I AN ORDINANCE ASSESSING THF ABUTTING PROPERTY ON BOTH SIDES OF
NINTH STPEFT, FROM THE SOUTH PROPERTY LINE OF MADISON STFEET TO THE
SOUTH PPOPEPTY LINE. OF CLAY STF.FFT; EIGHTH STFFET, FROM THE SOUTH
PROPERTY LINE OF MADISON STRFFT TO TIIF NORTH PP.OPERTY LINE OF BUFNE:TT
STRFFT, EXCEPT THE INTERSECTION AT EIGHTH AND CLAY STRE7TS; MADISON
STRFFT, FROM THF WEST PROPERTY LINE OF EIGHTH STREET TO THE FAST
PROPERTY LINE OF NINTH STREET, IN THF CITY OF PADUCAH, MCCRACKEN
COUNTY, KENTUCKY, FOR THE COST OF CONSTRUCTION OF PAVED STREET WITH
ALL NECESSARY CURB, GUTTER, DRIVPWAYS, MANHOLFF, INTAKES, CATCH
BASINS, DRAIN TILE AND SF7FR PIPE, ATTD ALL NECESSARY ENGINEERING,
ADVERTISING AND LEGAL AND CLERICAL SERVICE IN CONNECTION THFRETITH
AS FOLLOWS:
COST OF PAVING AND EXCAVATION
ON MADIFON STPD T .............$4.793412220 PER ABUTTING FT.
COST OF PAVING AND EXCAVATION
ON 8TH AND 9TH STREETS........4.546954906 PER ABUTTING FT.
COST OF EXTRAWORK.. '0.00082691463 PER DOLLAR CONGTRUCTION
COST
COST OF INTFREST ..............10.01792819827 PER DOLLAR CONSTRUCTION
COST
COST OF ENGINEERING AND
INSPECTION....................$0.03129712032 PER DOLLAR CONSTRUCTION
COST
COST OF CONCRETE GUTTER....... 40.30 PER LIN. FT.
COST OF CONCRETE DRIVEWAY ..... *0.25 PER Sq. FT.
COST OF CONCRETE CURB
STRAIGHT ......................50.50 PER LIN. FT.
COST OF CONCRETE CURB CURVLD..0.60 PER LIN. FT.
COST OF CONCRETE AEP.DER.......pO.35 PER LIN. FT.
COST OF CONCRETE GUTTER
REBUILT .......................$0.50 PER LIN. FT.
AND PROVIDING THAT THF COST OF `UCH CONSTRUCTION, INTPPEST, EXTRA
WORK, AND ALL NFCE`SARY ENGINEERING, ADVERTISING AND LEGAL AND
CLEPICAL SERVICE IN CONNECTION THFRE7ITH BE CHARGEABLE TO AND
ASSF..SSFD AGAINST THE PROPERTY RFCFIVING THE BENEFIT OF SAME AND
ABUTTING UPON SAID IMPROVFTr7NT, AS SHO".'N BY THE T'NGINFFRIS ES7ITTATES
ON FILE IN THE OF`ICF Or THE COT.RFISFIONTTR OF PUBLIC -ORNO, AND
PROVIDING THAT SAID ASSESSMENT MAY BE PAID IN TFN E^UAL INSTALLUFNTS,
BF.TNG ONE FACE YEAR FOR A PF - IOD OF T`N YFARS.
WHEREAS, the Board of Commissioners of the City of Paducah,
Kentucky has heretofore on the 8th day of April, 1929 adopted an
ordinance entitled, "AN ORDINANCE PROVIDING FOR THE CONSTRUCTION
AND RECONSTRUCTION OF THE DRIVEWAY ON NORTH NINTH STRFFT FROM THE
SOUTH PROPFRTY LINE OF MADISON STREET TO THE SOUTH PROPERTY LINE OF
CLAY STREET: AND ON EIGHTH STREFT FROM THE SOUTH PROPERTY LINE OF
MADIFON STRFFT TO THE NORTH PROPERTY LINE OF BURNFTT STREET, EXCEPT
THE INTERSECTION AT STH AND CLAY STREETS; AND ON MADISON STRFFT
FROM THE WEST PROPERTY LINE OF EIGHTH STRFFT 1'O THE EAST PROPFRTY
LINE OF NINTH STRFFT, IN THE CITY OF PADUCAH, MCCRACKEN COUNTY,
KFNIUCKY,'.".'ITH ALL NECESSARY CURBS, GUTTERS, DRIVEWAYS, MANHOLES,
INTAKES, CATCH BAPINS, SE'"rFR AND DRAIN PIPE, AND ALL NECESSARY
FNGINEPPING, ADVERTISING AND L -GAL AND CLFRICAL SFRVICF IN CONNFCTION
IFFPF."TTH AT THF COST OF TRF hBUTTING PPOFOPTY OTNTRS AND PROVIDING
Page 441
C
C
C
c
C
C
i
C
u.
THAT SAME MAY BE CONSTRUCTED UPON THF TPN YEAR PAYMENT PLAN', and
VnMREAS, in accordance with said ordinance it is
Provided that the cost of construction of said driveway, together with all'AML
necessary curb, gutter, driveways, manholes, intakes, catch basins, drain
tile and sewer pipe, and all necessary engineering, advertising and
legal and clerical service in connection therewith and all other work
done thereunder be paid for by the abutting property o^.hers on both sides
thereof, except that portion to be paid by the city of Paducah as
recuired by law, and
!nW.RFAS, pursuant to said ordinance a contract was
lentered into on the day of
,1929, between
the Southern Roads Company, contractors, and the City of Paducah,
Kentucky for the construction thereof, and
117HEREAS, said contract has in all respects been
completed and t e work thereunder finished and accepted by the Board of
Commissioners of the City of Paducah on the 27th day of November, 1929,
pursuant to notice duly given and inspection of said work and the
recommendation of acceptance made therefor by the Commissioner of Public
Works of the City of Paducah, Kentucky, mmd pursuant to a motion made by
said Commissioner, which motion was duly adopted by the Board of.
Commissioners, NOY7, THFFFFORE,
BE IT ORDAINFD BY THE BOARD OF COVTT,TI8SIONEPS
OF THE CITY OF PADUCAH, KENTUCKY.
SECTION 1.
That all of the property on both sides of Ninth Street,
from the south property line of Madison Street to the south property
line of Clay Street; and on Eighth Street, from the south property line
of Madison Street to the north property line of Burnett Street, except
the intersection at 8th and Clay Streets; and on Madison Street, from
the west property line of 8th Street to the east property line of 9th
Street, in the City of Paducah, McCracken County, Kentucky, as shown by
the Engineer's Estimates, be, and the same is herebi> assessed for the
;ost of construction of an improved, or asphalt street with all necessary
;urb, gutter, driveways, manholes, intakes, etch basins, drain tile
ind sewer pipe, and all necessary engineering, advertising ^nd legal and
:lerical service in connpr.tinn
lone under the ordinance and contract aforesaid and said assessment is
s follows, to -wit;
ost of paving and excavation
n Madison Street,.,,,,, •.$p4.993412220 per abutting ft,
ost of paving and excavation :,•
n 8th and 9th Streets......:,4.546954906 per abutting ft.
oat of extra •fork....... 0.00082691463
ost of interest........ Per dollar construction cost
3st of engineering and " ' 0.01792810827 per dollar construction cost
isp)at oficonc ....... ..$0.03129712032 per dollar construction cost
est of concrete .Bia_ ter, , , , , 0.30 per lin. ft.
)at of concrete drlveway.,,,,$O.25 per sq. ft.
i
Cost of concrete curb
straight ............. .....$0.50 per lin, ft.
Cost of concrete curb
curved........... ..§0.60 per lin. ft.
Cost of concrete header .... §0.35 p5r lin. ft.
Cost of concrete gutter
rebuilt ....................$0.50 per lin. ft.
As shown by the Engineer's estimates on file in the office of the
Commissioner of Public '"forks, which estimates are adopted and'made
part hereof.
SECTION 2.
That all of the funds derived from the assessment of said
property aforesaid shall be used for the purpose of paying off the
tax bills issued against said property, or such bonds as may be
issued by the City of Paducah pursuant to Section 3101 of the
Kentucky Statutes.
SECTION 3.
Page 442
That pursuant to Section 3101 of the Kentucky Statutes, as
amended and re-enacted and now is force, said asses ments may be,
at the option of the property owners, -payable in cash within thirty
days from the date of the passing and recording of this ordinance,
or in ten annual installments, pursuant to the provisions of said
Statutes.
SPCTION 4.
In order to provide a fund for the immediate payment of the
cost of that portion of the special assessments herein provided
for, and which may be paid on the ten year installment plan, as
hereinbefore provided for, the City of Paducah may issue and sell
improvement bonds, and to secure the payment of �%bich bonds there
Is hereby pledged such taxes and liens upon the property assessed
herein for the payment of the principal and interest on such bonds,
but said bonds shall not be sold for less than par and the proceeds
thereof applied exclusively to payment for the improvement of said
street as hereinbefore mentioned, and such bonds, if issued, shall
bear interest and shall be payable in accordance with the provisions
of Section 3101 of the Kentucky Statutes, as amended and re -
by the General Assembly of the Commom:aealth of Kentucky and
force and effect,.
SECTION 5.
This ordinance shall take effect and be in force fro
after its passage, record and publication.
Signed
hl a yor
Passed by the Board of Commissioners November 27, 19
Recorded by Hunt Crossland, Clerk, November 28, 1929