Loading...
HomeMy WebLinkAboutMO # 1696MUNICIPAL ORDER NO. 1696 A MUNICIPAL ORDER AMENDING THE SCHEDULE OF FEES AND CHARGES FOR SOLID WASTE PICK UP PURSUANT TO THE SOLID WASTE ORDINANCE, CHAPTER 94, SOLID WASTE, OF THE CODE OF ORDINANCES OF THE CITY OF PADUCAH, KENTUCKY BE IT ORDERED BY THE CITY OF PADUCAH, KENTUCKY: SECTION 1. By Municipal Order the Board of Commissioners of the City of Paducah hereby amends the schedule of fees and charges attached hereto for solid waste pick up, pursuant to the Code of Ordinances of the City of Paducah, Kentucky, Chapter 94, Solid Waste Ordinance. More specifically, the revisions are as follows: 1. Reduce the Compost Green Waste Debris Tipping Fees and reduce the types of Tipping Fees (see attached tipping fee schedule). 2. Allow Short -Term Suspension of Tipping Fees from time -to -time at the Compost Facility as necessary in order to accumulate Green Waste Debris that is essential for the composting operation. 3. Allow the Temporary Closure of the Compost Facility during Compost Grinding Operations. SECTION 2. This Order shall be in full force and eff ct from and after the date of its adoption. A Mayor ATTEST: J6,rr� 6&7A, Tammara S. Sanderson, City Clerk Adopted by the Board of Commissioners, November 13, 2012 Recorded by Tammara S. Sanderson, November 13, 2012 \mo\solid waste fees 11-2012 SOLID WASTE COLLECTION RATES (EFFECTIVE 7/1/08) Residential - 90 Gallon Rollout Number of Containers 1 2 3 4 5 6 New Fee $16.50 $25.00 $34.00 $42.00 $51.00 $60.00 Commercial - 90 gallon Rollout Number of Containers 1 2 3 4 5 New Fee $29.00 $37.00 $46.00 $54.00 $63.00 Surcharge for Vertical Waste Compactors for 2nd Street Alley Project (Specific addresses are attached as "Exhibit A") Residential $10.00 Business $15.00 Restaurant $20.00 Residential Commercial Dumpsters 2 Cubic Yard Collections per Week 1 2 3 New Fee $60.00 $120.00 $179.00 4 Cubic Yard Collections per Week 1 2 3 New Fee $86.00 $167.00 $250.00 6 Cubic Yard Collections per Week 1 2 3 New Fee $106.00 $213.00 $319.00 Additional Collections $42.00 Additional Collections $48.00 Additional Collections $58.00 8 Cubic Yards Collections per Week 1 2 3 4 5 6 New Fee $130.00 $259.00 $389.00 $518.00 $648.00 $778.00 Cardboard Construction Dumpster New Fee $56.00 $85.00 7.5% INCREASE FOR COMMERCIAL AND RESIDENTIAL Pursuant to Ordinance 94-31 The fees for rollouts provided to private parties and non -city events are as follows: Charges for rollouts provided to private parties, neighborhood associations and special events include delivery, collection and one time trash dump. • $25.00 for 1 to 6 rollouts for an overnight or weekend event. This includes delivery, pickup, and one time dump. • $45.00 for 7 to 10 rollouts for an overnight or weekend event. This includes delivery, pickup, and one time dump. • $15.00 per rollout charge for each additional dump. • $25 an hour for deliveries outside normal working hours that requires overtime. Additional Colk $65.00 • No charge to churches that provide a seven-day notice request. • No charge to Neighborhood Associations that pick up a rollout, have it dumped on their normal collection day and return the empty rollout(s). Increase back door collection service fee for non -handicap residents to $45.00 plus the cost of the rollout(s). There will be no fee for handicap resident back door pickup service. Pursuant to Ordinance 94-31 & 94-32 Charge for residential and commercial "call-back" services. The rate for returning to a residential customer will be $25 and $45 for commercial establishments. Pursuant to Ordinance 94-31 i`n�st Dumping (tipping) Cee _ Nen City ResQeRt, Green Waste Debris Disposal Tipping Fee 1. No Charge for City Residents. 2. Commercial lawn service organizations shall provide a copy of a current City of Paducah occupational business license and the address where the Green Waste Debris or leaves were collected. 3. The City Engineer -Public Works Director or his/her designee is authorized to suspend the collection of Green Waste Debris at the Compost Facility if it is determined that the Compost Facility is at/or near full capacity. 4. The City Manager, City Engineer -Public Works Director or his/her designee is authorized to temporarily suspend tamping fees sbarges for the disposal of leaves collected by commercial lawn service organizations working for City residents during the leaf season All n_em-Ea..1 lawn `enii__ _ gaRizatinns shall provide --- ad-d-ree.s of the Dart Gah r sides where the leaves a nnllented 5. The City Engineer -Public Works Director or his/her designee is authorized to temporarily suspend tipping fees on a short-term basis as necessary in order to accumulate Green Waste Debris that is essential for the composting operation. Piek up T -Fu $20.00 Single A -me! $25.00 Small T-Failer- (under- 16') $20.00 Double Axel $35.00 Large Trailer- (ever- 16') Q'� Tz=iPf`Axel $45.00 Leaf x N5 zc V Green Waste Debris Disposal Tipping Fees: • Pick -Up Truck and Small Trailer $ 5.00 • Larger Trailer and Single Axle Dump Truck $10.00 • Double Axle and Triple Axle Dump Truck $25.00 • 20 cubic yards and over $50.00 Compost Purchase 1. All Customers. 2. Fee per 2'/z -yard bucket. RGW 1.. reale *.-.evr�rae Wood Chis $5.00 N/A Wood Chip Compost $5.00 N/A Leaf Compos $10.00 $15.00 Premium Compost I $10.00 I $15.00 Temporary Closure of the Compost Facility The City Engineer -Public Works Director or his/her designee is authorized to temporarily close the Compost Facility to the Public during debris grinding operations. Pursuant to Ordinance 94-33 Increase construction dumpster fee to $85 for delivery. The dump fee will be based on the current CWI tipping fee and dependent on the type(s) and weight of material weight based on the following chart. Staff will provide basic weigh calculation information prior to delivery; final charges will be determined when the dumpster is emptied. Light Loose Lumber 1 Cubic Yard 150 lbs Sheetrock 1 Cubic Yard (394 lbs) Medium Asphalt Shingle Roofing 1 Cubic Yard 419 lbs Wood Shake Shin le Roofing 1 Cubic Yard 435 lbs Mixed Structural Construction Materials 1 Cubic Yard 500 lbs Metals 1 Cubic Yard 906 lbs Heavv Mixed Inerts (dirt, bricks, concrete, asphalt, shingles, structural materials) 1 Cubic Yard (1 ton) Dirt, Brick, Concrete, Asphalt (separated from 1 Cubic Yard (1 ton) other materials) Asphalt/Tar Roofing 1 Cubic Yard 1.5 tons EXHIBIT A City of Paducah Solid Waste Monthly Surcharge for use of the 2nd Street Alley Vertical Waste Compactors Monthly Surcharges include the following address locations: Including all Units, Suites, Apartments and Condos North 2nd Street - 117 North 2nd Street North 3rd Street 114 North 3rd Street 128 North 3rd Street Broadway - All Odd Addresses in the 200 Block of Broadway 201 Broadway thru 231 Broadway