Loading...
HomeMy WebLinkAboutOrdinances Book 15, Page 742, No Ordinance NumberAN ORDINANCE AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH WEST KENTUCKY PAVING COMPANY FOR THE RESURFACING OF VARIOUS STREETS IN THE CITY OF PADUCAH, KENTUCKY, INCLUDING THE RAISING AND RESETTING OF MANHOLES, CATCH BASINS AND MONUMENTS, AND 'PRESCRIBING THE TERMS AND CONDITIONS OF SAID CONTRACT BE IT ORDAINDE BY THE BOARD OF COMMISSIONERS OF THE CITY OF PADUCAH, KENTUCKY: SECTION 1. That the City Manager be, and he is hereby, authorized to enter into a contract with West Kentucky Paving Company (herein- after referred to as the "Contractor") for the resurfacing of various streets in the City of Paducah, Kentucky, and said work shall be done on the following terms, conditions and specifications: The surfacing of the present pavement shall be leveled where necessary and resurfaced with approximately 13 inch application of Kentucky State Highway Class I Type B bituminous concrete surfacing, Class 2 bituminous leveling course. Said work to include bituminous prime coat RS -1 complying with Kentucky State Highway specifications, and the raising and resetting to grade of manholes, catch basins and monuments located in the area to be resurfaced." The surfacing shall consist of limestone aggregate complying with Kentucky State Highway specifications. Said work of resurfacing shall be paid for by the City to the Contractor on the following basis: Class I, Type B bituminous concrete surfacing mixture using all limestone aggregate for the sum of $8.00 per ton. Bituminous prime cost RS -1 complying with Kentucky State Highway specifications for the sum of $0.30 per gallon. Raising and resetting of manholes, catch basins anddmonuments for the sum of $50.00 each. The contractor shall resurface only such blocks of streets as may be authorized in writing by the City Manager, and it is anticipated that approximately 2,000 tons, more or less, will be required. All work shall be performed under the direction of the City of Paducah Engineering Department, and such work shall be paid for upon certofication of the completion thereof and when approved and accepted by the City Engineer. The contractor shall execute a performance bond or bonds in an amount not less than the estimated cost of the work authorized by the City Manager, to insure the proper performance and completion of said work, and in addition will be required to keep in full force and effect liability insurance to protect the City from claims of persons or damage to property of persons in the following amounts: 743 $100,000 for personal injury or death to any one person $200,000 for personal injury or death to more than one person resulting from the same accident, and $ 10,000 for damage to property in any one accident SECTION 3. This ordinance shall be introduced and remain on file for at least one (1) week for public inspection in the completed form in which it shall be put upon its final passage, and if adopted shall be in full force and effect ten (10) days thereafter. Mayor Introduced by the Board of Commissioners August 24, 1965 Adopted by the Board of Commissioners August 31, 1965 Recorded by Sarah Thurman, City Clerk, August 31, 1965.