance
Staff Work By: Melanie Townsend
Presentation By: Rick Murphy
Background Information: Summary: Change Order #1 to Pace Contracting, LLC construction contract in
the amount of $121,733.29 due to unforeseen conditions resulting in a final contract amount of $4,621,733.29.
Background: As part of the Paducah Floodwall Rehabilitation Project in conjunction with the US Army Corps
of Engineers, Ordinance 2020-08-8652 was approved on August 25, 2020 with Pace Contracting, LLC for a
construction contract in the amount of $4.5M for the Pump Station #2 Rehabilitation Project. This was a rebid
of the contract after the original contractor defaulted on the contract. Pace has experienced several unforeseen
circumstances resulting in additional costs to them.
The unforeseen conditions consisted of:
Proposal #6: Missing Components and Damaged Materials
The new discharge piping and couplings for the project were purchased and provided by the previous
contractor, Huffman Construction LLC. Upon award of The Project rebid, Pace determined that some of the
couplings were damaged and several components were missing. To facilitate installation of
the discharge piping these elements had to replaced. Cost: $88,929.66
Proposal #7: Fabrication of Motor #5 Adjustment Nut
The previous contractor, Huffman Construction LLC, removed and stored Motor #5 to allow for removal of
Pump #5. Upon award of The Project rebid, Pace determined the adjustment nut for Motor #5 was missing. To
facilitate re-installation of the motor a new adjustment nut had to be fabricated. Cost: $10,970.00
Proposal #8: Emergency Repairs of 48in Discharge Pipe
The 48” discharge piping associated with Pump #5 failed during operations. This hole in the pipe that created
associated erosion of soil and rock under the headwall. To prevent additional damage to the levee and headwall
and to allow for future pumping operations Pace was asked to construct a temporary patch of this pipe. Cost:
$21,833.63
HDR Engineering recommends that the City seek reimbursement for this Change Order No 1 from Western
Surety Company, the issuer of the Performance and Payment Bonds (Bond No. 30032288) for Huffman
Construction LLC (Huffman). Proposal #6 and Proposal #7 are both costs directly associated with Huffman’s
mismanagement of components on the job site, which resulted in lost and or damaged materials. It can also be
reasonably inferred that Proposal #8 would not have occurred if Huffman would have met their contractual date
of completion November 30, 2020. These pipes were due to be replaced under their contract. The pipe failure
did not occur until April 19, 2021 well after their expected date of completion.
The total change order amount is $121,733.29 resulting in a final contract amount of $4,621,733.29.
The Pump Station #2 Rehabilitation Project is part of the larger US Army Corps of Engineers' Paducah Local
Flood Protection Project (LFPP) System rehabilitation project. This approximately $36M project involves the
rehabilitation of all pump stations, discharge pipes, flap gates and other structures associated with the Paducah
Local Flood Protection Project (LFPP) System.
The federal government is a 65% partner with the City contributing 35% to the total overall cost of the project.
The Pump Station #2 Rehabilitation Project is part of the City's in-kind match and counts toward the 35%
project portion
Does this Agenda Action Item align with a Commission Priority? No
If yes, please list the Commission Priority: Commission Priorities List
Communications Plan: Coordinate with the Communications Manager for press releases and
social media posts.
Funds Available:Account Name: Pump Station #2
Account Number: FW0014
Staff Recommendation: Authorize and direct the Mayor to sign Change Order #1 with Pace Contracting,
LLC for the construction contract on Pump Station #2 Rehabilitation Project in the amount of $121,733.29 with
a final contract amount of $4,621,733.29
Attachments:
1.ORD CHGORD1- Pace Contracting LLC – Pump Station #2
2.FPS2_CO1_Recommendation
3.Paducah FPS 2 _CO 1_Pace
ORDINANCE NO. 2021-07-_______
AN ORDINANCE AUTHORIZING AND DIRECTING THE MAYOR TO
EXECUTE CHANGE ORDER NO. 1 WITH PACE CONTRACTING LLC. TO INCREASE
THE CONTRACT BY $121,733.29 FOR THE PUMP STATION #2 REHABILITATION
PROJECT
WHEREAS, On August 25, 2020, the City approved Ordinance 2020-08-8652,
authorizing a professional services contract with Pace Contracting, LLC for a construction
contract in the amount of $4,500,000 for the Pump Station #2 Rehabilitation Project; and
WHEREAS, unforeseen circumstances including missing components, damaged
materials, fabrication of Motor #5 adjustment nut, and emergency repairs of the 48” discharge
pipe have resulted in additional costs to Pace Contracting; and
WHEREAS, Change Order No. 1 is required for an increase in the amount of
$121,733.29 adjusting the total construction project from $4,500,000 to $4,621,733.29.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY OF PADUCAH,
KENTUCKY:
SECTION 1. The Mayor is hereby authorized to execute Change Order No. 1
with Pace Contracting, LLC for an increase in the amount of $121,733.29 and a new total
contract cost of $4,621,733.29.
SECTION 2. This expenditure shall be charged to the Pump Station #2 Project
Account FW0014.
SECTION 3. This ordinance shall be read on two separate days and will become
effective upon summary publication pursuant to KRS Chapter 424.
_______________________________________
George Bray, Mayor
ATTEST:
______________________________________
Lindsay Parish, City Clerk
Introduced by the Board of Commissioners July 13, 2021
Adopted by the Board of Commissioners, ________________
Recorded by Lindsay Parish, City Clerk, _________________
Published by The Paducah Sun, ______________
\ord\eng\CHGORD1- Pace Contracting LLC – Pump Station #2
hdrinc.com
120 Brentwood Commons Way, Suite 525
Brentwood, TN 37027
T 502.909.3234 F 502.909.3235
July 2, 2021
Rick Murphy, P.E.
City of Paducah
300 South 5th Street
Paducah, KY 42003
RE: Flood Pump Station #2 Rehabilitation – Change Order #1
Dear Mr. Murphy:
Pace Contracting, LLC (Pace) has experienced several unforeseen conditions during the
construction of the Flood Pump Station #2 Rehabilitation Project (The Project). These
changes have resulted in additional compensation due to Pace. The following are the
Change Proposal Request descriptions and corresponding costs:
Change Proposal Request #6 (CPR6) – Missing Pipe and Damaged Materials $88,929.66
The new discharge piping and couplings for the project were purchased and
provided by the previous contractor, Huffman Construction LLC. Upon
award of The Project rebid Pace, determined that some of the couplings were
damaged and several components were missing. To facilitate installation of
the discharge piping these elements had to replaced.
Change Proposal Request #7 (CPR7) – Fabrication of Motor #5 Adjustment Nut $10,970.00
The previous contractor, Huffman Construction LLC, removed and stored
Motor #5 to allow for removal of Pump #5. Upon award of The Project rebid,
Pace determined the adjustment nut for Motor #5 was missing. To facilitate
re-installation of the motor a new adjustment nut had to be fabricated.
Change Proposal Request #8 (CPR8) – Emergency Repair of 48” Discharge Pipe $21,833.63
The 48” discharge piping associated with Pump #5 failed during operations.
This hole in the pipe that created associated erosion of soil and rock under the
headwall. To prevent additional damage to the levee and headwall and to
allow for future pumping operations Pace was asked to construct a temporary
patch of this pipe.
Recommendation
HDR has reviewed the costs provided by Pace for the referenced CPRs and agree with the
supported cost breakdowns. It is recommended that the City move forward with inclusion
hdrinc.com
120 Brentwood Commons Way, Suite 525
Brentwood, TN 37027
T 502.909.3234 F 502.909.3235
of CPR 6, CPR 7, and CPR 8 into Change Order #1 for an increase of $121,733.29 and a
new total contract amount of $4,621,733.29.
Additionally, it is recommended that the City seeks reimbursement for these CPRs from
Western Surety Company, the issuer of the Performance and Payment Bonds (Bond No.
30032288) for Huffman Construction LLC (Huffman). CPR 6 and CPR 7 are both costs
directly associated with Huffman’s mismanagement of components on the job site, which
resulted in lost and or damaged materials. It can also be reasonably inferred that CPR 8
would not have occurred if Huffman would have met their contractual date of completion
November 30, 2020. These pipes were due to be replaced under their contract. The pipe
failure did not occur until April 19, 2021 well after their expected date of completion.
Please let me know if you have any questions comments or need additional information.
Sincerely,
Kyle Guthrie, P.E.
Associate Vice President
Cc: Melanie Townsend
Sheryl Chino
Savannah Wing
Attachments: Paducah FPS_2_CO_1_Pace.pdf
EJCDC®C 941,Change Order.
Prepared and published 2013 by the Engineers Joint Contract Documents Committee.
Page 1 of 1
Change Order No.1
Date of Issuance: Effective Date:
Owner:City of Paducah Owner's Contract No.:CDBG No.17 020
Contractor:Pace Contracting LLC Contractor’s Project No.:17 020
Engineer:HDR Engineering,Inc Engineer's Project No.:10032833
Project:Flood Pump Station #2 Rehab Contract Name:Paducah PS #2 Rehab
The Contract is modified as follows upon execution of this Change Order:
Description:
Pipe Missing and Damaged Materials
New Adjustment Nut
Emergency 48”Repair
Attachments:HDR Change Order Recommendation
CPR #6,CPR #7,&CPR #8
CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES
[note changes in Milestones if applicable]
Original Contract Price:Original Contract Times:
Substantial Completion:
$ 4,500,000.00 Ready for Final Payment:
days or dates
Increase from previously approved Change Orders No.__
to No.:
[Increase][Decrease]from previously approved Change
Orders No.to No.:
Substantial Completion:
$ 0 Ready for Final Payment:
days
Contract Price prior to this Change Order:Contract Times prior to this Change Order:
Substantial Completion:
$ 4,500,000.00 Ready for Final Payment:
days or dates
Increase of this Change Order:[Increase][Decrease]of this Change Order:
Substantial Completion:
$ 121,733.29 Ready for Final Payment:
days or dates
Contract Price incorporating this Change Order:Contract Times with all approved Change Orders:
Substantial Completion:
$4,621,733.29 Ready for Final Payment:
days or dates
RECOMMENDED:ACCEPTED:ACCEPTED:
By:By:By:
Engineer (if required)Owner (Authorized Signature)Contractor (Authorized Signature)
Title:Title:Title:
Date:Date:Date:
Approved by Funding Agency (if applicable)
By: Date:
Title:
Attention:
The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change.
1) A breakdown of cost SHALL be provided upon request by the Owner or Engineer.
2) Work shall not commence until authorized by the Owner.
Description of Proposed Change :
By
File Attachments:
COR 006.pdf
7KHH[LVWLQJSLSLQJRQVLWHZDVPLVVLQJFRPSRQHQWVDQGVRPHVHJPHQWVZHUHGDPDJHG3DFHKDVSURYLGHGDEUHDNGRZQRIWKHFRVWWR
replace and repair the necessary materials.
By:
Date
Owner's Action:
[ ] Accepted [ ] Not Accepted
General Contractor
Date
By: Owner
Date
$88,929.66
This change will: [ ] Add [ ] Deduct [ ] Not Change
by calendar days.Engineering
All work shall be in accordance with the terms, stipulations, and conditions of the
original Contract Documents. If the work herein provided for is Approved by Change
Order, the time of completion will be:
[ ] Increased [ ] Decreased [ ] Unchanged
HDR Recommendation:
[ ] Recommend Acceptance
[ ] Do Not Recommend Acceptance
Section No.:Drawing No.:
HDR Project Tracker Collaboration System
Page:1 of 1
Change Proposal Request No:6
(Not a Change Order)
Project Name:
HDR Project No:
10032833-4.0
Contractor:
Pace Contracting LLC
Project Owner:
City of Paducah
Owner's Project No. (If applicable):
Regulatory Agency Project No. (If applicable):
Initiated by
[ ] Engineer [ ] CM/Contractor
Date:
2/8/2021
Flood Pump Station #2 Rehabilitation
7/1/21
15415 Shelbyville Rd,
Louisville, KY 40245
502.386.8997 (cell)
502.815.4145 (office)
Date:
Pace Job No.
Qty Unit Ext. Price + Days
1 LS $ 88,929.66 0
0
0
0
0
$ 88,929.66 0
Comments:
Date: Date:
J.D. Fiske
Sr. Project Manager
jdfiske@pacecontractingllc.com
(502) 471-1121
February 8th, 2021
Project Name:
Total Change Order:
Request No.
Kyle Guthrie, PE
HDR Inc.
Replacement Parts & Hardware
Description:
Printed Name:
PACE CONTRACTING, LLC
CLIENT CHANGE ORDER REQUEST
2/8/2012
5495
1
4645 Village Square Drive, Suite F
Paducah, KY 42001
Signature Signature
This COR includes the following: Missing and damaged materials from a time between Huffman's demobilization and PACE's
mobilization. Replacement gaskets for Straub couplings that were damaged due to weather exposure.
Paducah FPS #2 Rehabilitation
Pace Project #5495
Date 2/8/2012
Project Name
Description
Request #1
MATERIALS
QUANTITY UNIT UNIT PRICE COST
1 LS 4,697.25$ 4,697.25$
1 LS 8,764.61$ 8,764.61$
1 LS 51,814.27$ 51,814.27$
1 LS 6,641.84$ 6,641.84$
-$
-$
Sub 71,917.97$
6.00%4,315.08$
76,233.05$
LABOR
QUANTITY UNIT UNIT PRICE COST
-$
-$
EQUIPMENT
QUANTITY UNIT UNIT PRICE COST
-$
-$
SUBCONTRACTS
QUANTITY UNIT UNIT PRICE COST
-$
-$
%
1.00%
5.00%
10.00%
AMOUNT
76,233.05$
-$
-$
-$
76,233.05$
3,811.65$
80,044.70$
8,004.47$
88,049.17$
880.49$
88,929.66$
88,929.66$
Comments:
SUBCONTRACTORS
TOTAL
OVERHEAD
SUBTOTAL 1
FEE
SUBTOTAL 1
Bond Fee (1%)
SUBTOTAL 1
DIRECT COST SUBTOTAL
LABOR
EQUIPMENT
SUBCONTRACTS TOTAL
FEE SUMMARY
DESCRIPTION
Bond Fee
OVERHEAD %
Change Order Request Cost Breakdown
Paducah FPS #2 Rehabilitation
Replacement Coupling, Straub Gaskets, Smith-Blair Gaskets & Hardware, Tie-Rod Hardware
ITEM
48" Straub Coupling ( replacement for damaged )
MATERIALS
FEE %
SUMMARY
ITEM
ITEM
EQUIPMENT TOTAL
ITEM
Replacement Coupling Gaskets
Replacement Coupling Gaskets - Smith Blair
LABOR TOTAL
Tax
MATERIAL TOTAL
Replacement Tie-Rod Hardware
Attention:
The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change.
1) A breakdown of cost SHALL be provided upon request by the Owner or Engineer.
2) Work shall not commence until authorized by the Owner.
Description of Proposed Change :
By
File Attachments:
COR 5495 - 005 Nut Removal Machining.pdf
To fabricate a new adjustment nut for Motor #5, Pace will need to remove Motor #3, this motor is identical to #5 and houses the
VDPHDGMXVWPHQWQXW7KHVFRSHRIZRUNLQYROYHVGLVFRQQHFWLQJWKHHOHFWULFDOIHHGWR0RWRUUHPRYDORIWKHPRWRUWDNLQJPHDVXUHPHQWVRI
WKHDGMXVWPHQWQXWIDEULFDWLRQRIDQLGHQWLFDOFRPSRQHQWDQGUHLQVWDOOLQJWKHPRWRUDQGDVVRFLDWHGHOHFWULFDOIHHG
By:
Date
Owner's Action:
[ ] Accepted [ ] Not Accepted
General Contractor
Date
By: Owner
Date
$10,970.00
This change will: [ ] Add [ ] Deduct [ ] Not Change
by calendar days.Engineering
All work shall be in accordance with the terms, stipulations, and conditions of the
original Contract Documents. If the work herein provided for is Approved by Change
Order, the time of completion will be:
[ ] Increased [ ] Decreased [ ] Unchanged
HDR Recommendation:
[ ] Recommend Acceptance
[ ] Do Not Recommend Acceptance
Section No.:Drawing No.:
HDR Project Tracker Collaboration System
Page:1 of 1
Change Proposal Request No:7
(Not a Change Order)
Project Name:
HDR Project No:
10032833-4.0
Contractor:
Pace Contracting LLC
Project Owner:
City of Paducah
Owner's Project No. (If applicable):
Regulatory Agency Project No. (If applicable):
Initiated by
[ ] Engineer [ ] CM/Contractor
Date:
2/1/2021
Flood Pump Station #2 Rehabilitation
7/1/21
15415 Shelbyville Rd,
Louisville, KY 40245
502.471.11217 (cell)
502.736.6267 (office)
Date:
Pace Job No.
Contract No.
Request No.
Project Name: Paducah FPS #2 Rehabilitation
+ Days
0
0 Days
Comments:
Accepted by:
Cost
Printed Name: Mike Mulhall
$ 10,970.70
10,970.70$
COR 5495- 005
Signature Signature
Date: 4.20.2021 Date:
Total Change Order Request:
Change in Contract Calendar Days:
CLIENT CHANGE ORDER REQUEST
4/22/2021
5495
4645 Village Square Drive, Suite F
Paducah, KY 42001
Kyle Guthrie, PE
HDR Inc.
Printed Name:
PACE CONTRACTING, LLC
Description:
Price for S & K to remove nut on Pump 5 Motor and have it
machined for replacement nut for 500 HP motor.
Pace Project #5495
Date 4/22/2021
Project Name
Description
Request # 5
MATERIALS
QUANTITY UNIT UNIT PRICE COST
-$
-$
-$
6.00%-$
-$
LABOR
QUANTITY UNIT UNIT PRICE COST
-$
-$
-$
EQUIPMENT
QUANTITY UNIT UNIT PRICE COST
-$
-$
SUBCONTRACTS
QUANTITY UNIT UNIT PRICE COST
1 ls 9,457.50$ 9,457.50$
-$
-$
-$
-$
9,457.50$
%
1.00%
5.00%
10.00%
AMOUNT
-$
-$
-$
9,457.50$
9,457.50$
1,513.20$
10,970.70$
10,970.70$
Comments
LABOR TOTAL
Tax
MATERIAL TOTAL
EQUIPMENT TOTAL
ITEM
S & K cost to remove and make nut replacement
Change Order Request Cost Breakdown
Paducah FPS #2 Rehabilitation
Price for S & K to remove nut on Pump 5 Motor and have it machined for replacement nut for
500 HP motor.
ITEM
MATERIALS
FEE %
SUMMARY
ITEM
ITEM
LABOR
EQUIPMENT
SUBCONTRACTS TOTAL
FEE SUMMARY
DESCRIPTION
Bond Fee
OVERHEAD %
SUBCONTRACTORS
TOTAL
Overhead & FEE & Bond
SUBTOTAL 1
DIRECT COST SUBTOTAL
Paducah Levee System Reconstruction
Flood Station # 2
Paducah, KY
PRICE f. o. b. S. P. Freight Allowed ………….……….…..….…….…............…….. $ 9,457.50
S & K EQUIPMENT COMPANY, Inc.
… When Quality Counts …
Attention:
The following change in the contract on this project is proposed. Please provide your proposed price for the cost of this change.
1) A breakdown of cost SHALL be provided upon request by the Owner or Engineer.
2) Work shall not commence until authorized by the Owner.
Description of Proposed Change :
By
File Attachments:
COR 5495 - 006 48 inch Discharge Pipe Repair.pdf
20210416_090439.jpg
20210416_091044.jpg
20210416_091401.jpg
20210416_091647.jpg
masterlife-sra-035-tds.pdf
80-3 flowable pace contr. pump 2.xls
3URYLGHDPHDQVWRVHDOWKHKROHLQWKHH[LVWLQJGLVFKDUJHSLSHDQGEDFNILOOWKHYRLGFUHDWHGIURPZDVKRXW
Section No.:Drawing No.:
HDR Project Tracker Collaboration System
Page:1 of 2
Change Proposal Request No:8
(Not a Change Order)
Project Name:
HDR Project No:
10032833-4.0
Contractor:
Pace Contracting LLC
Project Owner:
City of Paducah
Owner's Project No. (If applicable):
Regulatory Agency Project No. (If applicable):
Initiated by
[ ] Engineer [ ] CM/Contractor
Date:
4/16/2021
Flood Pump Station #2 Rehabilitation
By:
Date
Owner's Action:
[ ] Accepted [ ] Not Accepted
General Contractor
Date
By: Owner
Date
$21,833.63
This change will: [ ] Add [ ] Deduct [ ] Not Change
by calendar days.Engineering
All work shall be in accordance with the terms, stipulations, and conditions of the
original Contract Documents. If the work herein provided for is Approved by Change
Order, the time of completion will be:
[ ] Increased [ ] Decreased [ ] Unchanged
HDR Recommendation:
[ ] Recommend Acceptance
[ ] Do Not Recommend Acceptance
HDR Project Tracker Collaboration System
Page:2 of 2
Change Proposal Request No:8
(Not a Change Order)
Project Name:
HDR Project No:
10032833-4.0
Contractor:
Pace Contracting LLC
Project Owner:
City of Paducah
Owner's Project No. (If applicable):
Regulatory Agency Project No. (If applicable):
Initiated by
[ ] Engineer [ ] CM/Contractor
Date:
4/16/2021
Flood Pump Station #2 Rehabilitation
7/1/21
15415 Shelbyville Rd,
Louisville, KY 40245
502.471.11217 (cell)
502.736.6267 (office)
Date:
Pace Job No.
Contract No.
Request No.
Project Name: Paducah FPS #2 Rehabilitation
+ Days
0
0 Days
Comments:
Accepted by:
Cost
Printed Name: Mike Mulhall
$ 21,833.63
21,833.63$
COR 5495- 006
Signature Signature
4/28/2021 Date:
Total Change Order Request:
Change in Contract Calendar Days:
CLIENT CHANGE ORDER REQUEST
4/28/2021
5495
4645 Village Square Drive, Suite F
Paducah, KY 42001
Kyle Guthrie, PE
HDR Inc.
Printed Name:
PACE CONTRACTING, LLC
Description:
T & M work to repair 48 inch Steel Discharge Pipe and use
flowable fill in washout 4/21/21 to 4/23/21
Pace Project #5495
Date 4/28/2021
Project Name
Description
Request # 6
MATERIALS
QUANTITY UNIT UNIT PRICE COST
48 cy 125.00$ 6,000.00$
1 ls 400.00$ 400.00$
-$
6.00%360.00$
6,760.00$
LABOR
QUANTITY UNIT UNIT PRICE COST
33 hr 60.00$ 1,980.00$
66 hr 55.00$ 3,630.00$
9 day 100.00$ 900.00$
6,510.00$
EQUIPMENT
QUANTITY UNIT UNIT PRICE COST
1 day 579.61$ 579.61$
1 day 2,138.55$ 2,138.55$
33 hr 16.00$ 528.00$
3,246.16$
SUBCONTRACTS
QUANTITY UNIT UNIT PRICE COST
1 ls 2,200.25$ 2,200.25$
-$
-$
2,200.25$
%
1.00%
5.00%
10.00%
AMOUNT
6,760.00$
6,510.00$
3,246.16$
2,200.25$
18,716.41$
935.82$
19,652.23$
1,965.22$
21,617.45$
216.17$
21,833.63$
21,833.63$
Comments
Misc. Material to line pipe
Foreman Truck
LABOR TOTAL
Tax
MATERIAL TOTAL
Skidsteer
Excavator
Travel Pay
EQUIPMENT TOTAL
ITEM
Foreman
Whitehead Concrete Pumping
Carpenter (2 each)
Change Order Request Cost Breakdown
Paducah FPS #2 Rehabilitation
T & M work to repair 48 inch Steel Discharge Pipe and use flowable fill in washout 4/21/21 to
4/23/21
ITEM
Concrete - Flowable Fill
MATERIALS
FEE %
SUMMARY
ITEM
ITEM
LABOR
EQUIPMENT
SUBCONTRACTS TOTAL
FEE SUMMARY
DESCRIPTION
Bond Fee
OVERHEAD %
SUBCONTRACTORS
TOTAL
OVERHEAD
SUBTOTAL 1
FEE
SUBTOTAL 1
Bond Fee (1%)
SUBTOTAL 1
DIRECT COST SUBTOTAL
INVOICE
SEND ALL PAYMENTS TO: INVOICE NUMBER
ACCOUNT NUMBER
INVOICE DATE
INVOICE TO
RECEIVED BY CONTRACT NUMBER
PURCHASE ORDER NUMBER
JOB NUMBER
JOB ADDRESS
BRANCH
SUBTOTAL
TAX
INVOICE TOTAL
PAGE
PDFWS7 (Rev 05/10/18)
112664950-0001
PO BOX 409211
ATLANTA, GA 30384-9211
231813
4/26/21
1
NPOG
FSP 2
1416 N 6TH ST
PADUCAH, KY 42001
C#: 812-283-5784 J#: 502-471-1121
1416 N 6TH ST, PADUCAH
FSP 2
112664950
PADUCAH PC617
3525 PARK AVE
PADUCAH, KY 42001 4054
270-558-6206
0617
PACE CONTRACTING INC
15415 Shelbyville Rd
Louisville, KY 40245
. QTY EQUIPMENT # Min Day Week 4 Week Amount
.
1.00 1500-2100LB TRACK SKIDSTEER 325.00 325.00 876.00 1901.00 325.00
10299596 Make: BOBCAT Model: T550 Ser #: AJZV24640
HR OUT: 124.550 HR IN: 128.050 TOTAL: 3.500
Billed from 4/22/21 thru 4/23/21
1.00 SKIDSTEER LOADER BUCKET N/C
Rental Sub-total: 325.00
SALES ITEMS:
Qty Item number Unit Price
1 DLPKSRCHG EA 26.600 26.60
TRANSPORTATION SURCHARGE
1 ENVIRONMENTAL EA 5.200 5.20
ENVIRONMENTAL/HAZMAT FEE 2133XXX0000
1 RF EA N/C
RETURNED FULL
DELIVERY CHARGE 95.00
PICKUP CHARGE 95.00
CONTINUED
RENTAL RETURN NET DUE UPON RECEIPT
MULHALL, MIKE
SUNBELT RENTALS, INC
INVOICE
SEND ALL PAYMENTS TO: INVOICE NUMBER
ACCOUNT NUMBER
INVOICE DATE
INVOICE TO
RECEIVED BY CONTRACT NUMBER
PURCHASE ORDER NUMBER
JOB NUMBER
JOB ADDRESS
BRANCH
SUBTOTAL
TAX
INVOICE TOTAL
PAGE
PDFWS7 (Rev 05/10/18)
112664950-0001
PO BOX 409211
ATLANTA, GA 30384-9211
231813
4/26/21
2
NPOG
FSP 2
1416 N 6TH ST
PADUCAH, KY 42001
C#: 812-283-5784 J#: 502-471-1121
1416 N 6TH ST, PADUCAH
FSP 2
112664950
PADUCAH PC617
3525 PARK AVE
PADUCAH, KY 42001 4054
270-558-6206
0617
546.80
32.81
579.61
PACE CONTRACTING INC
15415 Shelbyville Rd
Louisville, KY 40245
. QTY EQUIPMENT # Min Day Week 4 Week Amount
.
FINAL BILL: 4/22/21 12:00 PM THRU 4/23/21 09:13 AM.
. 546.80
RENTAL RETURN NET DUE UPON RECEIPT
MULHALL, MIKE
SUNBELT RENTALS, INC
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Approval of Contract for Floodwall Seal Closures Project with Jim Smith Contracting, LLC in
the amount of $577,763.16 - R MURPHY
Category: Ordinance
Staff Work By: Melanie Townsend, Maegan Mansfield
Presentation By: Rick Murphy
Background Information: Summary: Approval of contract with Jim Smith Contracting to modify 12
Floodwall openings. The modifications include permanently sealing 10 Floodwall openings and raising the sill
elevation of 2 Floodwall openings
Background: On June 15, 2021, the Engineering Department opened sealed bids for the Paducah Floodwall
Seal Closure Project. BFW Engineering performed bid evaluation and recommended Jim Smith Contracting as
submitting the lowest responsive bid. Two (2) bids were received as follows:
(1) Jim Smith Contracting, LLC: $577,763.16
(2) Coffey Construction, LLC: $672,276.73
The Floodwall Seal Closure Project is part of the larger US Army Corps of Engineers' Paducah Local Flood
Protection Project (LFPP) System rehabilitation project. This approximately $36M project involves the
rehabilitation of all pump stations, discharge pipes, flap gates and other structures associated with the Paducah
Local Flood Protection Project (LFPP) System.
The federal government is a 65% partner with the City contributing 35% to the total overall cost of the project.
The Floodwall Seal Closure Project is part of the City's in-kind match and counts toward the 35% project
portion.
Does this Agenda Action Item align with a Commission Priority? Yes
If yes, please list the Commission Priority: Stormwater
Communications Plan: The Engineering Department has and will continue to discuss the Seal
Closures project with those businesses near or adjacent to the closure locations that may be
inconvenienced before, during and/or after the project's completion. The Engineering
Department will also coordinate necessary information with the City of Paducah's
Communication Manager for news releases and social media updates.
Funds Available:Account Name: Seal Closures
Account Number: FW0011
Staff Recommendation: To receive and file the bids and adopt an Ordinance authorizing the Mayor to
execute a contract with Jim Smith Contracting, LLC, in the amount of $ 577,763.16 for construction of the
Paducah Floodwall Seal Closure Project.
Attachments:
1.ORD agree - Jim Smith Contracting Floodwall Seal Closure Project 2021
2.Paducah Sun ad_5.29.21_Seal Closures
3.Paducah Floodwall Closures Bid Tabulation
4.Paducah Floodwall Closures_Smith Construction bid packet
5.Coffey Construction Bid Packet
6.Paducah Floodwall Closure- Contract- unsigned
ORDINANCE NO. 2021-07-_________
AN ORDINANCE AUTHORIZING THE MAYOR TO EXECUTE A
PROFESSIONAL SERVICES AGREEMENT WITH JIM SMITH
CONTRACTING, LLC., IN THE AMOUNT OF $577,763.16 FOR
THE FLOODWALL SEAL CLOSURES PROJECT
WHEREAS, on June 15, 2021, The Engineering Department opened sealed bids
for the Paducah Floodwall Seal Closure Project; and
WHEREAS, BFW Engineering performed bid evaluation and recommended Jim
Smith Contracting as submitting the lowest responsive bids; and
WHEREAS, the Floodwall Seal Closure Project is part of the larger U.S. Army
Corps of Engineers’ Paducah Levee project; and
WHEREAS, this approximately $36M project involves the rehabilitation of all
pump stations, discharge pipes, flap gates and other structures associated with the Paducah Local
Flood Protection Project (LFPP) System.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COMMISSIONERS
OF THE CITY OF PADUCAH, KENTUCKY:
SECTION 1. The City Commission does hereby accept the proposal of Jim Smith
Contracting LLC to provide professional services for the Floodwall Seal Closure Project in an
amount of $577,763.16.
SECTION 2. The City Commission does hereby authorize and instruct the Mayor
to execute the Professional Services Agreement with Jim Smith Contracting LLC, on behalf of
the City of Paducah.
SECTION 3. This expenditure shall be charged to the Seal Closures Project
No. FW0011.
SECTION 4. This ordinance shall be read on two separate days and will become
effective upon summary publication pursuant to KRS Chapter 424.
____________________________________
George Bray, Mayor
ATTEST:
__________________________________
Lindsay Parish, City Clerk
Introduced by the Board of Commissioners, July 13, 2021
Adopted by the Board of Commissioners, ____________________
Recorded by Lindsay Parish, City Clerk, _____________________
Published by The Paducah Sun, _____________________________
\ord\eng\agree – Jim Smith Contracting Floodwall Seal Closures Project - 2021
Paducah Floodwall Closures
Bid Tabulation
6/15/2021
CONTRACTOR BID AMOUNT DEDUCTIVE ALTERNATE
Smith Construction $577,763.16 $4,000
Coffee Construction $672,276.73 $3,965
Differential $94,513.60 $35.00
00500
AGREEMENT
Page 1 of 2
CITY OF PADUCAH, KENTUCKY
ENGINEERING DEPARTMENT
AGREEMENT FOR PADUCAH FLOODWALL CLOSURES
THIS AGREEMENT, made this day of , 20__ by and between the CITY OF
PADUCAH, hereinafter called the OWNER, and , hereinafter called the
CONTRACTOR, for the consideration hereinafter named, agree as follows:
ARTICLE 1. SCOPE OF WORK
The Contractor agrees to furnish all the necessary labor, materials, equipment, tools and services
necessary for the construction of the PADUCAH FLOODWALL CLOSURES. All Work shall be in
accordance with this Agreement, the Plans, Specifications and any Addendum(s) issued.
Throughout the performance of this Contract, the Engineering Department of the City of Paducah
shall, in all respects, be acting as both Engineer and agent for the Owner, City of Paducah. All work done
by the Contractor shall be completed under the general supervision of the Engineer.
ARTICLE 2. TIME FOR COMPLETION AND LIQUIDATED DAMAGES
The Contractor hereby agrees to commence work under this contract on or before a date to be
specified in the Notice to Proceed and to fully complete the project within Ninety (90) consecutive
calendar days thereafter.
Failure of the Contractor to complete the work in the time specified above plus any extensions
allowed in accordance with the General Conditions shall result in the assessment of liquidated damages
for the delay (not as a penalty). Liquidated damages shall be in the amount of $500.00 per consecutive
calendar day for failure to meet the final completion date and shall be withheld from final payment.
ARTICLE 3. THE CONTRACT SUM
The Owner agrees to pay the Contractor for the performance of the Contract, subject to additions
and deductions provided therein:
($) as quoted in the Bid Proposal by the Contractor dated
which shall constitute full compensation for the work and services authorized herein.
ARTICLE 4. PROGRESS PAYMENTS
The Contractor may submit each month, and no more than once a month, a Request for Payment
for work completed in accordance with the Specifications. The Owner will make partial payments on or
about thirty (30) days after submission of a properly completed invoice and approval of the completed
work. At the Engineer’s discretion, a ten percent (10%) retainage may be held until final completion and
acceptance of the work.
ARTICLE 5. ACCEPTANCE AND FINAL PAYMENT
Final payment shall be due sixty, (60) days after substantial completion of the work, provided the
work will then be fully completed and the Contract fully performed in accordance with the specifications.
ARTICLE 6. GOVERNING LAW
The Parties agree that this Agreement and any legal actions concerning its validity, interpretation
and performance shall be governed by the laws of the Commonwealth of Kentucky. The parties further
agree that the venue for any legal proceeding relating to this Agreement shall exclusively be in
00500
AGREEMENT
Page 2 of 2
McCracken County, Kentucky.
ARTICLE 7. THE CONTRACT DOCUMENTS
The Plans, Specifications and any addendum that may have been issued are fully a part of this
Contract as if thereto attached or herein repeated.
IN WITNESS WHEREOF:
The parties hereto have executed this Agreement, the day and year first above written.
CONTRACTOR CITY OF PADUCAH, KENTUCKY
BY __________________________ BY ____________________________
TITLE ________________________ George Bray, Mayor
ADDRESS: ADDRESS:
_____________________________ Post Office Box 2267
______________________________ Paducah, Kentucky 42002-2267
Agenda Action Form
Paducah City Commission
Meeting Date: July 13, 2021
Short Title: Approval of Contract for Floodwall Flapgate Replacement Project with Jim Smith Contracting,
LLC in the amount of $ 2,152,000.00- R MURPHY
Category: Ordinance
Staff Work By: Melanie Townsend, Rick Murphy
Presentation By: Rick Murphy
Background Information: Summary: Approving construction contract with Jim Smith Contracting, LLC for
the replacement of 52 flapgates and sluice gates in the Paducah Local Flood Protection Project (LFPP) System.
Background: On June 24, 2021, the Engineering Department opened sealed bids for the Paducah Floodwall
Flapgate Replacement Project. HDR Engineering performed bid evaluation and recommended Jim Smith
Contracting as submitting the lowest responsive bid. Three (3) bids were received as follows:
(1) ICI Mechanical, LLC: $1,726,495 (rejected as unresponsive)
(2) Jim Smith Contracting, LLC: $2,152,000
(3) CJ Mahan Construction, LLC: $2,700,000
The Floodwall Flapgate Replacement Project is part of the larger US Army Corps of Engineers' Paducah Local
Flood Protection Project (LFPP) System rehabilitation project. This approximately $36M project involves the
rehabilitation of all pump stations, discharge pipes, flapgates and other structures associated with the Paducah
Local Flood Protection Project (LFPP) System.
The federal government is a 65% partner with the City contributing 35% to the total project. The Floodwall
Flapgate Replacement Project is part of the City's in-kind match and counts toward the City's 35% project
portion.
Does this Agenda Action Item align with a Commission Priority? Yes
If yes, please list the Commission Priority: Stormwater
Communications Plan: Coordinate with Communications Manager for press releases and social
media posts.
Funds Available:Account Name: Flapgates
Account Number: FW0010
Staff Recommendation: To receive and file the bids and adopt an Ordinance authorizing the Mayor to
execute a contract with Jim Smith Contracting, LLC, in the amount of $2,100,000 for construction of the
Paducah Floodwall Flapgate Replacement Project.
Attachments:
1.ORD agree – Jim Smith Contracting Flapgate Replacement Project - 2021
2.PaducahFlapGate_Sample Contract
3.Paducah Sun_6.5.21_Flap Gates ad
4.PaducahFlapGate_Addendum01_20210609.
5.PaducahFlapGate_Addendum02_20210621
6.Scan_Bid_CJMahan
7.Scan_Bid_ICI
8.Scan_Bid_JimSmith
ORDINANCE NO. 2021-07-_________
AN ORDINANCE AUTHORIZING THE MAYOR TO EXECUTE A
PROFESSIONAL SERVICES AGREEMENT WITH JIM SMITH
CONTRACTING, LLC., IN THE AMOUNT OF $2,152,000 FOR
THE FLOODWALL FLAPGATE PROJECT
WHEREAS, on June 24, 2021, the Engineering Department opened sealed bids
for the Paducah Floodwall Flapgate Replacement Project; and
WHEREAS, HDR Engineering performed bid evaluation and recommended Jim
Smith Contracting as submitting the lowest responsive bids; and
WHEREAS, the Floodwall Flapgate Replacement Project is part of the larger U.S.
Army Corps of Engineers’ Paducah Local Flood Protection Project (LFPP) System rehabilitation
project; and
WHEREAS, this approximately $36M project involves the rehabilitation of all
pump stations, discharge pipes, flap gates and other structures associated with the Paducah Local
Flood Protection Project (LFPP) System.
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COMMISSIONERS
OF THE CITY OF PADUCAH, KENTUCKY:
SECTION 1. The City Commission does hereby accept the proposal of Jim Smith
Contracting LLC to provide professional services for the Floodwall Flapgate Replacement
Project in an amount of $2,152,000.
SECTION 2. The City Commission does hereby authorize and instruct the Mayor
to execute the Professional Services Agreement with Jim Smith Contracting LLC, on behalf of
the City of Paducah.
SECTION 3. This expenditure shall be charged to the Flapgates Project
No. FW0010.
SECTION 4. This ordinance shall be read on two separate days and will become
effective upon summary publication pursuant to KRS Chapter 424.
____________________________________
George Bray, Mayor
ATTEST:
__________________________________
Lindsay Parish, City Clerk
Introduced by the Board of Commissioners, July 13, 2021
Adopted by the Board of Commissioners, __________________
Recorded by Lindsay Parish, City Clerk, ___________________
Published by The Paducah Sun, ______________________
\ord\eng\agree – Jim Smith Contracting Flapgate Replacement Project - 2021
10278680 City of Paducah 6/21/2021
Flood Protection Flap Gate Replacement
AGREEMENT
00 52 13 - 1
SECTION 00 52 13
CITY OF PADUCAH, KENTUCKY
ENGINEERING DEPARTMENT AGREEMENT FOR FLOOD PROTECTION FLAP GATE
REPLACEMENT PROJECT
THIS AGREEMENT, made this day of , 20__ by and between the CITY OF
PADUCAH, hereinafter called the OWNER, and __________________, hereinafter called the
CONTRACTOR, for the consideration hereinafter named, agree as follows:
ARTICLE 1. SCOPE OF WORK
The Contractor agrees to furnish all of the materials and perform all of the work based upon the
Drawings and Specifications entitled Flood Protection Flap Gate Replacement on the City of Paducah
Flood Wall Protection System prepared by HDR, Inc., acting as, and in these Drawings, entitled the
Engineer; and shall do everything required by this Agreement, the Special Provisions of the Contract, the
Specifications and Drawings and any Addendum(a) issued.
ARTICLE 2. TIME FOR COMPLETION AND LIQUIDATED DAMAGES
The Contractor hereby agrees to commence work under this contract on or before a date to be
specified in the Notice to Proceed and to fully complete the project within Two-Hundred and Ten (210)
consecutive calendar days thereafter.
Failure of the Contractor to complete the work in the time specified above plus any extensions
allowed in accordance with the General Conditions shall result in the assessment of liquidated damages
for the delay (not as a penalty). Liquidated damages shall be in the amount of $500.00 per consecutive
calendar day for failure to meet the final completion date and shall be withheld from final payment.
ARTICLE 3. THE CONTRACT SUM
The Owner agrees to pay the Contractor for the performance of the Contract, subject to additions
and deductions provided therein: ________________________________ ($__________) as quoted in
the Bid Proposal by the Contractor dated ____________ which shall constitute full compensation for the
work and services authorized herein.
ARTICLE 4. PROGRESS PAYMENTS
The Contractor may submit each month, and no more than once a month, a Request for Payment
for work completed in accordance with the Specifications. The Owner will make partial payments on or
about thirty (30) days after submission of a properly completed invoice and approval of the completed
work. At the Engineer’s discretion, a ten percent (10%) retainage may be held until final completion and
acceptance of the work.
ARTICLE 5. ACCEPTANCE AND FINAL PAYMENT
Final payment shall be due sixty, (60) days after substantial completion of the work, provided the
work will then be fully completed and the Contract fully performed in accordance with the specifications.
ARTICLE 6. GOVERNING LAW
The Parties agree that this Agreement and any legal actions concerning its validity, interpretation
and performance shall be governed by the laws of the Commonwealth of Kentucky. The parties further
agree that the venue for any legal proceeding relating to this Agreement shall exclusively be in McCracken
County, Kentucky.
10278680 City of Paducah 6/21/2021
Flood Protection Flap Gate Replacement
AGREEMENT
00 52 13 - 2
ARTICLE 7. THE CONTRACT DOCUMENTS
The Plans, Specifications and any addendum that may have been issued are fully a part of this
Contract as if thereto attached or herein repeated.
IN WITNESS WHEREOF:
The parties hereto have executed this Agreement, the day and year first above written.
CONTRACTOR
CITY OF PADUCAH, KENTUCKY
BY __________________________ BY ____________________________
TITLE ________________________
George P. Bray, Mayor
ADDRESS: ADDRESS:
_____________________________ Post Office Box 2267
______________________________ Paducah, Kentucky 42002-2267
10278680 City of Paducah 6/9/2021
Flood Protection Flap Gate Replacement
CAST IRON SLIDE GATES
40 05 58 - 1
SECTION 40 05 58
CAST IRON SLIDE GATES AND SLIDE GATES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Cast iron slide gates and integral operators.
2. Cast iron flap gates and integral operators.
B. Related Specification Sections include but are not necessarily limited to:
1. Division 00 - Procurement and Contracting Requirements.
2. Division 01 - General Requirements.
1.2 QUALITY ASSURANCE
A. Manufacturer Qualifications:
1. All of the equipment specified under this Section shall be furnished by a single
manufacturer with a minimum of 20 years’ experience designing and manufacturing flap
gates and slide gates.
2. The manufacturer shall have manufactured flap gates and slide gates for a minimum of 100
projects. The specification is based on the cast iron flap gate and slide gate as manufactured
by Waterman Valve, of Exeter, California.
B. Referenced Standards:
1. American Water Works Association (AWWA):
a. C541, Hydraulic and Pneumatic Cylinder and Vane-Type Actuators for Valves and
Slide Gates.
b. C542, Electric Motor Actuators for Valves and Slide Gates.
c. C560, Cast-Iron Slide Gates.
2. National Electrical Manufacturers Association (NEMA):
a. 250, Enclosures for Electrical Equipment (1000 Volts Maximum).
3. National Sanitation Foundation International (NSF):
a. 61, Drinking Water System Components - Health Effects.
4. Society for Protective Coatings/NACE International (SSPC/NACE):
a. SP 10/NACE No. 2, Near-White Blast Cleaning.
5. ASTM International (ASTM):
a. A108 (2003) Steel Bars, Carbon, Cold-Finished
b. A123/A123M (2002) Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
c. A126 Class B, Standards Specification for Gray Iron Castings for Valves, Flanges, and
Pipe Fittings
d. A153/A153M, Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel
Hardware.
e. A194/A 194M (2004a) Carbon and Alloy Steel Nuts for Bolts for High Pressure or
High Temperature Service or Both
f. A276 (2004) Stainless Steel Bars and Shapes
g. A307 (2004) Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength
h. A320/A 320M (2004) Alloy/Steel Bolting Materials for Low-Temperature Service
i. A536 Gr. 65-45-12, Standard Specification for Ductile Iron for Pivot Lugs
j. A 582/A 582M (1995b; R 2000e1) Free-Machining Stainless Steel Bars
k. B21/B 21M (2001e1) Naval Brass Rod, Bar, and Shapes
l. B584 (2004) Copper Alloy Sand Castings for General Applications
m. B633 (1998; E 2001) Electrodeposited Coatings of Zinc on Iron and Steel
n. F594(2002) Stainless Steel Nuts
10278680 City of Paducah 6/9/2021
Flood Protection Flap Gate Replacement
CAST IRON SLIDE GATES
40 05 58 - 2
1.3 SUBMITTALS
A. Submit the following with the Proposal:
1. Proposal Data Sheets.
B. Shop Drawings:
1. See Specification Section 01 33 00 for requirements for the mechanics and administration of
the submittal process.
2. Product technical data including:
a. Acknowledgement that products submitted meet requirements of standards referenced.
b. Flap Gates;
Shop drawings shall be submitted for sluice gates and flap gates showing details for
mounting, materials description, calculations (sluice gates opening and closing torque,
stem buckling strength & pedestal (lift)), gate operating pedestal (lift), concrete
reinforcement, anchorage, dimensions, and construction and manufacturer's installation
procedures. The shop drawings shall show the clearance dimensions between stem
couplings and stem guides and the end of the stem and the top of the stem cover, in
both the open and closed positions of the sluice gates. Manufacturer's catalog data,
including specifications and full descriptive data, shall be submitted for all materials
and equipment furnished. Contractor shall be responsible for verifying that the specific
manufacturers' sluice gates to be provided at the listed location will fit and function in
the area available.
3. Fabrication and/or layout drawings.
4. Certifications.
5. Product technical data including:
a. Acknowledgment that products submitted meet the requirements of standards
referenced.
b. Calculations that demonstrate compliance with the deflection, stress and factor of safety
specified.
c. Certified drawings and material specifications for ALL components.
d. Manufacturer's installation instructions.
e. Test records.
C. Product Data:
1. Acknowledgement that products submitted meet requirements of standards referenced.
2. Manufacturer's installation instructions.
3. Fabrication and/or layout drawings.
4. Certifications.
5. Test reports.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Subject to compliance with the Contract Documents, the following manufacturers are
acceptable:
1. Waterman Valve.
2. Hydro-Gate.
3. Fontaine.
4. Or engineered preapproved equal.
2.2 EQUIPMENT – SLIDE GATES
A. Provide heavy duty gates, stems, lifts and other appurtenances of size, type, material and
construction shown on the Contract Drawings and as specified herein.
B. Slide gates shall be of heavy duty and medium duty type.
C. Gates: Meet all requirements of AWWA C560 as modified per this Specification Section.
10278680 City of Paducah 6/9/2021
Flood Protection Flap Gate Replacement
CAST IRON SLIDE GATES
40 05 58 - 3
D. To ensure quality and consistency, no third party contracted manufacturers for fabrication and
assembly allowed. The manufacturing and assembly facility shall be a United States facility.
E. Cast iron components shall be domestic (United States) materials
F. Leakage rate not to exceed the maximum allowable leakage as stated in the AWWA C560
standard. The gates shall be adjusted at the manufacturing plant so that a 0.002” thick gauge (1/2
the required standard by AWWA) will not be admitted at any point between the frame and cover
seating surfaces.
2.3 EQUIPMENT – FLAP GATES
A. The flap gate shall be designed to allow free outflow and prevent backflow for a maximum
seating head of either 55 feet for F55 or 25 feet for F25.
B. When used for pump discharge, the unit shall be fitted with a Waterman-supplied leaf-spring
bumper with rubber cushion block.
C. To ensure quality and consistency, no third party contracted manufacturers for fabrication and
assembly allowed. The manufacturing and assembly facility shall be a United States facility.
D. Cast iron components shall be domestic (United States) materials
2.4 MATERIALS – FLAP GATES AND SLIDE GATES (REQUIRED MINIMUM)
A. Frame and Cover, Flap Gates and Slide Gates – Cast Iron per ASTM- A-126, Class B.
B. Flap Gate pivot Lug – Ductile Iron per ASTM A-536, Gr. 65-45-12.
C. Flap Gate hinge Link – Structural Steel ASTM A-36, galvanized per ASTM-A-123
D. Flap Gate bronze Bushing and Washers – Commercial Bronze
E. Flap Gate and Slide Gate, assembly Hardware, Fasteners, Anchors, and Hinge Pins – 18-8
Stainless Steel (Type 304)
F. Flap Gate Naval Bronze Seats – ASTM B-21, Alloy 48200
G. Slide Gate Manganese Bronze Seats, Wedges and Stem Blocks – ASTM B584, Alloy 86500
H. Slide Gate bottom close seal Neoprene Seats – ASTM D-2000 BC610/625
I. Slide Gate pedestal Cast Iron per ASTM- A-126, Class B with polyamide epoxy finish.
J. Slide Gate stem ASTM A276 Type 304 stainless steel, machine cut threads 29 degrees ACME
type.
K. Slide Gate stem guides Cast Iron ASTM A-126 Class B with bronze bushings or UHMW
bushings.
L. Slide Gate stem cover clear butyrate with Mylar strip indicator.
OPTIONAL MATERIALS
M. Low-Zinc Bronze Seats – ASTM B-198, Alloy 65100
N. Ductile Iron Hinge Link – ASTM A536, Gr. 65-45-12
O. Manganese Bronze Hinge Link – ASTM B584, Alloy 86500
P. Bronze Bushings – ASTM B-98
Q. Ni-Resist Cast Iron Frame and Cover – ASTM A-436, Type 2 or 2B.
2.5 GATE OPERATORS AND LIFTS
A. General:
1. Provide lifts in accordance with AWWA C560 or as modified in this Specification Section.
10278680 City of Paducah 6/9/2021
Flood Protection Flap Gate Replacement
CAST IRON SLIDE GATES
40 05 58 - 4
2. Rising stem lifts:
a. Provide clear butyrate plastic stem cover with Mylar strip open-close indicator.
B. Manual Operators:
1. Equip lift mechanism with a pedestal as shown on Drawings.
2. Centerline of crank or handwheel: Approximately 36 IN above operating floor, unless
otherwise shown.
3. Crank wheel: Removable and fitted with a corrosion resistant rotating handle.
2.6 FABRICATION
A. Flap Gate frame shall be cast of flatback design, with seating surface inclined from vertical at a
minimum of 2.5 degrees to assure positive closure. For flatback Slide Gates mounted to
thimbles or flanges or concrete wall, the slide gate flange shall be machined and drilled to match.
B. Cover shall be cast iron, cast in one piece, with reinforcing ribs, designed to withstand the
seating head specified. An integral cast on lifting eye shall be provided for manual operation.
All machined surfaces shall have a minimum 63 micro inch finish.
C. Seating surfaces for frame and cover shall be one of the following:
D. Machined iron
E. Flap gate and slide gate bronze seats impacted into dovetail grooves on the frame and cover.
F. Flap gate bronze seats impacted into dovetail grooves within the frame with optional neoprene
seat bonded into a dovetail groove in the cover to cushion the cover upon closing.
G. Slide gate with bronze seats impacted into dovetail grooves in cover. When a flush bottom
closure is specified, a resilient seal shall be attached to the frame so that it is flush with the gate
invert. The flush bottom seal shall be supported by a cast iron or stainless-steel bracket which
shall be bolted to machined pads provided on the frame. The seal shall be held in place by a
bronze or stainless-steel bar which shall be bolted through the seal to the bracket with stainless
steel fasteners. All wedges and wedge blocks shall be of solid corrosion resistant material and
shall be of sufficient number to provide a practical degree of water tightness per AWWA C560.
All wedge bearing surfaces and contact faces shall be machined to give maximum contact and
wedging action. Wedges shall be fully adjustable, but once set shall not rotate or move from the
set position. All wedge fasteners and adjustment screws shall be corrosion resistant.
H. Flap Gate shall be provided with an adjustable, double pivoted hinge linkage so designed to
permit complete seating, Pivot lugs mounted to the frame shall be adjustable to allow adjustment
of hinge links without having to remove the cover from the gate. The hinge links shall be
bronzed bushed stainless steel. Optional hinge links of ductile iron, stainless steel (both bronze-
bushed), and manganese bronze may be specified. All assembly hardware shall be type 18-8
stainless steel, 316 or 304 as specified.
I. Slide gates shall be provided with full opening and stops or other arrangement to prevent the
cover from sliding sufficiently to become wedged in the open position. All assembly hardware
shall be type 18-8 stainless steel, 316 or 304 as specified.
J. Finish of all cast iron shall be painted with manufacturer’s standard shop coat paint or specified
paint. Structural steel hinge links shall be galvanized. All bronze and stainless-steel parts do not
require further finish.
2.7 THE SOURCE QUALITY CONTROL
A. Article is used to address Factory tests, inspections, and certifications required to be performed
at the shop prior to shipment to site.
10278680 City of Paducah 6/9/2021
Flood Protection Flap Gate Replacement
CAST IRON SLIDE GATES
40 05 58 - 5
PART 3 - EXECUTION
3.1 INSTALLATION
A. Installation of the gates and appurtenances shall be done in a workmanlike manner. It shall be
the responsibility of the CONTRACTOR to handle, store, and install the equipment specified in
this Section in strict accordance with the Manufacturer’s recommendations.
B. The CONTRACTOR shall review the installation drawings and installation instructions prior to
Installing the gates.
C. The CONTRACTOR shall fill any void between the guide frames and the structure with non-
shrink grout as shown on the installation drawing and in accordance with the grout
manufacturer’s recommendations.
D. Waterman recommendations a spring bumper for flap gates in a pump discharge application.
3.2 FIELD QUALITY CONTROL
A. Employ and pay for services of equipment manufacturer's field service representative(s) to:
1. Inspect equipment covered by this Specification Section.
2. Supervise adjustments and installation checks.
3. Provide test equipment, tools, and instruments necessary to accomplish equipment testing.
4. Conduct initial start-up of equipment, perform operational checks, and supervise acceptance
testing.
5. Provide, through Contractor, a written statement that manufacturer's equipment has been
installed properly, started up and is ready for operation by Owner's personnel.
6. Instruct Owner's personnel on operation and maintenance of furnished equipment.
B. Field Leakage Test for Cast Slide Gates: Test gate under design seating head by 0.004” gauge
and adjust to not exceed maximum leakage rate specified, per AWWA C560 standard.
END OF SECTION
10278680 City of Paducah 6/21/2021
Flood Protection Flap Gate Replacement
ADDENDUM FORM
00 91 13 - 1
SECTION 00 91 13
City of Paducah, Kentucky
Engineering Department
FLOOD PROTECTION FLAP GATE REPLACEMENT
ADDENDUM NO. 2
DATE: June 21, 2021
This document is an Amendment of the Plans and Specifications for the replacement of flap gates and
sluice gates within the city’s flood protection system and shall be a part of and included in the Contract.
When the Addendum conflicts with the original Specifications and/or Drawings, this Addendum shall
govern.
Questions Received: The following are answers addressing questions received from Bidders to date:
The Contract Time has been extended to 210 calendar days.
Wall thimbles are not anticipated to be encountered during the project but will be addressed as needed
during construction if encountered.
A project budget is not being provided for the project.
Gates within manholes include all work necessary to remove the existing gates and install the new
gates.
Support brackets for the flap gates may be removed and replaced as per the general notes, if needed.
The scope of work in the agreement has been updated.
Specification Section 00 41 13 – Bid Proposal is being re-issued to include additional information for
clarification regarding each gate location. Please replace this section in the Specifications.
Specification Section 00 52 13 – Agreement is being re-issued to address Articles 1 & 2. The scope of
work has been updated and the Contract Time has been extended to 210 Calendar Days. Please
replace this section in the Specifications.
Specification Section 40 05 58 – Cast Iron Flap Gates and Slide Gates is being re-issued to clarify
USACE review questions and comments. Please replace this section in the Specifications.
The following plans are being re-issued to address USACE review questions and comments. Please
replace the following sheets in the plans:
01C-02, 01C-03a, 01C-03b, 01C-03c, 01C-24a, 01C-24b, 01C-24c
Confirmation: Bidders shall Acknowledge Receipt of this Addendum by signing the last sheet of this
Addendum and returning to this office via e-mail at mtownsend@paducahky.gov
City of Paducah
_______________________
Rick Murphy, P.E.
City Engineer
10278680 City of Paducah 6/21/2021
Flood Protection Flap Gate Replacement
ADDENDUM FORM
00 91 13 - 2
CONFIRMATION
BIDDERS shall Acknowledge Receipt of This Addendum by Signing below and returning to this office
via e-mail mtownsend@paducahky.gov.
BIDDER: _______________________________________________________
BY: ___________________________________ DATE: __________________
TITLE: _________________________________________________________
10278680 City of Paducah 6/18/2021
Flood Protection Flap Gate Replacement
BID PROPOSAL – BID ITEMS
00 41 13 - 1
SECTION 00 41 13
CITY OF PADUCAH, KENTUCKY
ENGINEERING DEPARTMENT
BID PROPOSAL FOR FLOOD PROTECTION FLAP GATE REPLACEMENT
Proposal of _____________________________________________________
(hereinafter called Bidder), organized and existing under the laws of __________________
(state) and doing business as ___________________________*, as applicable to the City of
Paducah, Kentucky (hereinafter referred to as Owner.)
*Insert "A Corporation", A Partnership" or "An Individual"
In compliance with your Invitation for Bid, Bidder hereby proposes to furnish all the necessary
labor, materials, equipment, tools and services necessary for the construction of the Flood Protection
Flap Gate Replacement in accordance with the plans, specifications and other contract documents
prepared by the City Engineering Department, at the prices stated below.
By submission of this Bid, each Bidder certifies that this Bid has been arrived at independently,
without consultation, communication, or agreement as to any matter relating to this Bid with any other
Bidder or with any other competitor.
The Bidder further understands the quantities shown herein are estimates only and the Owner
reserves the unlimited right to add to or delete from same at its discretion. In case of a discrepancy in
the extension of a bid price, the unit price shall govern over the total price for all items.
Security in the sum of $ , in the form of a Bid Bond or cashier’s
check, said amount being equal to Five Percent (5%) of the Total Bid Amount, is submitted herewith in
accordance with the Specifications. This Security is furnished to the Owner as a guarantee that the
agreement will be executed, and all bonds required shall be furnished within ten (10) days after award of
the Contract to the undersigned. Additionally, the Bidder has submitted with this Bid Proposal the
required signed and notarized Certifications as required by the laws of the Commonwealth of Kentucky.
Failure of the Bidder to comply with these provisions will make the Bid Non-Responsive and shall
result in disqualification of the submitted Bid Proposal.
After reasonable consideration of all bids received, a Notice of Award will be given to the
Responsible Bidder who submits the lowest responsive bid in accordance with the specifications.
The responsible Bidder shall have the capability in all respects to perform fully the contracts
requirements, and the moral integrity and reliability of which to assure good faith performance. The
responsive Bidder shall submit a bid that conforms in all material respects to the specifications without
any deviations of the invitation for bids.
If Notice of Award is given to the Bidder within Sixty (60) days after the time of receipt of Bids, the
Bidder agrees to execute and deliver a Contract Agreement in the prescribed form and furnish the
required bonds and insurance within ten (10) days after the Contract is presented for signature.
Bidder hereby agrees to commence work under this contract on or before a date to be specified
in the Notice to Proceed and to fully complete the project within two-hundred ten (210) consecutive
calendar days thereafter. Bidder further agrees to pay as liquidated damages, the sum of five-hundred
Dollars ($500.00) for each consecutive calendar day thereafter until project completion as provided in
accordance with Specifications.
10278680 City of Paducah 6/18/2021
Flood Protection Flap Gate Replacement
BID PROPOSAL – BID ITEMS
00 41 13 - 2
Payments for Work Completed will be made in accordance with the Specifications.
In submitting this Bid, it is understood that the right is reserved by the Owner to reject any and all
Bids in accordance with the City of Paducah’s Code of Ordinances and the Specifications.
BID PROPOSAL:
Unit price includes costs indicated in Section 01 22 00 – Measurement and Payment.
ITEM DESCRIPTION Type BATTER
ANGLE UNIT QTY STATION PLAN SET
PAGE UNIT PRICE TOTAL ITEM
AMOUNT
1. Flap Gate - 60” F25 2.5° EA 1 200+58A 01C-04 $ $
2. Sluice Gate - 15” S25 - EA 1 187+49A 01C-04 $ $
3. Flap Gate - 60” F55 2.5° EA 6 157+63A 01C-05 $ $
4. Flap Gate - 24” F25 5° EA 1 151+25A 01C-05 $ $
5. Flap Gate - 24” F25 5° EA 1 147+25A 01C-05 $ $
6. Flap Gate - 24” F25 5° EA 1 144+00A 01C-05 $ $
7. Flap Gate - 16” F25 5° EA 1 140+45A 01C-05 $ $
8. Flap Gate - 30” F25 5° EA 1 130+00A 01C-06 $ $
9. Flap Gate - 72” F55 2.5° EA 1 111+67A 01C-06 $ $
10. Flap Gate - 24” F55 5° EA 1 84-00A 01C-07 $ $
11. Sluice Gate - 24” in MH S55 - EA 1 175+40B 01C-09 $ $
12. Sluice Gate - 24” in MH S25 - EA 1 161+66B 01C-09 $ $
13. Sluice Gate - 18” in MH S25 - EA 1 149+69B 01C-09 $ $
14. Sluice Gate - 30” in MH S25 - EA 1 145+92B 01C-09 $ $
15. Sluice Gate - 24” in MH S55 - EA 1 145+61B 01C-09 $ $
16. Flap Gate - 36” F25 5° EA 1 128+61B 01C-10 $ $
17. Flap Gate - 20” in MH F25 5° EA 1 123+61B 01C-10 $ $
18. Sluice Gate - 24” in MH S25 - EA 1 119+45B 01C-10 $ $
19. Flap Gate - 24” in MH F55 5° EA 1 115+26B 01C-10 $ $
20. Flap Gate - 54” in MH F55 2.5° EA 1 108+58B 01C-10 $ $
21. Sluice Gate - 36” in MH S25 - EA 1 90+36B 01C-11 $ $
22. Flap Gate - 18” F25 5° EA 1 80+00B 01C-11 $ $
23. Flap Gate - 8”, Outfall
Pipe, and Headwall F25 5° EA 1 74+40B 01C-11 $ $
10278680 City of Paducah 6/18/2021
Flood Protection Flap Gate Replacement
BID PROPOSAL – BID ITEMS
00 41 13 - 3
ITEM DESCRIPTION TYPE BATTER
ANGLE UNIT QTY STATION PLAN SET
PAGE UNIT PRICE TOTAL ITEM
AMOUNT
24. Flap Gate - 30” in MH F55 5° EA 1 69+86B 01C-12 $ $
25. Flap Gate - 24” in MH F55 5° EA 1 57+98B 01C-12 $ $
26. Flap Gate - 12” in MH F25 5° EA 1 28+49B 01C-12 $ $
27. Flap Gate - 66” F55 2.5° EA 1 19+11B 01C-13 $ $
28. Flap Gate - 18” F55 5° EA 1 7+54B 01C-13 $ $
29. Flap Gate - 36” F55 5° EA 1 291+75C 01C-14 $ $
30. Flap Gate - 36” F55 5° EA 1 254+06C 01C-15 $ $
31. Flap Gate - 30” F25 5° EA 1 244+65C 01C-15 $ $
32. Flap Gate - 36” F25 5° EA 1 224+17C 01C-16 $ $
33. Sluice Gate - 8” and MH
lid F25 - EA 1 220+00C 01C-16 $ $
34. Flap Gate - 24” F25 5° EA 2 217+35C 01C-16 $ $
35. Flap Gate - 36” F25 5° EA 1 206+90C 01C-16 $ $
36. Flap Gate - 24” F25 5° EA 1 200+55C 01C-17 $ $
37. Flap Gate - 24” F25 5° EA 1 199+80C 01C-17 $ $
38. Flap Gate - 48” F25 2.5° EA 1 176+90C 01C-17 $ $
39. Flap Gate - 24” F25 5° EA 1 176+47C 01C-18 $ $
40. Flap Gate - 24” F25 5° EA 1 172+08C 01C-18 $ $
41. Flap Gate - 48” F25 2.5° EA 1 128+80C 01C-19 $ $
42. Flap Gate - 48” F25 2.5° EA 2 92+70C 01C-20 $ $
43. Flap Gate - 30” F25 5° EA 1 51+28C 01C-22 $ $
44. Bonds and Insurance - - LS 1 - - $ $
TOTAL BID $
TOTAL BID: (written bid)
ADDENDUM
The Bidder hereby acknowledges receipt of the following Addenda, if any, and is fully aware of
the implications of the addendums on the Bid:
Addendum No(s) __________________ Dated _______________________
Attachments to the Bid Proposal Required:
1. Bid Bond in the amount of 5% of the bid.
2. Bidder’s Certification Signed and Notarized.
3. All additional information as required within the Technical Specifications.
10278680 City of Paducah 6/18/2021
Flood Protection Flap Gate Replacement
BID PROPOSAL – BID ITEMS
00 41 13 - 4
SUB-CONTRACTORS:
Subcontractors (if any) who the Bidder proposes to use on the project shall be listed. Once the
bidder's proposal has been accepted, there shall be no deviations from the list, except as requested by,
or upon approval of, the Owner.
COMPANY CONTACT PHONE WORK PROPOSED %
PREFERENCE TO KENTUCKY BIDDERS
In accordance with KRS 45A.365, prior to a contract being awarded, a resident bidder of the
Commonwealth shall be given a preference against a non-resident bidder registered in any state that
gives or requires a preference to bidders from that state. The preference shall be equal to the preference
given or required by the state of the non-resident bidder.
Bidder is a resident of the following state: ______________________________
If Bidder is a non-resident of the Commonwealth of Kentucky, indicate if any preference is given
by the resident’s state: ___________________________________
BID DOCUMENTS:
Bid Documents including the Bid Guaranty, shall be enclosed in an envelope clearly labeled with
the words "Bid Documents, Name of Project, Name of Bidder, and Date and Time of Bid Opening,"
in order to guard against premature opening of the bid. Bids received late will be disqualified and
returned to the sender unopened.
The Bidder herein certifies that all specifications have been reviewed and that any variations to
the said specifications, including exceptions to or enhancements to same, are clearly indicated as an
attachment to this bid.
THE ABOVE PROPOSAL IS HEREBY RESPECTFULLY SUBMITTED BY:
BIDDER: _______________________________________________________
BY: ___________________________________ DATE: __________________
TITLE: _________________________________________________________
ADDRESS: _____________________________________________________
_____________________________________________________
PHONE: _________________________ FAX: ________________________
CELL PHONE: ___________________ E-MAIL:_______________________
FEDERAL TAXPAYER IDENTIFICATION NUMBER: _____________________
KENTUCKY TAXPAYER IDENTIFICATION NUMBER: ____________________
CITY OF PADUCAH BUSINESS LICENSE NUMBER: ____________________
10278680 City of Paducah 6/21/2021
Flood Protection Flap Gate Replacement
AGREEMENT
00 52 13 - 1
SECTION 00 52 13
CITY OF PADUCAH, KENTUCKY
ENGINEERING DEPARTMENT AGREEMENT FOR FLOOD PROTECTION FLAP GATE
REPLACEMENT PROJECT
THIS AGREEMENT, made this day of , 20__ by and between the CITY OF
PADUCAH, hereinafter called the OWNER, and __________________, hereinafter called the
CONTRACTOR, for the consideration hereinafter named, agree as follows:
ARTICLE 1. SCOPE OF WORK
The Contractor agrees to furnish all of the materials and perform all of the work based upon the
Drawings and Specifications entitled Flood Protection Flap Gate Replacement on the City of Paducah
Flood Wall Protection System prepared by HDR, Inc., acting as, and in these Drawings, entitled the
Engineer; and shall do everything required by this Agreement, the Special Provisions of the Contract, the
Specifications and Drawings and any Addendum(a) issued.
ARTICLE 2. TIME FOR COMPLETION AND LIQUIDATED DAMAGES
The Contractor hereby agrees to commence work under this contract on or before a date to be
specified in the Notice to Proceed and to fully complete the project within Two-Hundred and Ten (210)
consecutive calendar days thereafter.
Failure of the Contractor to complete the work in the time specified above plus any extensions
allowed in accordance with the General Conditions shall result in the assessment of liquidated damages
for the delay (not as a penalty). Liquidated damages shall be in the amount of $500.00 per consecutive
calendar day for failure to meet the final completion date and shall be withheld from final payment.
ARTICLE 3. THE CONTRACT SUM
The Owner agrees to pay the Contractor for the performance of the Contract, subject to additions
and deductions provided therein: ________________________________ ($__________) as quoted in
the Bid Proposal by the Contractor dated ____________ which shall constitute full compensation for the
work and services authorized herein.
ARTICLE 4. PROGRESS PAYMENTS
The Contractor may submit each month, and no more than once a month, a Request for Payment
for work completed in accordance with the Specifications. The Owner will make partial payments on or
about thirty (30) days after submission of a properly completed invoice and approval of the completed
work. At the Engineer’s discretion, a ten percent (10%) retainage may be held until final completion and
acceptance of the work.
ARTICLE 5. ACCEPTANCE AND FINAL PAYMENT
Final payment shall be due sixty, (60) days after substantial completion of the work, provided the
work will then be fully completed and the Contract fully performed in accordance with the specifications.
ARTICLE 6. GOVERNING LAW
The Parties agree that this Agreement and any legal actions concerning its validity, interpretation
and performance shall be governed by the laws of the Commonwealth of Kentucky. The parties further
agree that the venue for any legal proceeding relating to this Agreement shall exclusively be in McCracken
County, Kentucky.
10278680 City of Paducah 6/21/2021
Flood Protection Flap Gate Replacement
AGREEMENT
00 52 13 - 2
ARTICLE 7. THE CONTRACT DOCUMENTS
The Plans, Specifications and any addendum that may have been issued are fully a part of this
Contract as if thereto attached or herein repeated.
IN WITNESS WHEREOF:
The parties hereto have executed this Agreement, the day and year first above written.
CONTRACTOR
CITY OF PADUCAH, KENTUCKY
BY __________________________ BY ____________________________
TITLE ________________________
George P. Bray, Mayor
ADDRESS: ADDRESS:
_____________________________ Post Office Box 2267
______________________________ Paducah, Kentucky 42002-2267
10278680 City of Paducah 6/21/2021
Flood Protection Flap Gate Replacement
CAST IRON SLIDE GATES
40 05 58 - 1
SECTION 40 05 58
CAST IRON FLAP GATES AND SLIDE GATES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Cast iron slide gates and integral operators.
2. Cast iron flap gates and integral operators.
B. Related Specification Sections include but are not necessarily limited to:
1. Division 00 - Procurement and Contracting Requirements.
2. Division 01 - General Requirements.
1.2 QUALITY ASSURANCE
A. Manufacturer Qualifications:
1. All of the equipment specified under this Section shall be furnished by a single
manufacturer with a minimum of 20 years’ experience designing and manufacturing flap
gates and slide gates.
2. The manufacturer shall have manufactured flap gates and slide gates for a minimum of 100
projects. The specification is based on the cast iron flap gate and slide gate as manufactured
by Waterman Valve, of Exeter, California.
B. Referenced Standards:
1. American Water Works Association (AWWA):
a. C541, Hydraulic and Pneumatic Cylinder and Vane-Type Actuators for Valves and
Slide Gates.
b. C542, Electric Motor Actuators for Valves and Slide Gates.
c. C560, Cast-Iron Slide Gates.
2. National Electrical Manufacturers Association (NEMA):
a. 250, Enclosures for Electrical Equipment (1000 Volts Maximum).
3. National Sanitation Foundation International (NSF):
a. 61, Drinking Water System Components - Health Effects.
4. Society for Protective Coatings/NACE International (SSPC/NACE):
a. SP 10/NACE No. 2, Near-White Blast Cleaning.
5. ASTM International (ASTM):
a. A108 (2003) Steel Bars, Carbon, Cold-Finished
b. A123/A123M (2002) Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
c. A126 Class B, Standards Specification for Gray Iron Castings for Valves, Flanges, and
Pipe Fittings
d. A153/A153M, Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel
Hardware.
e. A194/A 194M (2004a) Carbon and Alloy Steel Nuts for Bolts for High Pressure or
High Temperature Service or Both
f. A276 (2004) Stainless Steel Bars and Shapes
g. A307 (2004) Carbon Steel Bolts and Studs, 60 000 PSI Tensile Strength
h. A320/A 320M (2004) Alloy/Steel Bolting Materials for Low-Temperature Service
i. A536 Gr. 65-45-12, Standard Specification for Ductile Iron for Pivot Lugs
j. A 582/A 582M (1995b; R 2000e1) Free-Machining Stainless Steel Bars
k. B21/B 21M (2001e1) Naval Brass Rod, Bar, and Shapes
l. B584 (2004) Copper Alloy Sand Castings for General Applications
m. B633 (1998; E 2001) Electrodeposited Coatings of Zinc on Iron and Steel
n. F594(2002) Stainless Steel Nuts
10278680 City of Paducah 6/21/2021
Flood Protection Flap Gate Replacement
CAST IRON SLIDE GATES
40 05 58 - 2
1.3 SUBMITTALS
A. Submit the following with the Proposal:
1. Proposal Data Sheets.
B. Shop Drawings:
1. See Specification Section 01 33 00 for requirements for the mechanics and administration of
the submittal process.
2. Product technical data including:
a. Acknowledgement that products submitted meet requirements of standards referenced.
b. Flap Gates;
Shop drawings shall be submitted for sluice gates and flap gates showing details for
mounting, materials description, calculations (sluice gates opening and closing torque,
stem buckling strength & pedestal (lift)), gate operating pedestal (lift), concrete
reinforcement, anchorage, dimensions, and construction and manufacturer's installation
procedures. The shop drawings shall show the clearance dimensions between stem
couplings and stem guides and the end of the stem and the top of the stem cover, in
both the open and closed positions of the sluice gates. Manufacturer's catalog data,
including specifications and full descriptive data, shall be submitted for all materials
and equipment furnished. Contractor shall be responsible for verifying that the specific
manufacturers' sluice gates to be provided at the listed location will fit and function in
the area available.
3. Fabrication and/or layout drawings.
4. Certifications.
5. Product technical data including:
a. Acknowledgment that products submitted meet the requirements of standards
referenced.
b. Calculations that demonstrate compliance with the deflection, stress and factor of safety
specified.
c. Certified drawings and material specifications for ALL components.
d. Manufacturer's installation instructions.
e. Test records.
C. Product Data:
1. Acknowledgement that products submitted meet requirements of standards referenced.
2. Manufacturer's installation instructions.
3. Fabrication and/or layout drawings.
4. Certifications.
5. Test reports.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Subject to compliance with the Contract Documents, the following manufacturers are
acceptable:
1. Waterman Valve.
2. Hydro-Gate.
3. Fontaine.
4. Or engineered preapproved equal.
2.2 EQUIPMENT – SLIDE GATES
A. Provide heavy duty gates, stems, lifts and other appurtenances of size, type, material and
construction shown on the Contract Drawings and as specified herein.
B. Slide gates shall be of heavy duty and medium duty type.
C. Gates: Meet all requirements of AWWA C560 as modified per this Specification Section.
10278680 City of Paducah 6/21/2021
Flood Protection Flap Gate Replacement
CAST IRON SLIDE GATES
40 05 58 - 3
D. To ensure quality and consistency, no third party contracted manufacturers for fabrication and
assembly allowed. The manufacturing and assembly facility shall be a United States facility.
E. Cast iron components shall be domestic (United States) materials
F. Leakage rate not to exceed the maximum allowable leakage as stated in the AWWA C560
standard. The gates shall be adjusted at the manufacturing plant so that a 0.002” thick gauge (1/2
the required standard by AWWA) will not be admitted at any point between the frame and cover
seating surfaces.
2.3 EQUIPMENT – FLAP GATES
A. The flap gate shall be designed to allow free outflow and prevent backflow for a maximum
seating head of either 55 feet for F55 or 25 feet for F25.
B. When used for pump discharge, the unit shall be fitted with a Waterman-supplied leaf-spring
bumper with rubber cushion block.
C. To ensure quality and consistency, no third party contracted manufacturers for fabrication and
assembly allowed. The manufacturing and assembly facility shall be a United States facility.
D. Cast iron components shall be domestic (United States) materials
2.4 MATERIALS – FLAP GATES AND SLIDE GATES (REQUIRED MINIMUM)
A. Frame and Cover, Flap Gates and Slide Gates – Cast Iron per ASTM- A-126, Class B.
B. Flap Gate pivot Lug – Ductile Iron per ASTM A-536, Gr. 65-45-12.
C. Flap Gate hinge Link – Structural Steel ASTM A-36, galvanized per ASTM-A-123
D. Flap Gate bronze Bushing and Washers – Commercial Bronze
E. Flap Gate and Slide Gate, assembly Hardware, Fasteners, Anchors, and Hinge Pins – 18-8
Stainless Steel (Type 304)
F. Flap Gate Naval Bronze Seats – ASTM B-21, Alloy 48200
G. Slide Gate Manganese Bronze Seats, Wedges and Stem Blocks – ASTM B584, Alloy 86500
H. Slide Gate bottom close seal Neoprene Seats – ASTM D-2000 BC610/625
I. Slide Gate pedestal Cast Iron per ASTM- A-126, Class B with polyamide epoxy finish.
J. Slide Gate stem ASTM A276 Type 304 stainless steel, machine cut threads 29 degrees ACME
type.
K. Slide Gate stem guides Cast Iron ASTM A-126 Class B with bronze bushings or UHMW
bushings.
L. Slide Gate stem cover clear butyrate with Mylar strip indicator.
M. All gates with C-200A epoxy coating.
OPTIONAL MATERIALS
N. Low-Zinc Bronze Seats – ASTM B-198, Alloy 65100
O. Ductile Iron Hinge Link – ASTM A536, Gr. 65-45-12
P. Manganese Bronze Hinge Link – ASTM B584, Alloy 86500
Q. Bronze Bushings – ASTM B-98
R. Ni-Resist Cast Iron Frame and Cover – ASTM A-436, Type 2 or 2B.
2.5 GATE OPERATORS AND LIFTS
A. General:
1. Provide lifts in accordance with AWWA C560 or as modified in this Specification Section.
10278680 City of Paducah 6/21/2021
Flood Protection Flap Gate Replacement
CAST IRON SLIDE GATES
40 05 58 - 4
2. Rising stem lifts:
a. Provide clear butyrate plastic stem cover with Mylar strip open-close indicator.
B. Manual Operators:
1. Equip lift mechanism with a pedestal as shown on Drawings.
2. Centerline of crank or handwheel: Approximately 36 IN above operating floor, unless
otherwise shown.
3. Crank wheel: Removable and fitted with a corrosion resistant rotating handle.
4. Sizing SOP can be found in USCAE EM 1110-2-3105 sections 14.3.g – 14.3.i.
2.6 FABRICATION
A. Flap Gate frame shall be cast of flatback design, with seating surface inclined from vertical at a
minimum of 2.5 degrees for gates larger than 48 inches and 5 degrees for gates 48 inches and
smaller to assure positive closure, batter in accordance with USCAE Chapter 9, Section 9.4.1.4.3
of EM 1110-2-2902. For flatback Slide Gates mounted to thimbles or flanges or concrete wall,
the slide gate flange shall be machined and drilled to an alternate bolt pattern.
B. Cover shall be cast iron, cast in one piece, with reinforcing ribs, designed to withstand the
seating head specified. An integral cast on lifting eye shall be provided for manual operation.
All machined surfaces shall have a minimum 63 micro inch finish.
C. Seating surfaces for frame and cover shall be one of the following:
1. Machined iron
2. Flap gate and slide gate bronze seats impacted into dovetail grooves on the frame and cover.
3. Flap gate bronze seats impacted into dovetail grooves within the frame with optional
neoprene seat bonded into a dovetail groove in the cover to cushion the cover upon closing.
4. Slide gate with bronze seats impacted into dovetail grooves in cover. When a flush bottom
closure is specified, a resilient seal shall be attached to the frame so that it is flush with the
gate invert. The flush bottom seal shall be supported by a cast iron or stainless-steel bracket
which shall be bolted to machined pads provided on the frame. The seal shall be held in
place by a bronze or stainless-steel bar which shall be bolted through the seal to the bracket
with stainless steel fasteners. All wedges and wedge blocks shall be of solid corrosion
resistant material and shall be of sufficient number to provide a practical degree of water
tightness per AWWA C560. All wedge bearing surfaces and contact faces shall be
machined to give maximum contact and wedging action. Wedges shall be fully adjustable,
but once set shall not rotate or move from the set position. All wedge fasteners and
adjustment screws shall be corrosion resistant.
D. Flap Gate shall be provided with an adjustable, double pivoted hinge linkage so designed to
permit complete seating, Pivot lugs mounted to the frame shall be adjustable to allow adjustment
of hinge links without having to remove the cover from the gate. The hinge links shall be
bronzed bushed stainless steel. Optional hinge links of ductile iron, stainless steel (both bronze-
bushed), and manganese bronze may be specified. All assembly hardware shall be type 18-8
stainless steel, 316 or 304 as specified.
E. Slide gates shall be provided with full opening and stops or other arrangement to prevent the
cover from sliding sufficiently to become wedged in the open position. All assembly hardware
shall be type 18-8 stainless steel, 316 or 304 as specified.
F. Finish of all cast iron shall be painted with Formula C-200A, Coal-Tar -Epoxy (Black) Paint, 20
mils thick. Surfaces shall be sanded or sandblasted prior to application. C-200A shall be applied
by the equipment manufacturer with a minimum of two thin coats. Structural steel hinge links
shall be galvanized. All bronze and stainless-steel parts do not require further finish.
2.7 THE SOURCE QUALITY CONTROL
A. Article is used to address Factory tests, inspections, and certifications required to be performed
at the shop prior to shipment to site.
10278680 City of Paducah 6/21/2021
Flood Protection Flap Gate Replacement
CAST IRON SLIDE GATES
40 05 58 - 5
PART 3 - EXECUTION
3.1 INSTALLATION
A. Installation of the gates and appurtenances shall be done in a workmanlike manner. It shall be
the responsibility of the CONTRACTOR to handle, store, and install the equipment specified in
this Section in strict accordance with the Manufacturer’s recommendations.
B. The CONTRACTOR shall review the installation drawings and installation instructions prior to
Installing the gates.
C. The CONTRACTOR shall fill any void between the guide frames and the structure with non-
shrink grout as shown on the installation drawing and in accordance with the grout
manufacturer’s recommendations.
D. Waterman recommendations a spring bumper for flap gates in a pump discharge application.
3.2 FIELD QUALITY CONTROL
A. Employ and pay for services of equipment manufacturer's field service representative(s) to:
1. Inspect equipment covered by this Specification Section.
2. Supervise adjustments and installation checks.
3. Provide test equipment, tools, and instruments necessary to accomplish equipment testing.
4. Conduct initial start-up of equipment, perform operational checks, and supervise acceptance
testing.
5. Provide, through Contractor, a written statement that manufacturer's equipment has been
installed properly, started up and is ready for operation by Owner's personnel.
6. Instruct Owner's personnel on operation and maintenance of furnished equipment.
B. Field Leakage Test for Cast Slide Gates: Test gate under design seating head by 0.004” gauge
and adjust to not exceed maximum leakage rate specified, per AWWA C560 standard.
END OF SECTION
01C-02
02_GEN NOTES
NTS
GENERAL NOTES
1 06/03/2021 SUBMITTED FOR BID
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
FILENAME
SCALE
SHEET
10278680
DESIGNED
DRAWN
QA/QC
Lorie Lightfoot
for the City of Paducah
FLAP GATE REPLACEMENT
FLOOD PROTECTION
Doug Hawes
Doug Hawes
24549
HAWES
DOUGLAS B.YK
CUTNEK FO ETAT
SREENIGNE LANO
ISS
EFORPDESNECIL
06/14/2021
Kyle Guthrie
NTS
03_REHAB SUM
01C-03a
SECTION A
REHABILITATION SUMMARY
1 06/03/2021 SUBMITTED FOR BID
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
FILENAME
SCALE
SHEET
10278680
DESIGNED
DRAWN
QA/QC
Lorie Lightfoot
for the City of Paducah
FLAP GATE REPLACEMENT
FLOOD PROTECTION
Doug Hawes
Doug Hawes
24549
HAWES
DOUGLAS B.YK
CUTNEK FO ETAT
SREENIGNE LANO
ISS
EFORPDESNECIL
06/14/2021
Kyle Guthrie
NTS
03_REHAB SUM
01C-03b
SECTION B
REHABILITATION SUMMARY
1 06/03/2021 SUBMITTED FOR BID
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
FILENAME
SCALE
SHEET
10278680
DESIGNED
DRAWN
QA/QC
Lorie Lightfoot
for the City of Paducah
FLAP GATE REPLACEMENT
FLOOD PROTECTION
Doug Hawes
Doug Hawes
24549
HAWES
DOUGLAS B.YK
CUTNEK FO ETAT
SREENIGNE LANO
ISS
EFORPDESNECIL
06/14/2021
Kyle Guthrie
NTS
03_REHAB SUM
01C-03c
SECTION C
REHABILITATION SUMMARY
1 06/03/2021 SUBMITTED FOR BID
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
FILENAME
SCALE
SHEET
10278680
DESIGNED
DRAWN
QA/QC
Lorie Lightfoot
for the City of Paducah
FLAP GATE REPLACEMENT
FLOOD PROTECTION
Doug Hawes
Doug Hawes
24549
HAWES
DOUGLAS B.YK
CUTNEK FO ETAT
SREENIGNE LANO
ISS
EFORPDESNECIL
06/14/2021
Kyle Guthrie
NTS
24 DETAILS
01C-24a
SHEET KEYNOTES
1.
1
PIPE HEADWALL AND FLAP GATE
2.
2
2
HEADWALL
EXIST.
WALL PIPE SECTION
FLAP GATE &
FLAP GATE SECTION & DETAIL
MISCELLANEOUS DETAILS
1
2
3
4
STEEL EPOXY ANCHORS.
GATES ATTACHED TO HEADWALL WITH NEW 316 STAINLESS
SHALL BE REMOVED AND REPLACED WITH NEW FLAP
THE FLAP GATES LOCATED ON THE EXISTING HEADWALL,
WITH WATER TIGHT, NON SHRINK GROUT.
AFTER INSTALLATION OF NEW FLAP GATE, FILL VOID SPACE
REMOVAL WITH HIGH STRENGTH 5000 psi HYDRAULIC GROUT.
REPLACE CONCRETE DAMAGED FROM EXISTING FLAP GATE
BOLT PATTERN WITH NEW FLAP GATES.
EPOXY OR CUT FLUSH WITH HEADWALL. USE ALTERNATE
EXISTING BOLTS ARE TO BE REMOVED AND FILLED WITH
5 DEGREES FOR GATE DIAMETERS 48" OR GREATER.
2.5 DEGREES FOR GATE DIAMETERS LESS THAN 48" AND
WITH CHAPTER 9, SECTION 9.4.1.4.3 OF EM 1110-2-2902;
FLAP GATES TO HAVE A BATTER ANGLE IN ACCORDANCE
3.
4.
1 06/03/2021 SUBMITTED FOR BID
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
FILENAME
SCALE
SHEET
10278680
DESIGNED
DRAWN
QA/QC
Lorie Lightfoot
for the City of Paducah
FLAP GATE REPLACEMENT
FLOOD PROTECTION
Doug Hawes
Doug Hawes
24549
HAWES
DOUGLAS B.YK
CUTNEK FO ETAT
SREENIGNE LANO
ISS
EFORPDESNECIL
06/14/2021
Kyle Guthrie
NTS
24 DETAILS
01C-24b
LEGEND
1.REMOVE HAND OPERATED GATE HOIST.
2.
3.REMOVE STEM AND ASSOCIATED GUIDES, COUPLINGS.
4.REMOVE GATE FRAME AND ALL ASSOCIATED PARTS.
B
A
A B
1
2
4
44
3
3
1
2
PIPE
EXIST.
PIPE
EXIST.
PIPE
EXIST.
EXIST.
REMOVE GATE.
OUTFALL
TOP OF SLABTOP OF SLAB
EXIST.
OUTFALL
PIPE
EXIST.PIPE
EXIST.
PIPE
EXIST.
DEMOLITION
SHEET KEYNOTESSHEET KEYNOTESSHEET KEYNOTES
2
GATEWELL SECTION GATEWELL SECTION
01C-24b
01C-24b
GATEWELL PLAN
GATEWELL SLUICE GATE DEMOLITION
MISCELLANEOUS DETAILS
1 06/03/2021 SUBMITTED FOR BID
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
FILENAME
SCALE
SHEET
10278680
DESIGNED
DRAWN
QA/QC
Lorie Lightfoot
for the City of Paducah
FLAP GATE REPLACEMENT
FLOOD PROTECTION
Doug Hawes
Doug Hawes
24549
HAWES
DOUGLAS B.YK
CUTNEK FO ETAT
SREENIGNE LANO
ISS
EFORPDESNECIL
06/14/2021
Kyle Guthrie
NTS
24 DETAILS
01C-24c
1.PROVIDE STEM COVER CLEAR BUTYRATE WITH OPEN, CLOSED, 1/4,
1/2, AND 3/4 DECAL.
2.
3.
FABRICATED ASTM A36 STEEL FLOORSTAND, PRIME AND FINISH
C200A EPOXY.
4.
5.
BRONZE THRUST NUT WITH 316L LOCKING BOLT.
DIA. ANCHORS AND MIN. EMBEDMENT PER MANUFACTURER
REQUIREMENTS. USE NUTS FRONT AND BACK OF FRAME TO
MOUNT AND ADJUST BEFORE GROUT AT MINIMUM.
B
A
TOP OF SLAB
EXIST.
OUTFALL
PIPE
EXIST.PIPE
EXIST.
PIPE
EXIST.
4PIPE
EXIST.
PIPE
EXIST.
EXIST.
OUTFALL
EXIST.
PIPE
1
SHEET KEYNOTESSHEET KEYNOTESSHEET KEYNOTES
A
A
GATEWELL SECTION
B
GATEWELL SECTION
01C-24c
01C-24c
& TOP, AND NEOPRENE FLUSH BOTTOM. C200A EPOXY COATING.
22
4
3
5
3 5
GATEWELL SLUICE GATE REPLACEMENT
MISCELLANEOUS DETAILS
GATEWELL PLAN
FABRICATED SLUICE GATE WITH UHMW/NEOPRENE SEALS, SIDES
ARE MET IF ALTERNATE MANUFACTURER IS SUBMMITED.
TO VERIFY THAT DIMENSIONS AND PERFORMANCE STANDARDS
SECTION 2.1.A. IT IS THE RESPONSIBILITY OF THE CONTRACTOR
MANUFACTURERS ARE ALLOWED IN ACCORDANCE WITH 40 05 58
DEVELOPED IN CONJUNCTION WITH WATERMAN. ALTERNATE
DESIGN AND DETAILS FOR FLAP AND SLUICE GATES WERE
NOTE:
1 06/03/2021 SUBMITTED FOR BID
1
A
B
C
2 3 4 5 6 7 8
D
ISSUE DATE DESCRIPTION
PROJECT MANAGER
PROJECT NUMBER
FILENAME
SCALE
SHEET
10278680
DESIGNED
DRAWN
QA/QC
Lorie Lightfoot
for the City of Paducah
FLAP GATE REPLACEMENT
FLOOD PROTECTION
Doug Hawes
Doug Hawes
24549
HAWES
DOUGLAS B.YK
CUTNEK FO ETAT
SREENIGNE LANO
ISS
EFORPDESNECIL
06/14/2021
Kyle Guthrie