Loading...
HomeMy WebLinkAbout2012-3-7909ORDINANCE NO. 2012-3-7909 AN ORDINANCE ACCEPTING THE BID FOR THE CITY OF PADUCAH'S CALENDAR YEARS 2012 AND 2013 CONCRETE PROGRAM, AND AUTHORIZING THE MAYOR TO EXECUTE A CONTRACT FOR SAME BE IT ORDAINED BY THE CITY OF PADUCAH, KENTUCKY: SECTION 1. That the City of Paducah accepts the bid of Harper Construction, LLC, for the calendar years 2012 and 2013 concrete program, with the option of a one-year extension, said bid being in substantial compliance with the bid specifications, and as contained in the bid of Harper Construction, LLC, of February 16, 2012, for the following unit prices and hourly rates: CONCRETE REMOVAL AND REPLACEMENT ITEM NO DESCRIPTION UNIT UNIT BID PRICE 1 Curb & Gutter (Remove & Construct) L.F. $37.75 2 Curb & Gutter (New Construction) L.F. $22.26 3 Concrete Sidewalk S.Y. $57.40 4 Concrete Sidewalk (New Construction) S.Y. $42.80 5 Concrete Handicap Ramp S.Y. $62.00 6 Concrete Entrance Pavement — 6" S.Y. $61.25 7 Concrete Entrance Pavement — 8" S.Y. $65.90 8 Concrete Entrance Pavement — 6" M -Mix S.Y. $73.25 9 Concrete Entrance Pavement - 8" M -Mix S.Y. $78.25 10 Granite Curb Reset with new Concrete Gutter L.F. $44.06 11 Gutter Replacement — Granite Curb in Place L.F. $36.55 12 Concrete Barrier Median S.Y. $74.00 13 Concrete Header Curb —12" L.F. $27.75 14 Concrete Header Curb —18" L.F. $35.50 15 Non -Reinforced Concrete 8" S.Y. $60.50 16 Inlet Repair (Existing) Each $781.50 17 Reinforced Concrete New Construction —Class A C.Y. $1000.00 18 Deep Saw Cut L.F. $6.00 19 Perforated Pipe — 4" L.F. $16.25 EXCAVATION WORK ITEM NO DESCRIPTION UNIT UNIT BID PRICE 1 Trackhoe HR $120.00 2 Backhoe HR $95.00 3 Compactor/Roller HR $79.00 4 Dump Truck HR $92.50 5 Backhoe with Breaker HR $100.00 6 Small Dozer HR $122.00 7 Laborer HR $58.50 SECTION 2. The Mayor is hereby authorized to execute a contract with Harper Construction, LLC, for concrete work at the unit prices and hourly rates as accepted in Section 1 above, according to the specifications, bid proposal and contract documents heretofore approved and incorporated in the bid of February 16, 2012. SECTION 3. The contract shall be binding upon the City and the Contractor, his partners, successors, assigns and legal representatives for 2012-2013 calendar years ending December 31, 2013. Neither the City nor the Contractor shall have the right to assign, transfer, or sublet their interests or obligations hereunder without consent of the other party. Further, the Mayor is hereby authorized, subsequent to the recommendation of the City Engineer -Public Works Director, to execute an additional One -Year Renewal Agreement extending the contract period for the 2014 calendar year ending December 31, 2014 upon the mutual agreement of both parties. If agreed, this renewal option shall be exercised by both parties executing and delivering the written One -Year Renewal Agreement. The City reserves the right to have concrete work completed at the quoted prices until the parties have executed the One -Year Renewal Agreement. However, in no case shall the Seller be bound to sell the contract material at these prices past December 31, 2013. SECTION 4. Expenditures for the City's concrete program shall be charged to various accounts. SECTION 5. This ordinance shall be read on two separate days and will become effective upon summary publication pursuant to KRS Chapter 424. ATTEST: jm_ L�(.fit-L� Tammara S. Brock, City Clerk Introduced by the Board of Commissioners, March 13, 2012 Adopted by the Board of Commissioners, March 20, 2012 Recorded by Tammara S. Brock, City Clerk, March 20, 2012 Published by The Paducah Sun, March 24, 2012 \ord\eng\concrete program 2012 & 2013