Loading...
HomeMy WebLinkAbout2007-10-7343ORDINANCE NO. 2007-10-7343 AN ORDINANCE AUTHORIZING AND DIRECTING THE MAYOR TO EXECUTE AN ENGINEERING SERVICE CONTRACT WITH FLORENCE & HUTCHESON, INC. FOR PROFESSIONAL SERVICES ASSOCIATED WITH THE FLOODWALL PIPE REHABILITATION ASSESSMENT WHEREAS, the U.S. Army Corps of Engineers completed a Flood Damage Reduction Analysis Report in May, 2000; and WHEREAS, the Corps report noted significant deterioration of the corrugated metal pipes that are located along the floodwall corridor and recommended rehabilitation of certain corrugated metal pipes; and WHEREAS, the City desires to evaluate all pipes crossing through the floodwall and to obtain an analysis of the necessary repairs required to complete the Floodwall Pipe Rehabilitation Project. This initial project will be associated with the overall Paducah Flood Protection Restoration; and WHEREAS, Florence & Hutcheson, Inc., has in its employ persons experienced in this area of expertise; and WHEREAS, in accordance with the current language of the Water Resources Development Act (WRDA) bill, the City of Paducah will receive credit toward any expenditures made related to the Floodwall Pipe Rehabilitation Project. BE IT ORDAINED BY THE CITY OF PADUCAH, KENTUCKY: SECTION 1. That the Mayor of the City of Paducah is hereby authorized and directed to execute an Engineering Service Contract with Florence & Hutcheson, Inc., in an amount not to exceed $163,800.00 for professional engineering services to assess approximately 77 gravity pipes crossing through the floodwall. SECTION 2. This expenditure shall be charged to Floodwall Restoration DT0019 account. SECTION 3. This ordinance shall be read on two separate days and will become effective upon summary publication pursuant to KRS Chapter 424. ATTEST: Tammara S. Brock, City Clerk Introduced by the Board of Commissioners, September 25, 2007 Adopted by the Board of Commissioners, October 9, 2007 Recorded by Tammara S. Brock, City Clerk, October 9, 2007 Published by The Paducah Sun, October 16, 2007 \ord\eng\contract-F&H floodwall pipe rehab assmt 410