HomeMy WebLinkAboutMO # 1696MUNICIPAL ORDER NO. 1696
A MUNICIPAL ORDER AMENDING THE SCHEDULE OF FEES
AND CHARGES FOR SOLID WASTE PICK UP PURSUANT TO THE SOLID
WASTE ORDINANCE, CHAPTER 94, SOLID WASTE, OF THE CODE OF
ORDINANCES OF THE CITY OF PADUCAH, KENTUCKY
BE IT ORDERED BY THE CITY OF PADUCAH, KENTUCKY:
SECTION 1. By Municipal Order the Board of Commissioners of the
City of Paducah hereby amends the schedule of fees and charges attached hereto for solid
waste pick up, pursuant to the Code of Ordinances of the City of Paducah, Kentucky,
Chapter 94, Solid Waste Ordinance. More specifically, the revisions are as follows:
1. Reduce the Compost Green Waste Debris Tipping Fees and reduce the
types of Tipping Fees (see attached tipping fee schedule).
2. Allow Short -Term Suspension of Tipping Fees from time -to -time at
the Compost Facility as necessary in order to accumulate Green Waste
Debris that is essential for the composting operation.
3. Allow the Temporary Closure of the Compost Facility during Compost
Grinding Operations.
SECTION 2. This Order shall be in full force and eff ct from and after the
date of its adoption.
A
Mayor
ATTEST:
J6,rr� 6&7A,
Tammara S. Sanderson, City Clerk
Adopted by the Board of Commissioners, November 13, 2012
Recorded by Tammara S. Sanderson, November 13, 2012
\mo\solid waste fees 11-2012
SOLID WASTE COLLECTION RATES
(EFFECTIVE 7/1/08)
Residential - 90 Gallon Rollout
Number of Containers 1 2 3 4 5 6
New Fee $16.50
$25.00 $34.00 $42.00 $51.00 $60.00
Commercial - 90 gallon Rollout
Number of Containers 1 2 3 4 5
New Fee $29.00 $37.00 $46.00 $54.00 $63.00
Surcharge for Vertical Waste Compactors for 2nd Street Alley Project (Specific addresses
are attached as "Exhibit A")
Residential $10.00
Business $15.00
Restaurant $20.00
Residential
Commercial Dumpsters
2 Cubic Yard
Collections per Week 1 2 3
New Fee $60.00 $120.00 $179.00
4 Cubic Yard
Collections per Week 1 2 3
New Fee $86.00 $167.00 $250.00
6 Cubic Yard
Collections per Week 1 2 3
New Fee $106.00 $213.00 $319.00
Additional Collections
$42.00
Additional Collections
$48.00
Additional Collections
$58.00
8 Cubic Yards
Collections per Week 1 2 3 4 5 6
New Fee $130.00 $259.00 $389.00 $518.00 $648.00 $778.00
Cardboard Construction Dumpster
New Fee $56.00 $85.00
7.5% INCREASE FOR COMMERCIAL AND RESIDENTIAL
Pursuant to Ordinance 94-31
The fees for rollouts provided to private parties and non -city events are as follows:
Charges for rollouts provided to private parties, neighborhood associations and
special events include delivery, collection and one time trash dump.
• $25.00 for 1 to 6 rollouts for an overnight or weekend event. This includes
delivery, pickup, and one time dump.
• $45.00 for 7 to 10 rollouts for an overnight or weekend event. This includes
delivery, pickup, and one time dump.
• $15.00 per rollout charge for each additional dump.
• $25 an hour for deliveries outside normal working hours that requires
overtime.
Additional Colk
$65.00
• No charge to churches that provide a seven-day notice request.
• No charge to Neighborhood Associations that pick up a rollout, have it
dumped on their normal collection day and return the empty rollout(s).
Increase back door collection service fee for non -handicap residents to $45.00 plus
the cost of the rollout(s). There will be no fee for handicap resident back door pickup
service.
Pursuant to Ordinance 94-31 & 94-32
Charge for residential and commercial "call-back" services. The rate for returning to
a residential customer will be $25 and $45 for commercial establishments.
Pursuant to Ordinance 94-31
i`n�st Dumping (tipping) Cee _ Nen City ResQeRt,
Green Waste Debris Disposal Tipping Fee
1. No Charge for City Residents.
2. Commercial lawn service organizations shall provide a copy of a current City of Paducah
occupational business license and the address where the Green Waste Debris or leaves
were collected.
3. The City Engineer -Public Works Director or his/her designee is authorized to suspend the
collection of Green Waste Debris at the Compost Facility if it is determined that the
Compost Facility is at/or near full capacity.
4. The City Manager, City Engineer -Public Works Director or his/her designee is authorized
to temporarily suspend tamping fees sbarges for the disposal of leaves collected by
commercial lawn service organizations working for City residents during the leaf season
All n_em-Ea..1 lawn `enii__ _ gaRizatinns shall provide
--- ad-d-ree.s of the Dart Gah r sides where the leaves a nnllented
5. The City Engineer -Public Works Director or his/her designee is authorized to temporarily
suspend tipping fees on a short-term basis as necessary in order to accumulate Green
Waste Debris that is essential for the composting operation.
Piek up T -Fu $20.00 Single A -me! $25.00
Small T-Failer- (under- 16') $20.00 Double Axel $35.00
Large Trailer- (ever- 16') Q'� Tz=iPf`Axel $45.00
Leaf x N5 zc V
Green Waste Debris Disposal Tipping Fees:
• Pick -Up Truck and Small Trailer $ 5.00
• Larger Trailer and Single Axle Dump Truck $10.00
• Double Axle and Triple Axle Dump Truck $25.00
• 20 cubic yards and over $50.00
Compost Purchase
1. All Customers.
2. Fee per 2'/z -yard bucket.
RGW 1.. reale
*.-.evr�rae
Wood Chis
$5.00
N/A
Wood Chip Compost
$5.00
N/A
Leaf Compos
$10.00
$15.00
Premium Compost I $10.00 I $15.00
Temporary Closure of the Compost Facility
The City Engineer -Public Works Director or his/her designee is authorized to temporarily close
the Compost Facility to the Public during debris grinding operations.
Pursuant to Ordinance 94-33
Increase construction dumpster fee to $85 for delivery. The dump fee will be based on
the current CWI tipping fee and dependent on the type(s) and weight of material weight
based on the following chart. Staff will provide basic weigh calculation information prior
to delivery; final charges will be determined when the dumpster is emptied.
Light
Loose Lumber 1 Cubic Yard 150 lbs
Sheetrock 1 Cubic Yard (394 lbs)
Medium
Asphalt Shingle Roofing
1 Cubic Yard
419 lbs
Wood Shake Shin le Roofing
1 Cubic Yard
435 lbs
Mixed Structural Construction Materials
1 Cubic Yard
500 lbs
Metals
1 Cubic Yard
906 lbs
Heavv
Mixed Inerts (dirt, bricks, concrete, asphalt,
shingles, structural materials)
1 Cubic Yard (1 ton)
Dirt, Brick, Concrete, Asphalt (separated from
1 Cubic Yard (1 ton)
other materials)
Asphalt/Tar Roofing
1 Cubic Yard 1.5 tons
EXHIBIT A
City of Paducah Solid Waste Monthly Surcharge
for use of the 2nd Street Alley Vertical Waste Compactors
Monthly Surcharges include the following address locations:
Including all Units, Suites, Apartments and Condos
North 2nd Street -
117 North 2nd Street
North 3rd Street
114 North 3rd Street
128 North 3rd Street
Broadway - All Odd Addresses in the 200 Block of Broadway
201 Broadway thru 231 Broadway