HomeMy WebLinkAboutOrdinances Book 15, Page 1035, No Ordinance Number1035
AN ORDINANCE AUTHORIZING THE CITY MANAGER TO ENTER INTO A
CONTRACT WITH W. H. YANCY & SONS ASPHALT PAVING COMPANY FOR THE
PXSURFACING OF VARIOUS STREETS IN THE CITY OF PADUCAH, KENTUCKY,
INCLUDING THE RAISING AND RESETTING OF MANHOLES, CATCH BASINS AND
MONUMENTS, AND PRESCRIBING THE TERMS AND CONDITIONS OF SAID CONTRACT
BE IT ORDAINED BY THE BOARD OF COMMISSIONERS OF THE CITY OF
PADUCAH, KENTUCKY:
SECTION 1. That the City Manager -be, and he -is hereby, -
authorized to enter into a contract with W. H. Yancy & Sons Asphalt
Paving Company (hereinafter referred to as the "Contractor") for the
resurfacing of various streets in the City of Paducah, Kentucky,
and said work shall be done on the following terms, conditions and
specifications:
The surfacing of the present pavement shall be leveled where
necessary and surfaced with approximately 2 -inch application of
Kentucky State Highway Class I Type B bituminous concrete surfacing,
Class I bituminous leveling course. Said work to include botuminous
prime coat RS -1 complying with Kentucky State Highway specifications,
and the raising and resetting to grade of manholes, catch basins and
monuments located in the areas to be resurfaced. The surfacing shall
consist of limestone aggregate complying with Kentucky State Highway
specifications.
Said work of resurfacing shall be paid for by the City to the
Contractor on the following, basis:
Kentucky State Highway Class I Type B bituminous concrete
surfacing, and Class I bituminous leveling course for the sum of ;13.00
per ton.
Bituminous prime coat RS -1 complying with Kentucky State
Highway specifications for the sum of $'0.50 per gallon.
Raising and resetting- of manholes, catch basins and monuments
for the sum of $75.00 each.
All work to he done by the Contractor under the direction of
the City of Paducah Engineering Department and the street areas to
he resurfaced shall be designated by the City Manager. The work
done by the Contractor shall he paid for upon certification of tre
completion thereof by the City Engineer and approved and accepted
by him. it is estimated that approximately 100 to 300 tons of
surfacin, will he required.
The Contractor shall execute a performance bond in the amount
of the estimated cost of the work to insure the proper performance and
completion of said work, and in addition thereto will he required to
keep in full force and effect liability insurance protecting the City
1036,
from any claims of persons or property of persons in the following*
amounts:
$100,000 for personal injury or death to any one person
6200,000 for personal inury or death to more than one person
resulting from the same accident, and
$10,000 for damage to property in.anv one accident
SECTIOA� This ordinance shall be introduced and remain
on file for at least one (1) week for public inspection in the completed
form in which it shall -be put upon its final passage, and if adopted
shall be in full force and effect ten (10) days thereafter.
7
Mayor ---
Introduced by the Board of Commissioners August 9, 1966
Passed by the Board of Commissioners Aupust 16, 1966
Recorded ',- Sarah Thurman, City Clerk_, August 16, 1966.