Loading...
HomeMy WebLinkAboutMO # 1486MUNICIPAL ORDER NO. 1486 A MUNICIPAL ORDER AMENDING THE SCHEDULE OF FEES AND CHARGES FOR SOLID WASTE PICK UP PURSUANT TO THE SOLID WASTE ORDINANCE, CHAPTER 94, SOLID WASTE, OF THE CODE OF ORDINANCES OF THE CITY OF PADUCAH, KENTUCKY TO ESTABLISH A SURCHARGE FOR VERTICAL WASTE COMPACTORS FOR THE 2ND STREET ALLEY PROJECT BE IT ORDERED BY THE CITY OF PADUCAH, KENTUCKY: SECTION 1. By Municipal Order the Board of Commissioners of the City of Paducah hereby amends the schedule of fees and charges attached hereto for solid waste pick up, pursuant to the Code of Ordinances of the City of Paducah, Kentucky, Chapter 94, Solid Waste Ordinance. This amendment will establish a surcharge for vertical waste compactors for the 2nd Street Alley Project. Specific addresses are attached as "Exhibit A". SECTION 2. The rates adopted herein shall be effective on bills rendered on or after November 1, 2009. SECTION 3. This Order shall be in full force and effect from and after the date of its adoption. ATTEST: Jam' o Tammara S. Brock, City Clerk Adopted by the Board of Commissioners, October 13, 2009 Recorded by Tammara S. Brock, October 13, 2009 \mo\solid waste fees 2009 SOLID WASTE COLLECTION RATES (EFFECTIVE 7/1/08) Residential - 90 Gallon Rollout Number of Containers 1 2 3 4 5 6 New Fee $16.50 $25.00 $34.00 $42.00 $51.00 $60.00 Commercial - 90 gallon Rollout Number of Containers 1 2 3 4 5 New Fee $29.00 $37.00 $46.00 $54.00 $63.00 Surcharge for Vertical Waste Compactors for 2nd Street Alley Project (Specific addresses are attached as "Exhibit A") Residential $10.00 Business $15.00 Restaurant $20.00 Residential Commercial Dumpsters 2 Cubic Yard Collections per Week 1 2 3 Additional Collections New Fee $60.00 $120.00 $179.00 $42.00 4 Cubic Yard Collections per Week 1 2 3 Additional Collections New Fee $86.00 $167.00 $250.00 $48.00 6 Cubic Yard Collections per Week 1 2 3 Additional Collections New Fee $106.00 $213.00 $319.00 $58.00 8 Cubic Yards Collections per Week 1 2 3. 4 5 6 New Fee $130.00 $259.00 $389.00 $518.00 $648.00 $778.00 Cardboard Construction Dumpster New Fee $56.00 $85.00 7.5% INCREASE FOR COMMERCIAL AND RESIDENTIAL Pursuant to Ordinance 94-31 The fees for rollouts provided to private parties and non -city events are as follows: Charges for rollouts provided to private parties, neighborhood associations and special events include delivery, collection and one time trash dump. $25.00 for 1 to 6 rollouts for an overnight or weekend event. This includes delivery, pickup, and one time dump. $45.00 for 7 to 10 rollouts for an overnight or weekend event. This includes delivery, pickup, and one time dump. • $15.00 per rollout charge for each additional dump. $25 an hour for deliveries outside normal working hours that requires overtime. Additional CollE $65.00 • No charge to churches that provide a seven-day notice request. • No charge to Neighborhood Associations that pick up a rollout, have it dumped on their normal collection day and return the empty rollout(s). Increase back door collection service fee for non -handicap residents to $45.00 plus the cost of the rollout(s). There will be no fee for handicap resident back door pickup service. Pursuant to Ordinance 94-31 & 94-32 Charge for residential and commercial "call-back" services. The rate for returning to a residential customer will be $25 and $45 for commercial establishments. Pursuant to Ordinance 94-31 Compost Dumping (tipping) Fee - Non City Residents Regular Vehicles $5.00 Dump/Large Trucks Pick-up Truck $20.00 Single Axel $25.00 Small Trailer (under 16') $20.00 Double Axel $35.00 Large Trailer (over 16') $25.00 Triple Axel $45.00 Leaf Box $25.00 Semi Truck $70.00 Compost Fee - 21/2 yard bucket Wood Chis $5.00 N/A Wood Chip Compost $5.00 N/A Leaf Compost $10.00 $15.00 Premium Compost $10.00 $15.00 Pursuant to Ordinance 94-33 Increase construction dumpster fee to $85 for delivery. The dump fee will be based on the current CWI tipping fee and dependent on the type(s) and weight of material weight based on the following chart. Staff will provide basic weigh calculation information prior to delivery; final charges will be determined when the dumpster is emptied. Li Loose Lumber 1 Cubic Yard 150 lbs Sheetrock 1 Cubic Yard 1394 lbs) Medium Asphalt Shingle Roofing 1 Cubic Yard (419 lbs) Wood Shake Shingle Roofing 1 Cubic Yard 435 lbs Mixed Structural Construction Materials 1 Cubic Yard 500 lbs Metals 1 Cubic Yard 906 lbs Heaw Mixed Inerts (dirt, bricks, concrete, asphalt, shingles, structural materials) 1 Cubic Yard (1 ton) Dirt, Brick, Concrete, Asphalt (separated from 1 Cubic Yard (1 ton) other materials) Asphalt/Tar Roofing 1 Cubic Yard 1.5 tons EXHIBIT A City of Paducah Solid Waste Monthly Surcharge for use of the 2nd Street Alley Vertical Waste Compactors Monthlv Surcharaes include the followinq address_ locations: Including all Units, Suites, Apartments and Condos North 2nd Street - 117 North 2nd Street North. 3rd Street 114 North 3rd Street 128 North 3rd Street Broadway - All Odd Addresses in the 200 Block of Broadway 201 Broadway thru 231 Broadway