Loading...
HomeMy WebLinkAbout2020-03-8620ORDINANCE NO. 2020-03-8620 AN ORDINANCE AUTHORIZING THE MAYOR TO EXECUTE A PROFESSIONAL SERVICES AGREEMENT WITH BFW ENGINEERING & TESTING, INC. IN AN AMOUNT NOT TO EXCEED $52,204 FOR THE FLOODWALL SEAL CLOSURE PROJECT WHEREAS, on July 25, 2017, the City of Paducah and the U.S. Army Corp of Engineers entered into a Project Partnership Agreement (PPA) authorizing the construction of the Ohio River Shoreline, Paducah, Kentucky, Reconstruction Project for flood risk management; and WHEREAS, federal regulations require cost-sharing for the PPA of 65% Federal Share and 35% Non -Federal Sponsor Share. The Non -Federal Sponsor Share includes both cash and in- kind contributions; and WHEREAS, as part of the City's in-kind contribution, a fee proposal has been requested for design plans suitable for bidding for the permanent closure or alteration of 13 floodwall openings; and WHEREAS, BFW Engineering & Testing has proposed a not -to -exceed fee of $52,204 for the preparation of bid plans including a plan and section of each opening, surveying of two openings where plans do not exist, use of existing technical drawings where available, technical specifications, design meetings, construction administration during construction, pre -placement inspection for each concrete placement, inspection and sample collection during each concrete placement, and sample testing; and WHEREAS, a written determination has been made by the City Manager that this constitutes a professional services purchase and will be a noncompetitive negotiation purchase, pursuant to KRS 45A.380(3). NOW, THEREFORE, BE IT ORDAINED BY THE BOARD OF COMMISSIONERS OF THE CITY OF PADUCAH, KENTUCKY: SECTION 1. The City Commission does hereby accept the proposal of BFW Engineering & Testing, Inc. to provide professional services for the Floodwall Seal Closure Project in an amount not to exceed $52,204. SECTION 2. The City Commission does hereby authorize and instruct the Mayor to execute the Professional Services Agreement with BFW Engineering & Testing, Inc. on behalf of the City of Paducah. FW0011. SECTION 3. This expenditure shall be charged to the Seal Closures Project No. SECTION 4. This ordinance shall be read on two separate days and will become effective upon summary publication pursuant to KRS Chapter 424. Brandi Harless, Mayol ATTEST: Lindsay Parish, Citoerk Introduced by the Board of Commissioners, February 25, 2020 Adopted by the Board of Commissioners, March 10, 2020 Recorded by Lindsay Parish, City Clerk, March 10, 2020 Published by The Paducah Sun, March 12, 2020 \ord\eng\agree - BFW Floodwall Seal Closure Project