Loading...
HomeMy WebLinkAboutOrdinances Book 17, Page 703, Ordinance Number 71-7-508703 i.. ORDINANCE NO. 71-7-508 AN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH COMMUNITY PROGRAMS CONSULTANTS, INC. FOR ENGINEERING SERVICES FOR THE CODE ENFORCEMENT GRANT EXECUTION STAGE OF THE MECHANICSBURG CONCENTRATED CODE ENFORCEMENT PROJECT IN THE CITY OF PADUCAH, KENTUCKY BE IT ORDAINED BY THE BOARD OF COMMISSIONERS OF THE CITY OF PADUCAH, KENTUCKY: SECTION 1. That the City Manager be, and he is hereby, authorized to execute a contract with Community Program Consultants, Inc. for engineering services for the code enforcement grant execution stage of the Mechanicsburg Concentrated Code Enforcement Project, Kentucky E-2, in the City of Paducah, Kentucky. SECTION 2. The contract shall provide for furnishing engineering services relating to streets, alleys, sidewalks, curbs, gutters, and such public improvements within the code enforcement area and approved Code Enforcement Plan, and said services shall include surveys, designs, working drawings, specifications, cost estimates, contract and bidding documents, advertising for bids, review of bids and recommendations for acceptance or rejection of bids, coordination of engineering services with other engineering personnel working within the project area and with utilities, obtaining written approvals required by city, state and federal agencies in obtaining necessary permits and licenses for site improvements, providing progress reports, sampling and testing of construction materials, inspecting the project periodically, providing such resident inspection as may be approved by the Department of Housing and Urban Development, and providing a final inspection upon completion Of site improvements, and furnishing such services as may be required to assure compliance with the plans and contract documents, and such other services as may be agreed upon between the Engineer and the City Ma na ger . SECTION 3. The compensation for the engineering services shall be the standard percentages for engineering services based upon the cost of construction together with additional sums for certain required tests, surveys, inspections, travel and extraordinary requirements and expenses, but the total compensation to be paid under this contract shall in no event exceed the sum of 10% of the total project cost of improvements for which engineering services shall be applicable. 704 SECTION 4. The contract shall be subject to standard terms and conditions, and all salaries shall be in accordance with the current and acceptable determination of prevailing salaries for technical positions for this locality. SECTION 5. An emergency is declared to exist and this ordinance shall therefore be ibtroduced and remain on file for at least one week for public inspection in the completed form in which it shall be put upon its final passage, and if adopted shall be in full force and effect immediately thereafter. Mayor I Introduced by the Board of Commissioners July 2, 1971 Passed by the Board of Commissioners July 13, 1971 Recorded by Sarah Thurman, City Clerk, July 13, 1971.