HomeMy WebLinkAbout2020-03-8626ORDINANCE NO. 2020-03-8626
AN ORDINANCE AUTHORIZING THE MAYOR TO EXECUTE A
PROFESSIONAL SERVICES AGREEMENT WITH BFW
ENGINEERING & TESTING, INC. IN AN AMOUNT OF $154,036
FOR SURVEY, ROADWAY AND STRUCTURE DESIGN FOR
THE BUCKNER LANE BRIDGE REPLACEMENT OVER
CROOKED CREEK
WHEREAS, the bridge report provided by the Kentucky Transportation Cabinet on
September 30, 2019, rated the bridge on Buckner Lane over Crooked Creek as Poor overall with
a substructure geometry rating of substandard; and
WHEREAS, pursuant to Section 2-659(1) of the City of Paducah Procurement Code, an
Emergency was declared on January 23, 2020 necessitating the immediate replacement of the
Buckner Lane Bridge over Crooked Creek; and
WHEREAS, BFW Engineering & Testing, Inc. has submitted a proposal for survey,
roadway design and structure design for the bridge/box culvert for the Buckner Lane Bridge
replacement over Crooked Creek; and
WHEREAS, a written determination has been made by the City Manager that this
constitutes a professional services purchase and will be a noncompetitive negotiation purchase,
pursuant to KRS 45A.380(3).
NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COMMISSIONERS
OF THE CITY OF PADUCAH, KENTUCKY:
SECTION 1. The City Commission does hereby accept the proposal of BFW
Engineering & Testing, Inc. to provide professional engineering services for the Buckner Lane
Bridge Project in an amount of $154,036.
SECTION 2. The City Commission does hereby authorize and instruct the Mayor
to execute the Professional Services Agreement with BFW Engineering & Testing, Inc. on behalf
of the City of Paducah.
SECTION 3. This expenditure shall be charged to the Flood Mitigation -Bridge
Design Project No. PF0077.
SECTION 4. This ordinance shall be read on two separate days and will become
effective upon summary publication pursuant to KRS C24.
Bran i Harless, Mayor
ATTEST:
Lindsay Parish, Ci Jerk
Introduced by the Board of Commissioners, March 10, 2020
Adopted by the Board of Commissioners, March 31, 2020
Recorded by Lindsay Parish, City Clerk, March 31,2020
Published by The Paducah Sun, April 3, 2020
\ord\eng\agree - BFW Buckner Lane Bridge Professional Engineering Services