Loading...
HomeMy WebLinkAbout2018-05-8532211715 ORDINANCE NO. 2018 – 5-8532 AN ORDINANCE OF THE CITY OF PADUCAH KENTUCKY, APPROVING A FIRST AMENDMENT TO THE PROFESSIONAL SERVICE AGREEMENT FOR ENGINEERING SERVICES REQUIRED TO COMPLETE THE PROJECT DESIGN PLANS, CONSTRUCTION ADMINISTRATION AND INSPECTION SERVICES FOR THE IMPROVEMENT OF FLOOD CONTROL PUMP STATIONS #2 AND 99 WITH HDR ENGINEERING, INC.; AND AUTHORIZING THE EXECUTION OF SAID FIRST AMENDMENT WHEREAS, on August 30, 2016, the City and HDR Engineering, Inc., (the "Engineer") entered into a Short Form Agreement for Professional Services (the "Agreement") whereby the City engaged the Engineer to provide professional engineering, design, consulting and related services in connection with the improvement and rehabilitation of Flood Control Pump Stations #2 and 49 (the "Project"); and WHEREAS, the services to be rendered by the Engineer are a part of a larger project and agreement between the City and the U.S. Department of the Army (the "USAGE") for the design of the Floodwall Rehabilitation Project (a/k/a Ohio River Shoreline Reconstruction Project); and WHEREAS, subsequent to the commencement of the services by the Engineer, USACE requested that unforeseen components be added to the design, construction administration, inspection services of Pump Station # 2, which has resulted in significant expansion of the services to be rendered by the Engineer as to Flood Control Pump Station #2 under the Agreement; and WHEREAS, the City and the Engineer are in agreement to amend the Agreement in order to accommodate the expansion of the Scope of Services by the Engineer and to adjust the compensation of the Engineer for the additional services; and BE IT ORDAINED BY THE BOARD OF COMMISSIONERS OF THE CITY OF PADUCAH, KENTUCKY: SECTION 1. Recitals and Authorization. The City hereby approves the First Amendment to the Professional Service Agreement with HDR Engineering. Inc., which expands the scope of services to be rendered by the Engineer in connection with the design, construction administration, inspection services of Flood Control Pump Station # 2 as required by USACE. It is further determined that it is necessary and desirable and in the best interests of the City to enter into this First Amendment for the purposes therein specified. Further, the Mayor of the City is hereby authorized to execute the First Amendment in substantially the form attached hereto as Exhibit A and made part hereof, with such changes in the First Amendment not inconsistent with this Ordinance and not substantially adverse to the City as may be approved by the official executing the same on behalf of the City. The approval of such changes by said official, that such are not substantially adverse to the City, shall be conclusively evidenced by the execution of the First Amendment by such official. SECTION 2. Compensation. Pursuant to the First Amendment and as a result of the expansion of the scope of services, the City shall compensate HDR Engineering, Inc., in a lump sum amount of $93,683.46 for the engineering design services for Flood Control Pump Stations #2 and #9. Additional compensation for the construction administration and inspection services conducted during the construction of the rehabilitation of Flood Control Pump Stations #2 and #9 in accordance with Exhibit A, Scope of Services, Items IV & V—Time & Material Rates, of the Agreement and in accordance with Exhibit A-1 of the First Amendment in an amount not to exceed $264,478.54. Said compensation paid by the City shall be funded through project account FW0006, account number 040-3315-532-2307. 191 SECTION 3. Severability. If any section, paragraph or provision of this Ordinance shall be held to be invalid or unenforceable for any reason, the invalidity or unenforceability of such section, paragraph or provision shall not affect any of the remaining provisions of this Ordinance. SECTION 4. Compliance With Open Meetings laws. The City Commission hereby finds and determines that all formal actions relative to the adoption of this Ordinance were taken in an open meeting of this City Commission, and that all deliberations of this City Commission and of its committees, if any, which resulted in formal action, were in meetings open to the public, in full compliance with applicable legal requirements. SECTION 5. Conflicts. All ordinances, resolutions, orders or parts thereof in conflict with the provisions of this Ordinance are, to the extent of such conflict, hereby repealed and the provisions of this Ordinance shall prevail and be given effect. SECTION 6. Effective Date. This ordinance shall be read on two separate days and will become effective upon summary publication pursuant to KRS Chapter 424. Mayor Brandi Harless ATTEST: t�h�l Tammara S.Sanderson, City Clerk Introduced by the Board of Commissioners, May 8, 2018 Adopted by the Board of Commissioners, May 29, 2018 Recorded by Tammara S. Sanderson, City Clerk, May 29, 2018 Published by The Paducah Sun, June 1, 2018 ord\eng\agree-amend HDR floodwall pump stations #2 & #9 192 EXHIBIT A 211700 FIRST AMENDMENT TO AGREEMENT BETWEEN CITY OF PADUCAH AND HDR ENGINEERING, INC., FOR PROFESSIONAL SERVICES THIS FIRST AMENDMENT TO AGREEMENT (this "Amendment") made and entered into on this day of May, 2018 (the "Effective Date") by and among the CITY OF PADUCAH, a Kentucky home rule class city having an address of 300 South 5t' Street, PO Box 2267, Paducah, KY 42002-2267 (hereinafter referred to as the "City") and HDR ENGINEERING, INC., ("Engineer") for professional services in connection with the project known as Pump Stations #2 & #9 Improvements (the "Project"). WITNESSETH: WHEREAS, on August 30, 2016, the City and the Engineer, entered into a Short Form Agreement for Professional Services (the "Agreement") whereby the City engaged the Engineer to provide professional engineering, consulting and related services (the "Services") in connection with the Project; and WHEREAS, the Services to be rendered by Engineer were described in Section I, Scope of Services; and WHEREAS, the Services to be rendered by Engineer are a part of a larger project and agreement between the City and the U.S. Department of the Army (the "USACE") for the design of the Floodwall Rehabilitation Project (a/k/a Ohio River Shoreline Reconstruction Project); and WHEREAS, subsequent to the commencement of the Services by Engineer, USACE requested that unforeseen components be added to the design and construction administration of Pump Station # 2, which has resulted in significant expansion of the Services to be rendered by Engineer as to Pump Station #2 under the Agreement; and WHEREAS, the City and Engineer are in agreement to amend the Agreement in order to accommodate the expansion of the Scope of Services by the Engineer and to adjust the compensation of the Engineer for the additional services; and NOW THEREFORE, for and in consideration of $1.00 cash in hand paid, the receipt and sufficiency is hereby acknowledged by all parties, and the mutual covenants and conditions contained herein the parties agree as follows: 1. Amendments to the Agreement. As of the Effective Date, the Agreement is amended as follows: 1.1. SECTION I, SCOPE OF SERVICES, of the Agreement is hereby deleted in its entirety and replaced with the following: SECTION I. SCOPE OF SERVICES ENGINEER will provide Services for the Project, which consist of the Scope of Services as outlined on the attached Exhibit A and Exhibit A-1. 1.2. The City and the Engineer expressly agree that Exhibit A-1 "Design Services During Construction - Scope of Services", which is attached hereto, is hereby added and incorporated into the Agreement. 1.3. SECTION IV, COMPENSATION, of the Agreement is hereby deleted in its entirety and replaced with the following: 193 SECTION IV. COMPENSATION Compensation for ENGINEER'S services under this Agreement shall be on the basis of: - lump sum (Scope of Services Items I -III of Exhibit A and Exhibit A-1). The amount of the lump sum is Ninety Three Thousand Six Hundred Eighty -Three and 46/100 Dollars. ($93, 683.46) . - Hourly (Scope of Services Items IV-V of Exhibit A and Exhibit A-1) - based on hourly rates for an estimated not to exceed the amount of Two Hundred Sixty -Four Thousand Four Hundred Seventy -Eight and 54/100 Dollars ($264,478.54) in accordance with the hourly rates listed in the attached Exhibit A. Compensation terms are defined as follows: Lump Sum shall mean a fixed amount which shall be the total compensation agreed upon in advance for Scope of Services. 2. Reaffirmation of the Agreement. Except for the modifications set forth herein, all other terms and provisions of the Agreement entered into between the parties are expressly acknowledged, reaffirmed, and ratified by all parties hereto. All parties hereby agree to perform in strict accordance with the terms and provisions as set forth under the Agreement. 3. Miscellaneous Provisions. This Amendment shall be fully binding upon the parties hereto and their successors, and assigns as of the Effective Date. This Amendment or the Agreement shall not be altered, amended, modified, terminated, waived, released, or discharged, except in a writing signed by the parties or their successors or assigns. This Amendment may be executed in any number of counterparts and by different parties hereto on separate counterparts each of which, when so executed, shall be deemed an original, but all such counterparts shall constitute one and the same agreemOnt. IN WITNESS WHEREOF, the parties have respectively caused this Amendment to be executed on the day and year first above written. HDR ENGINEERING, INC. "Engineer" BY: NAME: TITLE: ADDRESS: 2517 Sir Barton Way Lexington, KY 40509 City of Paducah, Kentucky "City" BY: NAME: Brandi Harless TITLE: Mayor 194 ADDRESS: 300 South 5"' Street PO Box 2267 Paducah, KY 42002 195 EXHIBIT A-1 DESIGN SERVICES DURING CONSTRUCTION SCOPE OF SERVICES See attached. 196