HomeMy WebLinkAboutOrdinances Book 15, Page 742, No Ordinance NumberAN ORDINANCE AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT
WITH WEST KENTUCKY PAVING COMPANY FOR THE RESURFACING OF VARIOUS STREETS
IN THE CITY OF PADUCAH, KENTUCKY, INCLUDING THE RAISING AND RESETTING
OF MANHOLES, CATCH BASINS AND MONUMENTS, AND 'PRESCRIBING THE TERMS
AND CONDITIONS OF SAID CONTRACT
BE IT ORDAINDE BY THE BOARD OF COMMISSIONERS OF THE CITY OF
PADUCAH, KENTUCKY:
SECTION 1. That the City Manager be, and he is hereby, authorized
to enter into a contract with West Kentucky Paving Company (herein-
after referred to as the "Contractor") for the resurfacing of various
streets in the City of Paducah, Kentucky, and said work shall be done
on the following terms, conditions and specifications:
The surfacing of the present pavement shall be leveled where
necessary and resurfaced with approximately 13 inch application of
Kentucky State Highway Class I Type B bituminous concrete surfacing,
Class 2 bituminous leveling course. Said work to include bituminous
prime coat RS -1 complying with Kentucky State Highway specifications,
and the raising and resetting to grade of manholes, catch basins and
monuments located in the area to be resurfaced." The surfacing shall
consist of limestone aggregate complying with Kentucky State Highway
specifications.
Said work of resurfacing shall be paid for by the City to the
Contractor on the following basis:
Class I, Type B bituminous concrete surfacing mixture using all
limestone aggregate for the sum of $8.00 per ton.
Bituminous prime cost RS -1 complying with Kentucky State
Highway specifications for the sum of $0.30 per gallon.
Raising and resetting of manholes, catch basins anddmonuments
for the sum of $50.00 each.
The contractor shall resurface only such blocks of streets as may
be authorized in writing by the City Manager, and it is anticipated
that approximately 2,000 tons, more or less, will be required. All
work shall be performed under the direction of the City of Paducah
Engineering Department, and such work shall be paid for upon
certofication of the completion thereof and when approved and accepted
by the City Engineer.
The contractor shall execute a performance bond or bonds in
an amount not less than the estimated cost of the work authorized by
the City Manager, to insure the proper performance and completion of
said work, and in addition will be required to keep in full force
and effect liability insurance to protect the City from claims of
persons or damage to property of persons in the following amounts:
743
$100,000 for personal injury or death to any one person
$200,000 for personal injury or death to more than one person
resulting from the same accident, and
$ 10,000 for damage to property in any one accident
SECTION 3. This ordinance shall be introduced and remain on
file for at least one (1) week for public inspection in the completed
form in which it shall be put upon its final passage, and if adopted
shall be in full force and effect ten (10) days thereafter.
Mayor
Introduced by the Board of Commissioners August 24, 1965
Adopted by the Board of Commissioners August 31, 1965
Recorded by Sarah Thurman, City Clerk, August 31, 1965.