Loading...
HomeMy WebLinkAboutOrdinances Book 13, Page 411, No Ordinance NumberAN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH R. B. TYLER COMPANY, INCORPORATED FOR RESURFACING OF NOT MORE THAN 23 BLOCKS OF STREETS IN THE CITY OF PADUCAH, KENTUCKY, INCLUDING THE RAISING AND RESETTING OF MANHOLES AND CATCH BASINS, AND PRE- SCR.IBING THE TERMS AND CONDITIONS OIF SAID CONTRACT BE IT ORDAINED BY'THE BOARD OF COMMtISSIONERS OF THE CITY OF PADUCAH, KENTUCKY: SECTION 1. That the City Manager be, and he is hereby, authorized to contract with R. B. Tyler Company, Incorporated, (hereinafter referred to as the "Contractor") for the resurfacing of not more than 23 blocks of streets in Paducah, Kentucky, set out and described in a resolution passed by the Board of Commissioners on June 14, 1955, and said work shall be done on the following terms, conditions and specifications: Said surfacing is to be from gutter to gutter with full widths to street property lines at all intersections. The surfacing of the present pavement shall be leveled where necessary and surfaced with 1211 application of Kentucky State Highway Class "I", Type "B" Bituminous concrete surfacing, Class "I" Bituminous leveling course said work to include bituminous prime coat and the raising and resetting to grade of manholes and catch basins located in the areas to be surfaced. All work is to be performed under the direction of the City Engineer and shall be paid for when same is certified, approved and accepted by the City Engineer. Said work of resurfacing shall be paid for by the City to said Conpractor on the following basis: Class "I" Type "B" Bituminous Concrete Surface - Unit price x'7.35 per ton RC -2, tack coat applied at the rate of .10 gallon per square yard - Unit price $.16 per gallon Raising manholes° and catch basins - Unit price $50.00 each. The Contractor shall resurface only such blocks of said streets as may be authorized in writing by the City Manager, and such authorization shall not exceed the total number of 23 blocks nor shall it exceed the total bid of the Contractor in the sum of $45,113.87. The Contractor is to execute a performance bond or bonds in an amount not less than the estimated cost of the work authorized by the City Manager to insure the proper performance and completion of said work and in addition will be required to keep in full force and effect liability insurance to protect the City from any claim to persons or property of persons in the following amounts: 412 10,000 for personal injury or death to any one person 20,000 for personal injury or death to more than one person resulting from the same accident, and 5,000 for damage to property in any one accident. SECTION 2. This ordinance shall be introduced at a regular meeting of the Board of Commissioners of the City of Paducah, Kentucky and remain on file for at least one (1) week for public inspection in the completed form in which i£ shall be put upon its final passage, but it being necessary for the public health and safety of the City of Paducah, Kentucky that such streets -be resurfaced as soon as possible an emergency is hereby declared to exist and this ordinance shall be in full force and effect.£rom and after its adoption. Yn:A�� �Yor Introduced by the Board of.Commissioners September 13, 1955 Passed by the Board Of Commissioners September 20, 1955 Recorded by Sarah Thurman, City Clerk, September 20,_1955. FIN