Loading...
HomeMy WebLinkAboutMO # 1834344 MUNICIPAL ORDER NO. 1834 A MUNICIPAL ORDER AMENDING SECTIONS (H) ENGINEERING/PUBLIC WORKS DEPARTMENT TO DELETE THE POSITION OF MASTER ELECTRICIAN AND CREATE THE POSITION OF JOURNEYMAN ELECTRICIAN OF THE FY2014-2015 POSITION AND PAY SCHEDULE FOR THE EMPLOYEES OF THE CITY OF PADUCAH, KENTUCKY BE IT ORDERED BY THE CITY OF PADUCAH, KENTUCKY: SECTION 1. That the City of Paducah hereby amends Section (H) Engineering\Public Works Department to delete the position of Master Electrician and create the position of Journeyman Electrician of the FY2014-2015 Position and Pay Schedule for the employees of the City of Paducah as attached hereto. SECTION 2. This Order will be in full force and effect from and after the date of its adoption. ATTEST: Tammara S. Sanderson, City Clerk Adopted by the Board of Commissioners, April 14, 2015 Recorded by Tammara S. Sanderson, City Clerk, April 14, 2015 mo/Position and Pay Schedule 4 14 15 7 r 1 —1 1 11 i, I . 11 1 7-- 1:7 — .�a. —`.I 345 Street Division Section H. AUTHORIZED POSITIONS EPW Street Superintendent 1 1 EPW Street Supervisor 2 1 BUDGET HOURLY 1 Equipment Operator 4 ENGINEERINGIPUBLIC WORKS DEPT. FILLED VACANT WAGE ADJ. HOURS EXEMPT PAY POSITIONS TOTAL NON -CS RCSSICS RATE WORK NONEXEMPT GRADE City Engineer & Public Works Director 1 1 55.77 40 E Z Storm Water & Drainage Engineer 1 1 26.42 40 E R Engineering Project Manager 1 1 28.85 37.5 NE N EPW Operations Manager 1 1 27.04 40 E 0 Engineering Assistant III 80% 40 E M Engineering Assistant II 90% 1 95% L Engineering Assistant 1 1 1 3 2 J Executive Assistant 1 1 1 16.74 40 NE F Administrative Assistant III 1 1 14.49 40 NE D Floodwall Division 80% 85% EPW Floodwall Superintendent 1 1 30.33 40 E N Floodwall Operator 4 1 40 NE F 80% 14.90 85% 15.84 90% 16.77 95% 17.70 100% 3 18.64 Street Division EPW Street Superintendent 1 1 EPW Street Supervisor 2 1 1 Equipment Operator 4 80% 85% 90% 95% 100% 4 Concrete Finisher 3 80% 85% 90% 95% 1 100% 1 Right -Of -Way Maintenance Person 11 80% 85% 3 90% 1 95% 100% 3 2 `�,,_.,aintenance Division EPW Fleet/ Maintenance Superinte 1 1 EPW Maintenance Supervisor 1 1 Laborer 6 80% 85% 90% 95% 100% 3 3 1 2 31.80 22.89 21.90 14.78 15.70 16.63 17.55 18.48 14.78 15.70 16.63 17.55 18.48 13.98 14.85 15.72 16.60 17.47 34.15 22.28 13.01 13.82 14.64 15.45 16.26 40 40 E E E NE VA NE E E NE N L L E A C 0 L C Traffic Technician 2 80% 85% 90% 95% 100% 2 nags+e. EIeGtFi is 4 4 Journeyman Electrician 1 1 art, Maintenance Technician 2 NE E 14.90 15.84 16.77 17.70 18.63 NE L NE I NE E 80% 14.90 85% 15.84 90% 16.77 95% 17.70 100% 2 18.63 Fleet Maintenance Division EPW Fleet Supervisor 1 23.30 E Administrative Assistant III 1 18.71 40 NE Fleet Mechanic I NE Fleet Mechanic II 4 NE 1 18.25 1 19.40 1 20.08 1 20.37 Solid Waste Division EPW Solid Waste Superintendent 1 28.15 40 E EPW Solid Waste Supervisor 1 22.70 E EPW Compost Operations Supervisor 1 21.90 E Administrative Assistant III 1 16.93 40 NE Laborer 7 NE 80% 13.01 85% 13.82 90% 14.64 95% 1 15.45 100% 4 2 16.26 Truck Driver 10 NE 80% 13.87 85% 14.74 90% 15.61 95% 16.48 100% 5 5 17.34 Right -Of -Way Maintenance Person 3 NE 80% 13.98 85% 14.85 90% 15.72 95% 16.60 100% 2 1 17.47 Compost Equipment Operator 1 NE 80% 15.12 85% 16.07 90% 17.01 95% 17.96 100% 1 18.90 Total Budgeted/Filled for Department 5 77 47 25 L D G I N L L D C C C F